1. Power Plant Seminar (Thermal)
2. Team Building & problem solving techniques
3. Workshop on Inca term 2010
4. Power Plant Summit 2011
5. Lifting Machineries and Tackles
6. Condition Monitor of Transformers by Furaning Analysis
7. Control Valves & Accessories
8. Safety Procedure Rules & Practices
9. Energy Symposium & Vendors "Conclave –2011
10. Accident Reporting and Investigation in construction Industry
11. VSS Technology for HVDC & facts
12. National conclave on Balance of Plants – issues -& Challenges
13. International conference on Super Critical Technology
14. Training Programme on Development of Green Belt
15. Advanced Enterprise Security
16. Coal Quantity Assessment and its impaction power plant performance
17. ERGONOMICS-A Tool for ensuing safety & Health at work Place
18. Effective Vigilance - Higher Productivity
19. Pre-Fabricated Concrete Structure
20. Simulator Training at NTPC
21. Best Practices in O&M of Coal Mills
22. Errors and Approximation in Air Pollution Monitoring Analysis
23. Environmental Issues, Challenges & solution for Thermal Power Plant
24. Steam Turbine Auxiliaries, O&M, Governing System, Trouble
25. Shooting Erection & Commissioning Training for Internal Auditors -EE & General Staff Power EMS - 150 = 1400
26. Insulating oils for Transformer
27. Spares, Services & R&M of Hydro Plant
28. Battery Maintenance
29. Generator Protection
30. Condition Monitory of Transformers through liquid insulating
31. Best Practices in O&M of Hydro Power Station
32. O&M of Sub-station Equipment
-
National Training Centre – Solar
-
KPCL has implemented four Solar Photo Voltaic power plants in Karnataka viz., in Kolar, Belgaum, & Raichur district - 3MW each and in Mandya District- a 5MW plant totaling 14 MWs which are first of its kind in the country.
-
In recognition of KPCL’s initiative to set up solar plants, MNRE, New Delhi has appreciated the same and sanctioned National Training Centre to KPCL. MNRE has also released `1,00,00,000 as initial fund for the training programme.
-
Smt. Shammim Banu, IAS, Addl. Chief Secretary (Energy), GoK and Dr Bhargava, Director-MNRE, inaugurated the first training, programme on 19.09.2011.
-
The objective of the training programme is to impart knowledge to the entrepreneurs regarding setting up of solar PV plants in the country and give an insight regarding the various technologies of solar power, installation and commissioning procedures, design, construction and O&M issues.
-
Five batches of training programme were conducted as on date wherein 200 participants were benefited.
-
For the sixth batch of training programme 35 participants have registered, including officers from BHEL and Kerala Electricty Board.
-
The training programme consists of four days of class room training and two days of site visit to local manufacturing factory and visit to 3MW solar plant at Kolar.
ii) Career Growth
On implementation of career growth scheme, employees were upgraded/re-designated as under during the year:
To the level of EEs & Eqv.
|
23
|
To the level of AEEs & Eqv.
|
41
|
To the level of AEs & Eqv.
|
01
|
To the level of AAOs & OMs
|
07
|
Workmen levels
|
-
|
iii) Deputation to foreign countries
Shri C Basavaraj Ellatti, Exe. Engineer was deputed to attend a study cum familiarization programme “Thermal Power plant optimization of component under hygiene programme” at Europe/ Germany from 09.10.2011 to 22.10.2011.
iv) Deputation of employees to other organisations
The services of the employees of the Corporation are sought by GoK and other organisations. During the year, services of 20 Engineers and 5 non-engineering officers were spared on deputation basis.
XV Employees Strength
Particulars of employees
|
As on 31.03.2012
|
As on 31.03.2011
|
Total strength **
|
6041
|
6454
|
Corporate
|
2382
|
2507
|
Workmen
|
3642
|
3745
|
Deployment on Construction & Erection
|
623
|
549
|
Deployment on O & M
|
2694
|
3215
|
Deployment on auxiliary service
|
2707
|
2488
|
Entry of employees
|
63
|
366
|
Exit of employees *
|
306
|
201
|
Exit of employees under VRS
|
Nil
|
Nil
|
SC employees – in percentage
|
15.56%
|
15.35%
|
ST employees – in percentage
|
3.38%
|
3.26%
|
Handicapped employees in percentage
|
0.64%
|
0.63%
|
Ex-servicemen
|
0.46%
|
0.43%
|
Man/MW ratio
|
1.008
|
1.077
|
* Employees VR/resignation/expired taken from 01.04.11 to 31.03.12
** Including 17 employees of erstwhile VVNL on 31.03.2012
Dostları ilə paylaş: |