Stage of the project
(start-end dates)
|
Activities to be undertaken. Indicate also any foreseen major divergence from the original workplan
|
Lead partner, other partners to be involved in the activities undertaken
|
Foreseen products and results
|
Stage 2
(01/10/2006- 30/09/2007)
|
Application of the TUNING methodology to EIE, to identify competences:
Redaction of guidelines "Tuning in EIE", Integration of data feedback from questionnaires
|
|
Report on the TUNING methodology in EIE
-
A pilot study of each of the three questionnaires will be undertaken, the results analysed and the questionnaires will be optimised in light of the findings
-
A full survey of the questionnaires will be planned and carried out during this stage.
-
Analysis of the results will be undertaken and discussions will take place on how to interpret the results for the EIE area.
4. A draft set of guidelines specific to the EIE discipline will be produced based on the findings of the survey
|
|
Analysis of existing accreditation procedures, proposition of a methodology Analysis of the (some) procedures, general synthesis, proposition of a common guideline for EIE
|
|
- Circulation of the questionnaire to all the project partners
- Analysis of the results
- Draft Report on accreditation in EIE
|
|
Quality assessment of some resources in EIE available through internet
Implementation of the quality evaluation procedure on some resources
|
| -
Collecting and classifying data on available web-based educational resources
-
Defining and implementation of assessment criteria of the quality of the contents
|
|
Observatory on the degrees available in EIE in Europe, and state of the implementation of the Bologna-process
Update of the two monographs developed during the THEIERE TN,
Improved analysis of the content and organisation of international curricula
|
| -
New draft version of the monograph “ “TowardsThe harmonisation of electical and Information Engineering education in Europe”
-
Update of the monograph “ An overview of Doctoral studies in Europe”
|
Communication strategy
|
Design of a communication strategy and Continuous action: identification of pertinent targets, and communication tools
|
|
Dissemination of the flyer
Update of the website www.eie-surveyor.org
|
Monitoring
|
Monitoring of the project
Organisation of the work of external monitors
|
|
Report on the activity of the monitoring group and the external monitors
|
Conferences
|
|