Reserve for new entrants (except for cogeneration)
The methodology of the EC allows the formation of a reserve for new entrants in the Scheme.
New entrant is each installation corresponding to the definition in section 5.2.1. above.
The rules for allocation allowances differ for each type of new entrant.
In this section are described new entrants – installations newly constructed in the period 2004 – 2012, whose start is:
а) planned or known, or
б) unknown yet,
but in both cases is part of the macroeconomic forecasting.
This reserve is formed within the projected quantity of allowances for the respective group of installations or sector.
Dostları ilə paylaş: |