0314 EXECUTION
03141 Transporting
Concrete shall be handled from the place of mixing to the place of final deposit as rapidly as practicable by methods, which will prevent segregation or loss of ingredients. It shall be deposited as near as practicable in its final position to avoid re-handling or floating. When chuting is used the inclination of the chute shall be such as to allow the concrete to flow without the use of water in excess of the specified volume for mix and without segregation or loss of the ingredients. Details of any proposed chuting plant must be approved before the plant is delivered.
Dostları ilə paylaş: |