11.2SA Power Networks' revised proposal and submissions


SA Power Networks proposed $140.0 million ($2014–15) in step changes in its revised proposal. SA Power Networks' revised step changes contribute 9.8 per cent to its total opex forecast. It did not specify why it did not repropose many step changes it proposed in its initial proposal. SA Power Networks' revised proposal on step changes is set out below in Table C. to Table C..

We received several submissions supporting our preliminary position on most step changes. These included submissions from:

Business SA149

Consumer Challenge Panel150

Energy Consumers Coalition of South Australia (ECCSA)151

Energy Retailers Association of Australia (ERAA)152

Origin Energy153

South Australian Council of Social Services (SACOSS).154

Business SA agreed there are few changes to the operating environment facing SA Power Networks during 2015–20 with respect to regulatory obligations. It submitted that while customers may express a preference for certain services, it does not necessarily mean that an increase in total forecast expenditure is required.155

The Consumer Challenge Panel (CCP) agreed that most step changes SA Power Networks proposed were already captured by base opex or output growth.156 It also considered there should be a negative step change for vegetation management.157



Table C. Legal and regulatory step changes ($ million, 2014–15)

Proposal

SA Power Networks initial proposal

AER preliminary decision

SA Power Networks revised proposal

AER final decision

Asset inspections - no access poles

23.4

-

21.9

-

Asset inspections - underground cables

3.1

-

-

-

Asset inspections - bushfire inspection frequency

15.6

-

12.9

-

WH&S - Asset inspections 2 person crews

2.8

-

2.8

-

WH&S - Network operations

4.0

-

-

-

WH&S - Fleet monitoring

2.2

-

2.2

-

WH&S - Fleet inspections

3.9

-

3.9

-

New RIN requirements

9.2

-

6.4

6.4

National Energy Retail Law Regulations

4.3

-

-

-

National Energy Customer Framework

1.3

1.3

1.3

1.3

Demand Side Participation

33.8

-

13.3

5.1

Environmental Management

1.4

-

-

-

Total

105.0

1.3

64.8

12.7

Source: SA Power Networks, Reset RIN 2015–20; AER, Opex model for SA Power Networks - preliminary decision; SA Power Networks, Revised Reset RIN 2015–20; AER, Opex model for SA Power Networks ─ final decision.

Table C. Capital program impact step changes ($ million, 2014–15)

Proposal

SA Power Networks initial proposal

AER preliminary decision

SA Power Networks revised proposal

AER final decision

Information Technology

43.9

-

19.4

4.0

Mobile radio

7.9

7.9

12.8

12.8

Carrier costs, radio licensing and planning

5.1

-

-

-

Network Management Centre

3.6

-

-

-

Data quality

3.9

-

3.9

-

Substation maintenance - disconnectors

2.4

-

-

-

Flexible load management

1.0

-




-

Total

69.6

7.9

36.1

16.7

Source: SA Power Networks, Reset RIN 2015–20; AER, Opex model for SA Power Networks - preliminary decision; SA Power Networks, Revised Reset RIN 2015–20; AER, Opex model for SA Power Networks - final decision.

Table C. Customer driven initiatives and changing community expectations ($ million, 2014–15)

Proposal

SA Power Networks initial proposal

AER preliminary decision

SA Power Networks revised proposal

AER final decision

Change in NBFRA trimming cycle

13.5

-

13.5

-

Tree removal and replacement - BFRA

9.2

-

10.5

-

Tree removal and replacement - NBFRA

6.1

-

6.1

-

Advanced tree trimming practices

1.9

-

1.9

-

Community engagement and consultation - vegetation management

1.2

-

1.2

-

Customer education and consultation

1.7

-

1.7

-

Self-service products

1.0

-

1.0

-

Customer service team

1.6

-

1.6

-

Bushfire education campaign

2.6

-

2.6

-

Extreme weather education campaign

1.9

-

1.9

-

Farmers and sailors - education campaign

0.9

-

0.9

-

Total

41.6

-

42.8

-

Source: SA Power Networks, Reset RIN 2015–20; AER, Opex model for SA Power Networks - preliminary decision; SA Power Networks, Revised Reset RIN 2015–20; AER, Opex model for SA Power Networks ─ final decision.

Table C. Finance related operating expenditure ($ million, 2014–15)

Proposal

SA Power Networks initial proposal

AER preliminary decision

SA Power Networks revised proposal

AER final decision

Insurance premiums

3.0

-

-

-

Superannuation

–2.4

-

-

-

Total

0.6

-

-

-

Source: SA Power Networks, Reset RIN 2015–20; AER, Opex model for SA Power Networks - preliminary decision; SA Power Networks, Revised Reset RIN 2015–20; AER, Opex model for SA Power Networks ─ final decision.

Table C. Base year adjustments ($ million, 2014–15)



Proposal

SA Power Networks initial proposal

AER preliminary decision

SA Power Networks revised proposal

AER final decision

Regulatory proposal

–8.2

-

-

-

Distribution licence fee

–5.5

–5.0

–5.0158

–5.0

Non network solution

1.3

-

1.3159

-

Property

2.0

-

-

-

Total

–10.4

–5.0

–3.7

–5.0

Source: SA Power Networks, Reset RIN 2015–20; AER, Opex model for SA Power Networks - preliminary decision; SA Power Networks, Revised Reset RIN 2015–20; AER, Opex model for SA Power Networks ─ final decision.

Yüklə 0,56 Mb.

Dostları ilə paylaş:
1   ...   6   7   8   9   10   11   12   13   ...   21




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin