B.3.Project boundary
The project uses wind energy to produce electricity. Kinetic power of the wind is converted to electrical energy, which then will be transferred to the grid. Back-up power generators in the wind farm will only be used when the wind farm is out of service and power cannot be supplied from grid. Hence, emissions due to usage of back-up power generation are expected to be very low and are taken to be zero complying with the “Tool to calculate project or leakage CO2 emissions from fossil fuel combustion” (v.2).