16373 Execution
163731 Preparation
Examine the areas and conditions under which work of this Section is to be installed. Correct conditions detrimental to proper and timely completion of the Work. Do not proceed until unsatisfactory conditions have been corrected.
After preparation of sub-grade thoroughly scarify and sprinkle the entire area to be paved, and then compact by rolling to a smooth, hard, even surfaces of 95%MDD compaction to receive the aggregate base. Finish to the required grades, with due allowance for the thickness of base and finished surfacing to be placed thereon.
Dostları ilə paylaş: |