10235 Compliance
Comply with the submittal, substitutions and sampling section of the General Requirements section of this Specification.
10236 Protection
Metal work shall be adequately protected during transport and after installation from damage that may be caused by work on other trade.
10237 Samples
Samples of each type of work in its component material, fabricated, assembled, fixed and finished form shall be produced as required for approval by the Engineer. All materials and work thereafter shall in all respects comply with the approved samples.
Samples shall be maintained and kept in their original condition until permission to remove them is granted by the Engineer.
Dostları ilə paylaş: |