General requirements


SEPTIC TANKS, SOAK PITS & PERCOLATION FIELD



Yüklə 475,5 Kb.
səhifə212/249
tarix22.02.2022
ölçüsü475,5 Kb.
#114634
1   ...   208   209   210   211   212   213   214   215   ...   249
BaTCoDA

1436 SEPTIC TANKS, SOAK PITS & PERCOLATION FIELD

The relevant sections of the Technical Specification shall be applied to the construction of the above. The measurement shall be done in accordance with the stated method of measurement for each item in the works.


1437 VALVES

Flanges check valves, gate valves, service valves, etc., shall be in the specified material and size and installed at the positions indicated on the drawings or as directed. The installation shall include pipe fittings for the easy removal and assembly of the valves for maintenance.



Yüklə 475,5 Kb.

Dostları ilə paylaş:
1   ...   208   209   210   211   212   213   214   215   ...   249




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin