Contents preface (VII) introduction 1—37



Yüklə 18,33 Mb.
səhifə156/489
tarix03.01.2022
ölçüsü18,33 Mb.
#50422
1   ...   152   153   154   155   156   157   158   159   ...   489
Fig. 5.3 Alignment of main canal in hills
In order to finalise the channel network for a canal irrigation project, trial alignments of channels are marked on the map prepared during the detailed survey. A large-scale map is required to work out the details of individual channels. However, a small-scale map depicting the entire command of the irrigation project is also desirable. The alignments marked on the map are transferred on the field and adjusted wherever necessary. These adjustments are transferred on the map as well. The alignment on the field is marked by small masonry pillars at every 200 metres. The centre line on top of these pillars coincides with the exact alignment. In between the adjacent pillars, a small trench, excavated in the ground, marks the alignment.



172 IRRIGATION AND WATER RESOURCES ENGINEERING

Yüklə 18,33 Mb.

Dostları ilə paylaş:
1   ...   152   153   154   155   156   157   158   159   ...   489




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin