General requirements



Yüklə 475,5 Kb.
səhifə80/249
tarix22.02.2022
ölçüsü475,5 Kb.
#114634
1   ...   76   77   78   79   80   81   82   83   ...   249
BaTCoDA

05134 Compliance

All submittals shall comply with the general submittal and substitution sections of the General requirements of this Specification.


05135 Product data

Submit complete product data for approval within the time to be prescribed after signature of contract based on the schedule of work indicating the following and other information as may be requested by the Engineer.




  • List of proposed items to be furnished and installed under this section.

  • Manufacturers' name(s), brand and place of manufacture.

  • Manufacturers' specifications showing, the property of materials, application methods and tools for application.

  • Sample of materials if requested by the Engineer.



Yüklə 475,5 Kb.

Dostları ilə paylaş:
1   ...   76   77   78   79   80   81   82   83   ...   249




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin