Draft report ran wg4



Yüklə 1,45 Mb.
səhifə1/78
tarix07.01.2022
ölçüsü1,45 Mb.
#77802
  1   2   3   4   5   6   7   8   9   ...   78

3GPP TSG RAN WG4 (Radio) Meeting #26 R4-030002

Madrid, Spain, 17 - 22 February, 2003



Title: Approved Report of the 25th 3GPP TSG RAN WG4 meeting
(Secaucus, NJ, US 11th -15th November, 2002)


Source: 3GPP support team

All the meeting documents can be found at:



ftp://ftp.3gpp.org/tsg_ran/WG4_Radio/TSGR4_25/

César Gutiérrez Miguélez

ETSI Mobile Competence Center

cesar.gutierrez@etsi.org


Contents





Contents 2

1 Opening of the meeting 4

2 Approval of the agenda 4

3 Approval of meeting report 4

4 Letters / reports from other groups 4

5 Maintenance of Release 99, Release 4 and Release 5 specifications 9

5.1 25.941 - Document Structure 9

5.2 25.101 - UE Radio transmission and reception (FDD) 9

5.2.1 FDD UE HSDPA 10

5.2.1.1 QPSK only UEs 12

5.2.1.2 VRC Simulation Results 12

5.2.1.3 CQI definition and test methodology for VRC 12

5.3 25.102 - UE Radio transmission and reception (TDD) 13

5.3.1 TDD HSDPA 13

5.3.1.1 Fixed Reference Channel 13

5.3.1.2 Variable channel 14

5.4 25.104 - BTS Radio transmission and reception (FDD) 15

5.4.1 BS IPDL attenuation requirement 16

5.5 25.105 - BTS Radio transmission and reception (TDD) 17

5.6 25.123 - Support of RF parameters in Radio Resource Management (TDD) 18

5.7 25.133 - Support of RF parameters in Radio Resource Management (FDD) 19

5.7.1 IPDL issues concerning the UE 21

5.7.2 Cell Identification 22

5.7.3 Layer 3 filtering 23

5.8 25.141 - Base Station conformance testing (FDD) 24

5.9 25.142 - Base Station conformance testing (TDD) 26

5.10 25.113 - Base station EMC 27

5.11 34.124 - EMC requirements for mobile terminals and ancillary equipment 27

5.12 34.926 - Table of International requirements for Mobile terminals and ancillary equipment 28

5.13 25.942 - RF System scenarios 28

5.14 25.106 – Repeaters - Radio transmission and reception 28

5.15 25.143 – Repeaters conformance testing 29

5.16 25.956 – Repeaters technical report 30

5.17 25.943 – Deployment aspects 31

6 Release 6 Work Items 31

6.1 Improvement of Receiver Performance Requirements for FDD UE 31

6.2 FDD Base Station Classification 31

6.3 Work Items under other WG responsibility 34

7 Release 6 Study Items 35

7.1 Wide Band distribution Systems 35

7.2 FS for the deployment of UTRA in additional and diverse spectrum arrangement 35

8 Liaison and output to other groups 35

9 Revision of the Work Plan 36

10 Future meetings 36

11 Any other business 36

13 Close of Meeting 37

14 Email approval 37

14.1 Conclusion of the email approval 37



Annex A: List of participants 38

Annex B: List of documents 41

Annex C: List of agreed CRs 52




Yüklə 1,45 Mb.

Dostları ilə paylaş:
  1   2   3   4   5   6   7   8   9   ...   78




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin