General requirements



Yüklə 475,5 Kb.
səhifə82/249
tarix22.02.2022
ölçüsü475,5 Kb.
#114634
1   ...   78   79   80   81   82   83   84   85   ...   249
BaTCoDA

0516 REPLACEMENT

In the event of damage before or after installation, take immediate action to repair, rectify or replace as necessary and to approval by the Engineer at no additional cost to the owner.


0517 GUARANTEE

Ensure that the guarantee covers a minimum of 10 years or the time and performance requirements of the owner if over 10 years.


0518 PRODUCTS
05181 Concrete Primer

Concrete primer shall be liquid, produced from high quality asphalt, capable of absorbing dust and scale to provide bondable concrete surfaces. It shall be applied as an undercoat for built-up roofing.



Yüklə 475,5 Kb.

Dostları ilə paylaş:
1   ...   78   79   80   81   82   83   84   85   ...   249




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin