General requirements


Asphalt paving shall be measured by area



Yüklə 475,5 Kb.
səhifə242/249
tarix22.02.2022
ölçüsü475,5 Kb.
#114634
1   ...   238   239   240   241   242   243   244   245   ...   249
BaTCoDA

16363 Asphalt paving shall be measured by area.
1637 Asphalt Concrete Paving
16371 General
163712 Work included

Provide all material, labour and equipment for the satisfactory execution of asphalt concrete paving including the following.




  • Final preparation of sub grade;

  • Soil sterilization under pavement;

  • Aggregate base course;

  • Asphalt surfacing materials;

  • Placing asphalt concrete;

  • Flood test;

  • Seal coat;


163712 Related work described elsewhere

Excavating, filling and grading in this section & earthwork section 02.



163713 Qualifications of workmen

Provide at least one person who is thoroughly trained and experienced in the skills required, who shall be completely familiar with the design and application of work described in this Section, and who shall be present at all times during progress of the work of this Section and shall direct all work performed under this Section.


Use only personnel who are thoroughly trained and experienced in the skills required for execution of asphalt concrete work.

Yüklə 475,5 Kb.

Dostları ilə paylaş:
1   ...   238   239   240   241   242   243   244   245   ...   249




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin