General requirements



Yüklə 475,5 Kb.
səhifə177/249
tarix22.02.2022
ölçüsü475,5 Kb.
#114634
1   ...   173   174   175   176   177   178   179   180   ...   249
BaTCoDA

11245 Earth floors

Earth floors shall be constructed on compacted and leveled earth sub-floors. The material for the screed shall be made by mixing non-expansive clay with water to form a consistent mix of suitable workability.

The mix shall be spread on the sub-floor and trowel led with a wooden float to a finished thickness of 20mm.

11246 PVC tiles & skirting

PVC tiles and skirting shall be laid on properly finished, cured and aged floor screeds with approved glue in accordance with the manufacturers instructions. PVC tiles and skirting shall be dusted in saw dust and polished to remove glue and other stains on surface.


PVC tiles shall not be laid before two coats of paint are applied to wall and ceiling surfaces.

Yüklə 475,5 Kb.

Dostları ilə paylaş:
1   ...   173   174   175   176   177   178   179   180   ...   249




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin