Contents preface (VII) introduction 1—37



Yüklə 18,33 Mb.
səhifə294/489
tarix03.01.2022
ölçüsü18,33 Mb.
#50422
1   ...   290   291   292   293   294   295   296   297   ...   489
Downstream pile:






























































































d = 255 – 248 = 7.0 m and b = 36.5 m















α =




36.5






































































7.0 = 5.21




















































Using Eqs. (9.55), (9.51) and (9.52),

















































λ =




1 L







1 + α

2




O

1 L
















2

O













2




M1 +










P =







M1 + 1 + (5.21)




P = 3.15



















N

1 F λ −










Q

2 N

−1F




1.15 I




Q
















1













2 I

1





















φE =



















cos




G













J =







cos

G










J = 0.3810 = 38.10%
















π




λ










π











































H










K




H




3.15K






















1













1 F λ −

1 I

1







−1F

2.15I















φD =
















cos




G










J =










cos

G







J = 0.2609 = 26.09%













π







λ










π











































H







K




H




3.15K













Using Fig. 9.23 with




1

=

d




=




7.0




= 0.192,


































b

36.5





































α
































































φE = 38%
































































and

φD = 26%
































































Using the values of φD and φE obtained from Eqs. (9.51) and (9.52),







Thickness correction for φ

=




38.1 26.09 × 12. = 2.06% (–)


































E
















7








































Correction for interference of intermediate pile (for φE)


































= 19







(253.8 − 248)

× (5.8 + 5.8)





























































15
















36.5





































= 3.75% (–)














































φE (corrected) = 38.1 – 2.06 – 3.75 = 32.29%
Based on the above calculations, subsoil hydraulic gradient line has been plotted in Fig.
9.26
Exit Gradient:


α =

36.5

= 5.21 ; H = 260 – 255 = 5.0 m




7.0




λ =

1 +

1 + α2

= 3.15













2



































Yüklə 18,33 Mb.

Dostları ilə paylaş:
1   ...   290   291   292   293   294   295   296   297   ...   489




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin