BaTCoDA

14. SANITARY INSTALLATION




141 GENERAL REQUIREMENT
1411 WORK INCLUDED: Provide all material, as indicated in the drawings and specified herein, labour, equipment, tools, temporary supports, and related items required for the satisfactory installation of sanitary works.

1412 RELATED WORKS DESCRIBED ELSEWHERE:

Earthwork (Section 02), Concrete (Section 03), Masonry (Section 04), Finishing (Section 11) and other related works described elsewhere in this specification shall be considered as equally applicable to this section in so far as the work is related.