1GENERAL PART
Investor:
The Capital City of Warsaw is represented by Zarząd Transportu Miejskiego [Municipal Transport Authority] in Warsaw, on behalf of and for the benefit of which acts the company Metro Warszawskie Sp. z o. o. in Warsaw; ul. Wilczy Dół 5
Investment:
DESIGN AND CONSTRUCTION OF THE METRO WARSAW LINE II FROM THE STATION "RONDO DASZYŃSKIEGO" TO THE STATION "DWORZEC WILEŃSKI" IN WARSAW
Project No.: C784
Stage: Building Permit Design
Subject of the study:
Building investment no. 5 – C11 “Świętokrzyska” Station, Świętokrzyska Street / Marszałkowska Street – PKiN area – Warsaw and within the chainage scope 120+50–125 with railway installations and systems
within the investment consisting in the construction of Metro II Line from “Rondo Daszyńskiego” station (beginning of chainage L101+17.177; P101+16.086) to “Dworzec Wileński” station (end of chainage: L164+13.600; P164+36.807) in Warsaw.
1.1Scope of the investment
Subject matter of submittal is the BUILDING PERMIT DESIGN:
Building investment no. 5 – C11 “Świętokrzyska” Station, Świętokrzyska Street / Marszałkowska Street – PKiN area – Warsaw and within the chainage scope 120+50–125 with railway installations and systems
within the investment consisting in the construction of Metro II Line from “Rondo Daszyńskiego” station (beginning of chainage L101+17.177; P101+16.086) to “Dworzec Wileński” station (end of chainage: L164+13.600; P164+36.807) in Warsaw.
Discipline–specific designs are included in the volumes of this submittal.
1.2Essential documents -
The subcontractor contract for design services between between Astaldi-Gulermak-PBDiM and ILF Consulting Engineers Polska Sp. z o.o. for the project of the “Design and construction of the undergroundd line II from “Rondo Daszyńskiego” station to the “Dworzec Wileński” station” dated 28.10.2009r.
-
Decision no. 88 /WOL/ŚRÓ/PRN/ 08 of 20.03 2008, with appendices, on defining Location of Public Project Investment issued by the President of the Capital City of Warsaw. Reference number: AM-PU/7331/256/06/US.
-
Decision no. 8 /WOL/ŚRÓ/C2/10 of 5.03.2010 with appedices on defining Location of Public Project Investment (significance on district and local level - C2) issued by the President of the Capital City of Warsaw. Reference number: AM-WRU-BKU-7331-259-50-09.
-
Local Development Plan for the area of the Palace of Culture and Science in Warsaw, accepted by the resolution No. LXXVII/2095/2006 of the Council of the Capital City of Warsaw of 09 March 2006.
-
Decision no. 1329/OŚ/2007 on environmental preconditioning of consent to investment implementation dated 03.09.2007 issued by the President of the Capital City of Warsaw. Reference number: OŚ-II-WE-DŚ-BG/7624/543/13336/06/07.
-
Decision no. 269/OŚ/2007 clarifying provisions of the decision no. 1329/OŚ/2007 in points 3.4, 3.5, 3.6, 3.7. issued by the President of the Capital City of Warsaw. Reference number: OŚ-II-WE-DŚ-BG/7624/543/17197/06/07 dated 04.12.2007.
-
Decision no. 7/OŚ/2010 dated 12.01.2010 concerning the possibility of conducting works by night and on non-working days issued by the President of the Capital City of Warsaw.. Reference number: OŚ-IV-BGR-76242-543-5-06.
-
The map for design purposes at a scale of 1:500, prepared by WPG, confirmed compliance of the map with the design basis map, registered by the Geodetic and Mapping Documentation Centre.
-
The map for design purposes at a scale of 1:250 for the design basis showing the compliance of the map with the design basis map at a scale of 1:500 by the Geodetic and Mapping.
-
Investor’s declaration on the right to dispose of plot for building purposes, Warsaw.
-
ZUDP opinion no 4057/2010 of 06.10.2010r
-
MCD - Multidisciplinary Concept Design prepared by the Consortium – Design Office Metroprojekt sp. z o.o. in Warsaw and AMC Andrzej M. Chołdzyński Sp. z o.o. in Warsaw, MN-L21-10-4670/II/01, Warsaw, September 2008.
-
Functional Application Programme (FAP). Collective study co-ordinated by prof. dr hab. Eng Andrzej Chudzikiewicz . Warsaw, September 2008.
-
Specification of significant terms and conditions of procurement (SIWZ) in an open tender for awarding a procurement No. EH/500/45/E/08 dated 05.11.2008.
-
Site inspection
-
Interdisciplinary approvals.
-
Technological and railway guidelines
-
Organization and technical approvals between Cadastre and Geodesy Department of the Capital City of Warsaw (Biuro Geodezji i Katastru Urzędu m. st. Warszawy) and Metro Warszawskie Sp. z o.o. during designing and realization of the central section of II metro line dated 6.04.2009.
-
Geological-engineering and hydro-geological documentation for Warsaw metro line II, station “Rondo Daszyńskiego”, elaborated by Geoteko Projekty Konsultacje Geotechniczne Sp. z o.o. in June 2003, under the guidance of prof. Wojciech Wolski.
-
Summary geological-engineering documentation for the central metro line II section, encompassing the chage the route of the II line of the Metro at the section from ‘Nowy Świat’ station ‘Dworzec Wileński’ station, elaborated by the consortuim of Geoteko Sp. z o.o. – SGGW – Geoprojekt Sp. z o.o., in February 2007 under the supervision of prof. Wojciech Wolski.
-
Geotechnical documentation for the Underground Line II from “Rondo Daszyńskiego Station” to “Dworzec Wileński Station” in Warsaw elaborated by the Geoteko Geotechnical Consultants Ltd. in June 2010 under the guidance of prof. dr hab. inż. Wojciech Wolski.
-
Addendum to geological-engineering documentation specifying the conditions of foundation of the central section of (City-center) of Warsaw metro line II at the section form ‘Rondo daszyńskiego’ station to ‘Dworzec Wileński’ station, elaborated by Geoteko, August 2010, Warsaw.
-
Approvals with the Investor.
-
Guidelines and approvals in the scope of fire safety, Health&Safety, sanitary and accoustic issues.
Comment: remaining documents being the basis of this study as per legal documents set and disciplinary studies.