General requirements



Yüklə 475,5 Kb.
səhifə23/249
tarix22.02.2022
ölçüsü475,5 Kb.
#114634
1   ...   19   20   21   22   23   24   25   26   ...   249
BaTCoDA

023122 Felling of Trees
Trees shall be up rooted, racked and disposed off or deposited as directed by the Engineer. Holes left by stumps and roots shall be filed with suitable material and compacted to approval by the Engineer. Trees shall be enumerated and identified by diameter.
023123 Removal of termite hills

Termite hills shall be removed and disposed to appropriate tip. The cavity formed by the removal of termite hills shall be treated with termite proof solution as described in the "Termite Proofing" section of this Specification and filled with suitable material and compacted to the approval of the Engineer.


Termite hill removal shall be measured by the volume of earth removed and disposed off.

Yüklə 475,5 Kb.

Dostları ilə paylaş:
1   ...   19   20   21   22   23   24   25   26   ...   249




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin