MAYR MELNHOF AD town of Nikopol *left EU ETS in 2008
22,018
12,861
0
0
0
0
12,861
Total for the sector
239,279
151,758
221,460
190,856
190,858
198,992
953,924
Allocated allowances - total
39,550
38,300,672
40,290,115
34,721,607
34,721,925
34,310,919
182,345,238
Average annually permitted quantity for 2008-2012 г.
37,459,938
42,433,833
42,433,833
42,433,833
42,433,833
42,433,833
212,169,165
Remainder for reserve new entrants
1,694,145
7,263,282
7,262,964
7,673,969
23,894,360
Allowances for cancellation at the transfer of ERUs from JI projects with double counting – including direct, as well as indirect double counting
1,482,392
1,482,392
1,482,392
1,482,392
5,929,567
Coefficient of reduction
1.0193
0.8785
0.8785
0.9159
1 Regulation from 10.04.2009 laying down the methods of establishment of national indicative targets, the rules for allocation of this targets as individual targets for energy savings between persons according article 10, paragraph 1 of the Energy efficiency act, the admissible measures for energy efficiency, methods for evaluation and the means for confirming the energy savings, Regulation № RD-16-347 from 02.04.2009 laying down the provisions for determination of the amount and the payment of planned resources according contracts with guaranteed result, resulting in energy savings in buildings – national and/or municipal property, Regulation № RD -16-346 from 02.04.2009 laying down the indicators for energy consumption, energy characteristics of industrial systems, the provisions for accomplishment investigation of the energy efficiency in industrial systems, Regulation № RD -16-294 from 01.04.2008 for accomplishment investigation of the energy efficiency, Regulation № RD -16-295 from 01.04.2008 for certification of buildings for energy efficiency; Regulation № RD -16-296 from 01.04.2008 for energy characteristics on the sites, Regulation №16-1238 from 28.12.2007 for the circumstances subject to inscription in the register with persons, accomplishing certification of buildings and investigation of energy efficiency, and the provisions for receiving information from the register and the provisions for acquisition and acknowledging of the qualification. Regulation № RD – 16-301 from 20.03.2009 laying down the content, structure provisions for acquiring and submitting information.
2 Methodology for monitoring of Greenhouse Gas emissions by operators of installations, participating in the GHG emissions Trading Scheme
3 According Directive 2003/87/ EC definition: ”new entrant” means any installation carrying out one or more of the activities indicated in Annex I, which has obtained a greenhouse gas emissions permit or an update of its greenhouse gas emissions permit because of a change in the nature or functioning or an extension of the installation, subsequent to the notification to the Commission of the national allocation plan.
4 character of an installation is determine by the type and quantity of its equipment and machinery, fit together in such way, that enable to produce concrete product or to generate energy.
5 functioning of an installation is operation on particular technology in regime, which depends from availability or lack of restrictions, related with the national legislation or agreement with European Commission and enable to produce concrete product or to generate energy with certain quality and quantity.
6 On the grounds of Article 222, para.1 from Law of territory arrangement and Article 17, para. 1, item 1 from Regulation No2 for bring into operation of constructions in Republic of Bulgaria and minimum guarantee period for carried out construction and assembly works, equipments and construction sites.
7 According to art. 131c (1) and (2) and art.131f (2) of the EPA, the competent authority issues the permit for GHG emission within six months after receiving the application of the operator, and this permit precedes the construction of the installation. The monitoring for the installation is mandatory for each activity covered by the Scheme. The construction of installation is not activity, covered by the Scheme.