Contents preface (VII) introduction 1—37


IRRIGATION AND WATER RESOURCES ENGINEERING 4.10. WELL COMPLETION



Yüklə 18,33 Mb.
səhifə135/489
tarix03.01.2022
ölçüsü18,33 Mb.
#50422
1   ...   131   132   133   134   135   136   137   138   ...   489
156 IRRIGATION AND WATER RESOURCES ENGINEERING
4.10. WELL COMPLETION
After drilling a well, the well screen and filter pack (wherever necessary) are to be placed and the casing removed. If the formations are sufficiently strong and stable, ground water may directly enter the uncased well. In unconsolidated formations, however, a casing with perforation (or a well screen) is needed to support the outside material and also to admit water freely into the well.
The installation of the well screen and the removal of the casing is best done by the pull-back method in which the casing is installed to the full depth of the well and the well screen, whose size is smaller than that of casing, is lowered inside the casing. The casing is then pulled back or lifted far enough to expose the screen to the water-bearing formation (Fig. 4.12).




Casing

Rubber




packer
















Riser




pipe




Well




screen

Drive

Bail

shoe

bottom




Yüklə 18,33 Mb.

Dostları ilə paylaş:
1   ...   131   132   133   134   135   136   137   138   ...   489




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin