Wall tiles shall be bedded with straight joints in patterns as shown on drawing or directed by the Engineer. The mortar to be used for wall tile bedding shall be 1 part cement and two parts fine aggregate.
Tiles shall be left undisturbed for 24 hours and wetted for 7 days. The joints of wall tiles shall be grouted in white cement and cleaned down at completion of work.
Tiles shall be washed down and rubbed with clean soft cloth to produce smooth & shiny surfaces.