112 FLOOR & WALL FINISH
1121 DEFINITIONS
1122 GENERAL REQUIREMENTS
11221 Work Included
Provide cement, lime, aggregate, tiles, admixtures, and other finishing materials, labour and tools for the satisfactory completion of the works and polishing at the end of the work.
11222 Related Works Described Elsewhere
Cast in place concrete Section 031
Concrete formwork Section 032
Masonry works Section 04
Plaster & Pointing Section 111
11223 Quality Assurance
112231 Standard
Comply with the following standard.
ES C D5 201 General requirement, Portland Cement, ESI
ES C D5 003 Hydrated lime, ESI.
BS 1198 Sand for internal plastering with gypsum plasters.
BS 1199 Sand for external rendering, internal plastering with lime and Portland cement and floor screeds.
ASTM C94 Mixing water for concrete.
DES C.D3.303 Terrazzo tiles, general requirement, ESI.
DES C.D3.302 Cement flooring tiling, general requirement, ESI.
DES C.D4.052 Glazed ceramic tiles, general requirements, ESI.