D2: Amendments required when using CESMM3, Continued



Class A: General Items

Omit: reference to Provisional Sums and Prime Cost Items included in comments just under heading.
No 1. First Division ‘Contractual requirements’

Amend: Coverage Rules C1 to read ‘Items for insurance classed as contractual requirements shall be deemed to include only provision of insurances in accordance with clauses 3.3, 3.6, 3.7. (optional) and 3.8. unless otherwise stated.’
No 2. First Division ‘Specified requirements’

Omit: from Measurement Rules M2 the words ‘……..of which the value is to be ascertained and determined by measurement in accordance with clause 56(1)……’
No 4. First Division ‘Provisional Sums’

Omit: this section completely i.e. First, Second and Third Divisions; Measurement Rules, Definition Rules, Coverage Rules and Additional Description Rules.
No 5. First Division ‘Nominated Sub-contracts which include work on the Site’

Omit: this section completely i.e. First, Second and Third Divisions; Measurement Rules, Definition Rules, Coverage Rules and Additional Description Rules.
No 6. First Division ‘Nominated Sub-contracts which do not include work on the Site’

Omit: this section completely i.e. First, Second and Third Divisions; Measurement Rules, Definition Rules, Coverage Rules and Additional Description Rules.


Class B: Ground Investigation

No 1. First Division ‘Trial pits and trenches’

Amend: ‘Removal of obstructions’ Second Division; change the unit of measurement from ‘h’ to ‘Sum’ (this is a Contractor’s risk for which a lump sum figure for the work described is tendered).

Amend: ‘Pumping’ Second Division; change the unit of measurement from ‘h’ to ‘Sum’ (this is a Contractor’s risk for which a lump sum figure for the work described is tendered).
No 2. First Division ‘Light cable percussion boreholes’

Amend: ‘Chiseling to prove rock or to penetrate obstructions’ Second Division; change the unit of measurement from ‘h’ to ‘Sum’ (this is a Contractor’s risk for which a lump sum figure for the work described is tendered).

Continued on next page

D2: Amendments required when using CESMM3, Continued




Class B: Ground Investigation (Continued)
No 5. First Division ‘Site tests and observations’

Amend: ‘Permeability’ Third Division; change the unit of measurement from ‘h’ to ‘Sum’ (this is a Contractor’s risk for which a lump-sum figure for the work described is tendered).
No 8. First Division ‘Professional Services’

Amend: ‘Technician, Technical Engineer and Engineer or geologist’ Second Division; change the units of measurement from ‘h’ to ‘Sum’(this is a Contractor’s risk for which a lump sum figure for the work described is tendered).


Class C: Geotechnical and Other Specialist Processes
No 6. First Division ‘Diaphragm walls’

Amend: ‘Waterproofed joints’ Second Division to be referred to as ‘Sum’ (this is a Contractor’s risk for which a lump sum figure for the work described is tendered).


Class D: Demolition and Site Clearance
No 4 AND 5. First Division ‘Buildings; other structures’

Amend: ‘Brickwork, Concrete, Masonry, Metal, Timber, No predominant material’ Second Division to be measured should be referred to as ‘Sum’ (this is a Contractor’s risk for which a lump sum figure for the work described is tendered)


Class E: Earthworks
Measurement Rules M1

Omit: Where boundaries between different materials are not shown on the Drawings, the work should be measured as a “Sum” (this is a Contractor’s risk for which a lump sum figure for the work described is tendered).’
No 6. First Division ‘Filling’: Measurement Rule M20

Replace: ‘Where rock filling is deposited into soft areas the volume shall be measured in the transport vehicles at the place of deposition’ with ‘Where rock filling is deposited into soft areas an approximate volume shall be given in the description and referred to as “Sum” (this is a Contractor’s risk for which a lump sum figure for the work described is tendered).

Continued on next page

D2: Amendments required when using CESMM3, Continued




Class E: Earthworks (Continued)
Measurement Rule M21

Replace: ‘Where filling is to be deposited below water, and the quantity cannot be measured satisfactorily by any other means, its volume shall be measured in the transport vehicles at the place of deposition.’ with ‘Where filling is to be deposited below water a “Sum” should be included (this is a Contractor’s risk for which a lump sum figure for the work described is tendered).’


Class Q: Piling Ancillaries
No 7. First Division ‘Obstructions’

Amend: the unit of measurement from ‘h’ to ‘Sum’ (this is a Contractor’s risk for which a lump sum figure for the work described is tendered).


Class Y: Sewer and Water Main Renovation and Ancillary Works
No 8. First Division ‘Interruptions’

Amend: the unit of measurement from ‘h’ to ‘Sum’ (this is a Contractor’s risk for which a lump sum figure for the work described is tendered



Yüklə 2,1 Mb.

Dostları ilə paylaş:
1   ...   19   20   21   22   23   24   25   26   27




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin