General requirements


Related Works Described Elsewhere



Yüklə 475,5 Kb.
səhifə8/249
tarix22.02.2022
ölçüsü475,5 Kb.
#114634
1   ...   4   5   6   7   8   9   10   11   ...   249
BaTCoDA

01307 Related Works Described Elsewhere
The Technical Specification has been divided into sections. In dealing with a section, works that are necessarily related to the section under consideration, but not included in that particular section are referred to under "Related Works Described Elsewhere".
The reference to the works described elsewhere shall be considered as if the works have been described in that particular section and equally applicable as far as the work is related.

01308 Surface Preparation

Surfaces to receive work shall be clean from earth, dust, debris and other material spattered as a result of preceding work prior to the placement of succeeding work.


The approval of the Engineer shall be obtained after surface preparation and before further work is executed on the prepared surface. In addition to the above the requirements of surface preparation of each particular section of this Technical Specification shall be complied with.


Yüklə 475,5 Kb.

Dostları ilə paylaş:
1   ...   4   5   6   7   8   9   10   11   ...   249




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin