General requirements


Fair Face Concrete Formwork



Yüklə 475,5 Kb.
səhifə55/249
tarix22.02.2022
ölçüsü475,5 Kb.
#114634
1   ...   51   52   53   54   55   56   57   58   ...   249
BaTCoDA

032452 Fair Face Concrete Formwork

Formwork for exposed concrete surfaces to be finished fair faced shall be plywood, metal or other panel material to provide continuous, straight, and smooth as cast surfaces. Panel sizes shall be as large as practicable to minimize joints.


Where so directed faces of concrete shall be finished fair by means of wrote formwork, to produce a true surface and shall have all imperfections in the concrete face cut out and made good in cement mortar to match the texture and colour. The concrete shall be rubbed down with carborundum stone, dipped in cement grout to finish clean and smooth to a high standard, without trace of shuttering marks, joints or other disfigurements.

Yüklə 475,5 Kb.

Dostları ilə paylaş:
1   ...   51   52   53   54   55   56   57   58   ...   249




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin