Adjustments to labour and material escalation
səhifə 19/56 tarix 09.01.2019 ölçüsü 2,17 Mb. #94320
The AER has revised down the labour and material escalation that was proposed by Envestra for its Victorian and Albury networks. Internal and external labour escalation has been revised down. Materials escalation has been revised to nil real. This is discussed in Attachment A of the AER's final decision.
Table 4.36 Victorian network - AER approved capital expenditure(a) by driver category over the 2013–17 access arrangement period ($million, 2011)
Category
2013
2014
2015
2016
2017
Total
Mains replacement
24.8
23.8
24.4
21.9
18.5
113.4
Residential connections
21.0
20.9
20.8
20.5
21.1
104.3
Commercial/industrial connections
3.3
6.2
6.2
5.3
6.5
27.5
Residential meter replacement
2.4
4.8
3.2
7.8
2.5
20.8
Commercial/industrial meter replacement
1.0
1.2
1.7
1.5
1.4
6.8
Augmentation
4.1
7.7
2.0
11.1
1.7
26.7
IT
3.7
7.4
3.0
0.2
0.7
14.9
SCADA
0.2
0.2
0.2
0.2
0.2
1.0
Other
4.1
5.2
4.4
2.6
2.3
18.6
Gas Extensions - Other
12.2
0.0
0.0
0.0
0.0
12.2
Gas Extensions - Energy for the Regions
0.0
5.7
0.0
0.0
0.0
5.7
Overheads
9.1
9.8
8.9
10.2
8.3
46.3
GROSS TOTAL CAPITAL EXPENDITURE
85.9
92.9
74.8
81.3
63.1
398.0
Customer contributions
3.3
1.6
1.6
1.6
1.6
9.5
Government contributions
0.0
7.5
0.0
0.0
0.0
7.5
NET TOTAL CAPITAL EXPENDITURE
82.6
83.9
73.2
79.7
61.6
381.0
Source: AER analysis.
Notes: (a) Including AER material and labour escalation adjustments , excluding network management fee.
Table 4.37 Albury network - AER approved capital expenditure(a) by driver category over the 2013–17 access arrangement period ($million, 2011)
Category
2013
2014
2015
2016
2017
Total 2013-17
Mains replacement
0.01
0.01
0.01
0.01
0.01
0.04
Residential connections
0.45
0.53
0.54
0.55
0.56
2.63
Commercial/industrial connections
0.11
0.11
0.11
0.11
0.11
0.53
Residential meter replacement
0.07
0.06
0.09
0.05
0.04
0.32
Commercial/industrial meter replacement
0.03
0.02
0.03
0.02
0.02
0.12
Augmentation
0.01
-
-
-
0.43
0.44
IT
0.13
0.26
0.10
0.00
0.02
0.52
SCADA
0.02
0.02
0.02
0.02
0.02
0.09
Other
0.00
0.00
0.00
0.00
0.00
0.01
Gas Extensions - Other
-
-
-
-
-
-
Gas Extensions - Energy for the Regions
-
-
-
-
-
-
Overheads
0.18
0.22
0.20
0.19
0.23
1.02
GROSS TOTAL EXPENDITURE
0.99
1.23
1.10
0.96
1.45
5.73
Customer contributions
-
-
-
-
-
-
Government contributions
-
-
-
-
-
-
NET TOTAL EXPENDITURE
0.99
1.23
1.10
0.96
1.45
5.73
Source: AER analysis.
Notes: (a) Including AER material and labour escalation adjustments, excluding network management fee.
Dostları ilə paylaş: