12.4WP 2000: Development and validation

12.4.1WP 2100: Multitemporal MAI development


PROJECT: CHARMING PHASE:

WP: 2100

WP Title: Multitemporal MAI development

Company: INGV

WP Manager: J.P. Merryman Boncori

Start Event: PM1 Planned Start Date: KO+3

End Event: MTR Planned Finish Date: KO+9


Sheet 1 of 1

Issue Ref: 1

Issue Date: 05/11/2013


Inputs:

Tasks:

Outputs:

  • Input to Algorithm Theoretical Basis Document (ATBD)

  • Input to Product Validation Report (VR)





12.4.2WP 2200: Multitemporal DInSAR enhancements


PROJECT: CHARMING PHASE:

WP: 2200

WP Title: Multitemporal DInSAR enhancements

Company: IREA

WP Manager: G. Fornaro

Start Event: PM1 Planned Start Date: KO+3

End Event: MTR Planned Finish Date: KO+9


Sheet 1 of 1

Issue Ref: 1

Issue Date: 05/11/2013


Inputs:

  • Requirement Baseline (RB)

  • Development and validation dataset

Tasks:

  • Develop the intermittent SBAS algorithm for spatial densification of DInSAR measurements

  • Testing and comparison with classical SBAS

  • Validate against GPS measurements on development dataset

  • Document algorithm in ATBD

  • Document validation in VR

Outputs:

  • Input to Algorithm Theoretical Basis Document (ATBD)

  • Input to Product Validation Report (VR)





12.4.3WP 2300: SAR and GPS integration


PROJECT: CHARMING PHASE:

WP: 2300

WP Title: SAR and GPS integration

Company: INGV

WP Manager: R. Devoti

Start Event: PM1 Planned Start Date: KO+3

End Event: MTR Planned Finish Date: KO+9


Sheet 1 of 1

Issue Ref: 1

Issue Date: 05/11/2013


Inputs:

  • Requirement Baseline (RB)

  • Development and validation dataset

Tasks:

  • Develop an algorithm to integrate GPS and InSAR time-series

  • Develop an algorithm to generate strain maps from integrated GPS and InSAR deformation measurements

  • Document algorithms in ATBD

  • Document validation in VR

Outputs:

  • Input to Algorithm Theoretical Basis Document (ATBD)

  • Input to Product Validation Report (VR)





12.4.4WP 2400: Integration of deformation measurements for hazard modelling


PROJECT: CHARMING PHASE:

WP: 2400

WP Title:

Integration of deformation mesurements for hazard modelling

Company: INGV

WP Manager: Carlo Meletti

Start Event: PM1 Planned Start Date: KO+3

End Event: MTR Planned Finish Date: KO+9




Sheet 1 of 1

Issue Ref: 1

Issue Date: 05/11/2013


Inputs:

  • Requirement Baseline (RB)

  • Development and validation dataset

Tasks:

  • Using GPS and InSAR velocities to obtain a consistent in long-term deformation model;

  • Converting deformation-model strain rates in earthquake rates;

  • Evaluating seismic hazard in test sites

  • Development of a validation method for testing the seismic hazard obtained through GPS and InSAR respect to the "classical" seismic hazard maps

  • Document algorithms in ATBD

  • Document validation in VR

Outputs:

  • Input to Algorithm Theoretical Basis Document (ATBD)

  • Input to Product Validation Report (VR)





12.5WP 3000: Prototype demonstration and impact assessment

12.5.1WP 3100: Deformation time-series production


PROJECT: CHARMING PHASE:

WP: 3100

WP Title: Deformation time-series production

Company: INGV

WP Manager: R. Devoti

Start Event: MTR Planned Start Date: KO+9

End Event: PM5 Planned Finish Date: KO+15


Sheet 1 of 1

Issue Ref: 1

Issue Date: 05/11/2013


Inputs:

  • Algorithm Theoretical Basis Document (ATBD)

  • Experimental dataset

Tasks:

  • Process the experimental dataset with the integrated GPS-SAR method developed in WP2000

Outputs:





12.5.2WP 3200: Hazard model production


PROJECT: CHARMING PHASE:

WP: 3200

WP Title: Hazard model production

Company: INGV

WP Manager: Vera D’Amico

Start Event: MTR Planned Start Date: KO+9

End Event: PM5 Planned Finish Date: KO+15


Sheet 1 of 1

Issue Ref: 1

Issue Date: 05/11/2013


Inputs:

  • Earthquake rates obtained through deformation model;

Tasks:

  • Covert Earthquake rates in expected ground shaking;

  • Define a complete seismic hazard evaluation of the investigate area through the assessment of PGA, calculated for several probabilities of exceedance in 50 years, and spectral accelerations for varied spectral periods and exceedance probabilities

  • Outputs:

  • Impact Assessment Report (IAR)






Yüklə 0,77 Mb.

Dostları ilə paylaş:
1   ...   9   10   11   12   13   14   15   16   ...   26




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin