360 IRRIGATION AND WATER RESOURCES ENGINEERING
The length of cistern required to be roughened is equal to (1)
c h33 /2 HL1/ 2
D
where, D is the depth of water in the cistern, h3 the depth of flow in the downstream channel, HL the drop height and c is a coefficient whose value depends on the type of impact as follows:
Vertical impact, c = 1 Horizontal impact, c = 3 Inclined impact with baffle, c = 4
Inclined impact without baffle, c = 6 No impact, c = 8 to 10
Where hydraulic impact occurs, the roughening should start downstream of the jump at a distance about half the height of the hydraulic jump. Downstream of the roughened length, a smooth cistern (without roughening devices) about half as long as the roughened cistern should be provided (1).