Hubble Space Telescope (hst): Hubble Space Telescope (hst)
|
tarix | 29.10.2017 | ölçüsü | 508 b. | | #20107 |
|
Hubble Space Telescope (HST): Hubble Space Telescope (HST): HST NICMOS: - 189 x FoV,
- 38 x better sensitivity at K band, 8 x at H band
Spitzer: - 8 x Spitzer diameter
- Diffraction limited at 2 microns vs. 6 microns
- 8 to 24 x better angular resolution
- 10 x lower dark current supports R ~ 1000 at high redshift
Ground: - JWST and GSMT are complementary where capabilities overlap:
- HST: Keck diameter ratio ~ JWST:GSMT
- Background ~1,000,000 x larger on ground at 5 microns
Core Test integration complete - OTE/SC assemblies mated
- GSFC radiometers received and installed
- He shroud installed, leak checks completed
- MLI closeouts complete
- Instrumentation installation and checkout complete
Cool down started on April 17th Competed testing on May 26th
18 Flight PMSAs (6 A, 6 B, and 6 C segments) are at various stages of completion 18 Flight PMSAs (6 A, 6 B, and 6 C segments) are at various stages of completion - All segments have completed the surface grinding processes at Tinsley
- All but 5 segments have completed the rough polish process at Tinsley
- 16 flight mirrors have been shipped to Ball from Tinsley for configuration changes, assembly integration and testing
- 4 flight mirrors have been at the XRCF for Cryo Deformation Testing
- Next Cryo Deformation test with 5 flight and the completely polished ETU mirrors is scheduled to start in early January
- A1 is the first flight mirror in Cryo Null Polishing, now at Tinsley
Secondary Mirrors Secondary Mirrors - EDU SM is in final testing at BATC and is scheduled for delivery as a pathfinder in March 2010
- Flight SM is in initial rough polishing at Tinsley, pre-cryo testing
Tertiary Mirror - Flight TM has completed cryo and integration deformation testing at BATC
- Flight TM has begun Cryo Null Polishing at Tinsley
Fine Steering Mirror - Flight FSM has successfully completed cryo deformation testing at BATC; the null figure polishing target map is being developed
- Cryo Null Polishing of the Flight FSM is scheduled to begin next at Tinsley
JWST Dedicated Coating Chamber Chamber and coating qualification on schedule to support flight coating - FSM and TMA will be coated in Feb 2010
- PMSA EDU will be coated in Apr 2010
Dostları ilə paylaş: |
|
|