General requirements



Yüklə 475,5 Kb.
səhifə145/249
tarix22.02.2022
ölçüsü475,5 Kb.
#114634
1   ...   141   142   143   144   145   146   147   148   ...   249
BaTCoDA

10235 Compliance

Comply with the submittal, substitutions and sampling section of the General Requirements section of this Specification.


10236 Protection

Metal work shall be adequately protected during transport and after installation from damage that may be caused by work on other trade.


10237 Samples

Samples of each type of work in its component material, fabricated, assembled, fixed and finished form shall be produced as required for approval by the Engineer. All materials and work thereafter shall in all respects comply with the approved samples.


Samples shall be maintained and kept in their original condition until permission to remove them is granted by the Engineer.

Yüklə 475,5 Kb.

Dostları ilə paylaş:
1   ...   141   142   143   144   145   146   147   148   ...   249




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin