A storage area for dangerous residue must be constructed and maintained in conformance to the applicable legislation
The storage zones in which liquids are kept must have tanks and recollection channels that are able to absorb any spills. Furthermore, they should contain material that has the capacity to absorb spills
Access to the storage facility should be denied to anyone that is not authorized so therefore, the access control must be safeguarded
WATER DRAINAGE SYSTEM
It should be cleaned at least once a month and this includes the removal of obstruction
Partial or total connections of the water drainage system to the septic system are not permitted under any circumstance (this could provoke economic sanctions imposed by governmental authorities
GENERAL CLEANING
100% of the residue wastes that are generated by the production services or in the maintenance of the industrial operation of the plant must be removed and deposited according to the Environmental Legislation that is applicable
The visual image of the plant cannot be altered. It is only permitted to carry out adjustments according to the regulations of the park and to current Environmental Legislation
OFFICE FINISHINGS
Offices must be maintained clean and painted
Wallpaper and curtains must be repaired and/or replaced with products of the same quality and appearance and shall be authorized by the lessee
Carpets must be maintained clean, free of dust, oils, paints, and odors
Air conditioning vents, light switches, and contacts that are damaged during the installation of telephones or in the repair of lamps, etc., must be replaced
Doors, offices, pillars, support bearings, frames, cafeteria equipment and furnishings and the kitchenette must receive maintenance with special polishes for wood and different types of finishing and must be repaired at least once a year
EXTERIOR FINISHINGS
Exterior paint and the porosity of the exterior finishing of the original design must be respected and maintained; the molding, brick exteriors, facades, paving stone, and columns should be cleaned with effective products for that function and damaged pieces must be replaced with others of the same quality
FIRE ALARM SYSTEM (IF THE BUILDING HAS ONE)
Tests should be carried out at the starting up of the electric pumps and of the diesel motors and recorded in a log book
The correct functioning should be inspected of the: exterior hydrants, hoses, wall hydrants, smoke detectors, and temperature/heat sensors according to the specifications of the supplier
In the interior lines of the fire alarm system, the rusted areas must be located and repainted
The maintenance program and the procedures carried out must comply with the established norms of the NFPA ( National Fire Protection Association)
MANTENANCE OF LAMPPOSTS
The acrylic screen must be changed at least every two years.
The fluorescent lamps must be changed during a life period of 15,000-20,000 hours
The ballasts must be inspected to verify their correct functioning
EXTERIOR LAMPPOSTS
The correct functioning of the floor and wall lamps
Lamps and other sources of light should be inspected, given maintenance, and repaired, as well as the inspection chambers, exterior panels, flying buttresses, and any other foreign object from the same (trash, nests, etc.)