General requirements



Yüklə 475,5 Kb.
səhifə162/249
tarix22.02.2022
ölçüsü475,5 Kb.
#114634
1   ...   158   159   160   161   162   163   164   165   ...   249
BaTCoDA

11142 Two coat plaster

Plaster shall be applied in two coats with the following mix proportion for mortar. The aggregate for mortar to be used shall comply with table 1 of BS 1199 for lime plaster and BS 1198 for gypsum plaster.


First coat: 1 Part cement to 2.5 parts aggregate by volume.
Second coat: 1 Part cement to 1 part lime and 6 parts of aggregate by volume.

Or

1 Part of cement to 4 parts of aggregate by volume.


The lime shall be replaced by gypsum where gypsum plaster is to be used. The first coat to be applied to a thickness of 5mm shall be spread by trowel, struck off level, and allowed to cure for 24 hours.
The first coat shall be wetted and the plumb line for the second coat established after 24 hours. The second coat of plaster shall be applied within 4 hours of the establishment of plumb line on the surfaces.
The second coat shall be applied by trowel to a maximum thickness of 12mm. This coat shall be allowed to cure for a minimum of 21 days before further finish is applied.


Yüklə 475,5 Kb.

Dostları ilə paylaş:
1   ...   158   159   160   161   162   163   164   165   ...   249




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin