1642 Land Preparation

The area to be planted shall be graded to the profiles shown on landscape drawings.

Plant beds shall be graded to ensure that no ridges or depression (other than those on drawings) are formed and area is left in smooth and firm plane that ensures proper drainage and no future settlement of the soil.

The top layer shall be fine graded using suitable top soil obtained from site or imported from appropriate location.


1643 Planting

Plants shall be set in positions in the center of holes and the holes back filled around the roots. Grass shall be sown or planted with approved seed or grass type.


All plant & grass shall be protected by erecting temporary fences or barricades, signs and other protection as needed to prevent trampling.


1644 Maintenance

Plant shall be watered, weeds removed and cultivated to keep the plant in healthy growing conditions.


The plant shall be maintained to the agreed maintenance period or to the end of the construction maintenance period if no separate maintenance period is agreed.

Grass & plant showing defects at the end of the maintenance period shall be replanted and maintained by the Contractor for an equal maintenance period as the initial agreement at no cost to the Investor.



Yüklə 475,5 Kb.

Dostları ilə paylaş:
1   ...   241   242   243   244   245   246   247   248   249




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin