023142 Classification of fill

Fill material shall be classified as: -


Backfill to excavation - Suitable material arising from excavation and capable of being compacted to form a stable filling having side slopes as indicated on drawing or directed by the Engineer.
Selected excavated fill - Suitable non expansive material approved by the Engineer arising for excavation and capable of being compacted to form a stable filling having side slopes as indicated on drawings or directed by the Engineer.

Selected borrowed fill - Suitable non-expansive well graded soil or granular material with no rock lumps imported from outside and approved by the Engineer.



02315 Disposal

All unsuitable and surplus suitable material arising from excavations shall be disposed off when instructed by the Engineer.

Disposal shall be made to tips directed by the Engineer or indicated in the document. In the absence of direction from the Engineer or indication in the documents, it is the contractor’s responsibility to identify the appropriate tip and dispose the material.

Disposal shall be understood to include stock piling, loading, transporting, dumping and wheel spreading at tip. Disposal shall be measured as the net volume arising from the void created by the excavation, less excavated material backfill, filled and wheel spread within site or left stockpiled.



Yüklə 475,5 Kb.

Dostları ilə paylaş:
1   ...   25   26   27   28   29   30   31   32   ...   249




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin