Environmental and Social Management Framework (esmf)



Yüklə 13,37 Mb.
səhifə97/120
tarix17.02.2022
ölçüsü13,37 Mb.
#114396
1   ...   93   94   95   96   97   98   99   100   ...   120
III. Other Substantial Risk subprojects (types of activities from the list of the National category III of the environmental impact) - ESIA\ESMP is mandatory:

  1. Service stations, car parks;

  2. Cattle-breeding complexes;

  3. Granaries;

  4. Small workshops for wine making and production of fermented beverages,

  5. Small workshops for the production of clay products and building materials;

  6. Small shops for processing leather;

  7. Small hydroelectric power stations (with a capacity of less than 30 mw);

  8. Meat industry (slaughterhouses and processing);

  9. Wool processing enterprises;

  10. Public catering enterprises with more than 50 seats;

  11. Poultry farms;

  12. Reconstruction and reclamation of irrigated lands on the area from 100 to 1000 hectares;

  13. Repair of engines and machines, as well as their coloring;

  14. Repair of rubber products with restoration of tires;

  15. Fisheries, including fish processing;

  16. Markets with more than 50 seats;

  17. Assembly and repair of electrical equipment;

  18. Greenhouses with boiler rooms;

  19. Factories for the manufacture of confectionery;

  20. Refrigeration plants with a capacity of more than 50 tons


Yüklə 13,37 Mb.

Dostları ilə paylaş:
1   ...   93   94   95   96   97   98   99   100   ...   120




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2025
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin