SECTION 00 01 15 LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of

the contract.

Drawing No. Title
E-001 OVERALL SITE PLAN

ES101 ELECTRICAL SITE PLAN – WEST

ES102 ELECTRICAL SITE PLAN – EAST

E-401 ENLARGED MAIN 15KV GEAR PLAN

E-501 ELECTRICAL DETAILS

E-601 PARTIAL ELECTRICAL SITE RISER DIAGRAM - EXISTING

E-602 PARTIAL ELECTRICAL SITE RISER DIAGRAM – PHASE 1

E-603 PARTIAL ELECTRICAL SITE RISER DIAGRAM – PHASE 2

E-604 PARTIAL ELECTRICAL SITE RISER DIAGRAM – PHASE 3

- - - END - - -

THIS PAGE LEFT INTENTIONALLY BLANK


SECTION 01 00 00 GENERAL REQUIREMENTS



TABLE OF CONTENTS

    1. GENERAL INTENTION 1

    2. STATEMENT OF BID ITEM(S) 1

    3. SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR 1

    4. CONSTRUCTION SECURITY REQUIREMENTS 1

    5. FIRE SAFETY 1

    6. OPERATIONS AND STORAGE AREAS 1

    7. ALTERATIONS 1

    8. INFECTION PREVENTION MEASURES 1

    9. DISPOSAL AND RETENTION 1

    10. PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS 1

    1. RESTORATION 1

    2. PHYSICAL DATA 1

    3. LAYOUT OF WORK 1

    4. AS-BUILT DRAWINGS 1

    5. USE OF ROADWAYS 1

    6. TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT 1

    7. TEMPORARY USE OF EXISTING ELEVATORS 1

    8. TEMPORARY TOILETS 1

    9. TESTS 1

    10. INSTRUCTIONS 1

    11. HISTORIC PRESERVATION 1

i


SECTION 01 00 00 GENERAL REQUIREMENTS





    1. GENERAL INTENTION




      1. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the Primary Voltage Upgrade, Phase 1 project (VA#: 568-13-107) as required by drawings and specifications.

      2. Visits to the site by Bidders may be made only by appointment with the Medical Center Engineering Officer.

      3. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

      4. Prior to commencing work, general contractor shall provide proof that a OSHA certified “competent person” (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are present.

      5. Training:

        1. All employees of general contractor or subcontractors shall have the 10-hour OSHA certified Construction Safety course and/or other relevant competency training, as determined by VA CP with input from the ICRA team.

        2. Submit training records of all such employees for approval before the start of work.
    1. STATEMENT OF BID ITEM(S)





      1. GENERAL CONSTRUCTION: the Contractor shall provide all labor, materials, tools and equipment, and necessary supervision to perform all work associated with this project as indicated on the contract documents.

      2. ITEM I. BASE BID: All work associated with VA Project Number 568-13- 107, Primary Voltage Upgrade, Phase 1 as indicated on the contract documents.

      3. DEDUCT ALTERNATE #1: All work in BASE BID minus all work associated with TR-137.

      4. Contractor shall reference project plans/drawings for all items that are

associated with each Deduct Alternate.


    1. SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR





      1. AFTER AWARD OF CONTRACT, the Contractor will be furnished electronic files of contract documents in .pdf format. The Contractor may produce as many sets of hard copy plans and specifications as needed, at Contractor’s expense.
    1. CONSTRUCTION SECURITY REQUIREMENTS





      1. Security Plan:

        1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

        2. The General Contractor is responsible for assuring that all sub- contractors working on the project and their employees also comply with these regulations.

      2. Security Procedures:

        1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

        2. For working outside the “regular hours” as defined in the contract, The General Contractor shall give 3 days notice to the Contracting Officer so that arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

        3. No photography of VA premises is allowed without written permission of the Contracting Officer.

        4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

      3. Key Control:

        1. The General Contractor shall provide duplicate keys and lock combinations to the Resident Engineer for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

        2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation.

    1. Yüklə 6,29 Mb.

      Dostları ilə paylaş:
1   2   3   4   5   6   7   8   9   ...   39




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin