Adjustments to labour and material escalation


  1. The AER has revised down the labour and material escalation that was proposed by Envestra for its Victorian and Albury networks. Internal and external labour escalation has been revised down. Materials escalation has been revised to nil real. This is discussed in Attachment A of the AER's final decision.

Table 4.36 Victorian network - AER approved capital expenditure(a) by driver category over the 2013–17 access arrangement period ($million, 2011)

  1. Category

2013

2014

2015

2016

2017

Total

Mains replacement

24.8

23.8

24.4

21.9

18.5

113.4

Residential connections

21.0

20.9

20.8

20.5

21.1

104.3

Commercial/industrial connections

3.3

6.2

6.2

5.3

6.5

27.5

Residential meter replacement

2.4

4.8

3.2

7.8

2.5

20.8

Commercial/industrial meter replacement

1.0

1.2

1.7

1.5

1.4

6.8

Augmentation

4.1

7.7

2.0

11.1

1.7

26.7

IT

3.7

7.4

3.0

0.2

0.7

14.9

SCADA

0.2

0.2

0.2

0.2

0.2

1.0

Other

4.1

5.2

4.4

2.6

2.3

18.6

Gas Extensions - Other

12.2

0.0

0.0

0.0

0.0

12.2

Gas Extensions - Energy for the Regions

0.0

5.7

0.0

0.0

0.0

5.7

Overheads

9.1

9.8

8.9

10.2

8.3

46.3

GROSS TOTAL CAPITAL EXPENDITURE

85.9

92.9

74.8

81.3

63.1

398.0

Customer contributions

3.3

1.6

1.6

1.6

1.6

9.5

Government contributions

0.0

7.5

0.0

0.0

0.0

7.5

NET TOTAL CAPITAL EXPENDITURE

82.6

83.9

73.2

79.7

61.6

381.0

Source: AER analysis.

Notes: (a) Including AER material and labour escalation adjustments, excluding network management fee.





Table 4.37 Albury network - AER approved capital expenditure(a) by driver category over the 2013–17 access arrangement period ($million, 2011)

  1. Category

  1. 2013

  1. 2014

  1. 2015

  1. 2016

  1. 2017

  1. Total 2013-17

Mains replacement

0.01

0.01

0.01

0.01

0.01

0.04

Residential connections

0.45

0.53

0.54

0.55

0.56

2.63

Commercial/industrial connections

0.11

0.11

0.11

0.11

0.11

0.53

Residential meter replacement

0.07

0.06

0.09

0.05

0.04

0.32

Commercial/industrial meter replacement

0.03

0.02

0.03

0.02

0.02

0.12

Augmentation

0.01

-

-

-

0.43

0.44

IT

0.13

0.26

0.10

0.00

0.02

0.52

SCADA

0.02

0.02

0.02

0.02

0.02

0.09

Other

0.00

0.00

0.00

0.00

0.00

0.01

Gas Extensions - Other

-

-

-

-

-

-

Gas Extensions - Energy for the Regions

-

-

-

-

-

-

Overheads

0.18

0.22

0.20

0.19

0.23

1.02

GROSS TOTAL EXPENDITURE

0.99

1.23

1.10

0.96

1.45

5.73

Customer contributions

-

-

-

-

-

-

Government contributions

-

-

-

-

-

-

NET TOTAL EXPENDITURE

0.99

1.23

1.10

0.96

1.45

5.73

Source: AER analysis.

Notes: (a) Including AER material and labour escalation adjustments, excluding network management fee.





    1. Yüklə 2,17 Mb.

      Dostları ilə paylaş:
1   ...   15   16   17   18   19   20   21   22   ...   56




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin