-
This certificate is based on the audited/unaudited statement of expenditure.
-
This item of stock have been in the assets ledger/register of the Institution.
C.S. Aulakh CAS Coordinator & Chairman
CAS in PHYSICS (2011-12)
Statement of expenditure for the year 2011-12 for the period 1.4.2011 to February, .2012 in respect of UGC/CAS programme in Physics, Panjab University, Chandigarh.
Sr.
No.
|
ITEMS
| Sanctioned grant |
Released grant
|
Total expenditure
|
Unspent balance
|
|
NON-RECURRING
|
|
|
Upto Feb.,12
|
|
I
1.
|
(Equipment)
High speed computing system for high energy, low energy and condensed matter group
|
12.00
|
12.00
|
1,97,152.00
|
2,74,670.00
|
2.
|
Software for the above groups including MD software
|
8.00
|
8.00
|
4,15,748.00
|
6,48,501.00
|
3.
|
Monochromater (CMP Expt. Group)
|
6.00
|
6.00
|
Tender document ready
|
6,00,000.00
|
4.
|
Sputter Unit (N.P. Group)
|
5.00
|
5.00
|
2,55,816.00
|
5,00,000.00
|
5.
|
Low energy HPGe Detector
|
8.50
|
8.50
|
NIL
|
NIL
|
6.
|
CV measurement (High Energy Expert. Group) Probe Station
|
8.00
|
8.00
|
Tender document ready
|
8,00,000.00
|
7.
|
Upgradation of M.Sc. Lab
|
3.00
|
3.00
|
Under process
|
2,86,987.00
|
8.
|
Upgradation of Spectrometery and Geochoronology Lab.
|
4.50
|
4.50
|
2,27,855.00
|
2,30,023.00
|
9.
|
Maintenance of Cyclotron, X-ray Fluorescence and experimental solid state Lab equipments.
|
5.00
|
5.00
|
1,41,541.00
|
2,97,581.00
|
II
|
Building (Upgradation) Augmentation & extension etc.
|
10.00
|
Not yet released
|
Applied for the funds
|
Not yet released
|
|
Total
|
70.00
|
60.00
|
12,38,112.00
|
36,37,762.00
|
|
RECURRING
|
|
|
|
|
Sr.No.
|
Item Approved
|
Amount Approved
in Lakhs
(per year)
|
1.
|
Contingency/Workingexpenses/ Consumables Rs.7.50 Lacs for 5 years
|
1.50
|
1,50,000.00
|
19,246.00
|
1,30,754.00
|
2.
|
Chemical/consumable/Glass Rs.5.00 Lacs for 5 years.
|
1.00
|
1,00,000.00
|
9,989.00
|
90,011.00
|
3.
|
Travel/Field Facilities/Field trips for Faculty members only (all within India only) Rs.2.50 Lacs for 5 years.
|
0.50
|
50,000.00
|
18,043.00
|
31,957.00
|
4.
|
Visiting Fellows Rs.2.50 Lacs for 5 years.
|
0.50
|
50,000.00
|
Under process
|
50,000.00
|
5.
|
Seminars/Symposia/Workshop on thrust area Rs.3.00 Lacs for 5 years.
|
0.60
|
60,000.00
|
Under process
|
60,000.00
|
6.
|
Hiring the services of Technical/Industrial/ Secretarial assistance as relevant to the programme (for programme duration only) Rs.2.00 Lacs for 5 years.
|
0.40
|
40,000.00
|
20,200.00
|
19,800..00
|
7.
|
Advisory Committee Meeting (TA/DA for UGc nominees in the Committee Rs.2.50 Lacs for 5 years.
|
0.50
|
50,000.00
|
50,000.00
|
NIL
|
8.
|
Books and Journals Rs.2.50 Lacs for 5 years.
|
0.50
|
50,000.00
|
Spent by the Main Library
|
50,000.00
|
|
Total for 5 years (Rs.27,50,000/-)
|
5.50
|
5,50,000.00
|
1,17,478.00
|
4,32,522.00
| -
Certified that the grant has been utilized for the purpose for which it was sanctioned and in accordance with the terms and conditions attached to the grant.
-
If as a result of check or audit objection, if any, irregularity is noticed will be taken to refund adjust or regularize the amount.
(C.S. Aulakh) CAS Coordinator & Chairman,
9. ADDITIONAL FUNDING REQUIRED
During the last CAS-Advisory committee meeting certain additional funds were recommended for the CAS-Program. However no funds were released since then. In view of the continuing requirements as well as additional requirements that have arisen the following list of funding is placed before the committee for discussion.
Items recommended by the Committee in last Meeting
(present estimates given )
|
HPCC Facility
|
Rs. 15 Lac
|
Sputter Unit
|
Rs. 3 Lac
|
HPGe detector electronics module
|
Rs. 3 Lac
|
Monochromator Accessories and nano-voltmeter
|
Rs. 6 Lac
|
High Energy Theory Group
Computer/Laptops
|
Rs. 3 Lac
|
Mass spectrometer accessories and maintenance
|
Rs. 6 Lac
|
Teaching Labs
|
Rs 5 lacs
|
Travel (International & Domestic travel)
|
Rs 5 lacs.
|
Extension of Building
|
Rs. 50 Lac
|
New Requirements
|
Microniser Machine (XRF)
|
Rs. 5 Lacs
|
Condensed matter Physics lab (Electric wiring and upgradation of Power supply)
|
Rs. 6 Lacs
|
Optical-fibre coupled microscope for existing Raman Spectrograph
|
Rs. 30 lacs
|
Microfocus XRF laboratory (lab. Renovation and UPS)
|
Rs. 3 Lacs
|
Contribution towards new building
|
Rs 50 Lacs.
|
Total
|
Rs. 190 lacs
|
Justification of Building funds:
The roof of the Department has undergone severe wear and tear and needs urgent renovation.The space requirements have increased greatly because of the expansion of the Department in terms of number of courses, number of undergraduate and post graduate students and Research students in various research fields. The University has begun the process of approving plans for the new construction. However funding needs to be arranged from several sources in view of resource crunch. Therefore the UGC-CAS may consider making aid for this purpose to act as seed money for the new building.
Sanctioned strength
|
|
M.Sc I
|
138
|
M.Sc II
|
138
|
B.Sc I
|
69
|
B.Sc II
|
69
|
B.Sc III
|
69
|
B.Sc Subsidiary
|
Chemistry Geology Maths
|
80 B.Sc I
80 B.Sc II
|
BioMedical Sciences
|
80
|
240 x 1/6 = 40
|
M.Phil
|
15
|
Ph.D. students
|
120
|
Nano Science
|
15
|
All theory Papers held in the department
|
Medical Physics and Nuclear Medicine
|
20
|
Sanctioned total Students strength
|
483+40+14+30+15+10 = 592
|
SPACE REQUIREMENTS :
Class rooms
|
M.Sc I
|
1 section
|
3 bay class room
|
M.Sc II
|
1 section
|
3 bay class room
|
B.Sc I
|
3 bay class room
|
B.Sc II
|
3 bay class room
|
B.Sc III
|
3 bay class room
|
M.Phil/Pre Ph.D.
|
2 bay class room
|
Total
|
17 bays
|
Teaching Laboratory
|
M.Sc I
|
6 bays Physics
|
M.Sc II
|
6 bays Physics + 3 bays Electronics
|
B.Sc I
|
6 bays Physics
4 bays Electronics (I,II,III)
|
B.Sc II
|
B.Sc III
|
6 bays Physics
|
M.Phil Lab./ Advanced instrumentation lab.
|
3 bays
|
Computer teaching laboratories
|
6 bays
|
Total
|
40 bays
|
Teachers Rooms and Research Labs.
Office space for Faculty
|
10 bays
|
Lab. Space for theory and Expt. Including Ph. D. students sitting space) 20 bays
|
Total
|
10 office bays + 20 Lab. Bays = 30 bays
|
Teaching Class rooms
|
17 bays
|
Teaching Labs
|
40 Bays
|
Faculty Office + Research Lab
|
30 Bays
|
Total
|
87 Bays
|
Summary - Total Building space requirements after the adjustments in the present existing space (spread over several floors) about 75 bays x 200 sq. Ft. = 15000 Sq. Ft.
Dostları ilə paylaş: |