Figure 7.3 Budget allocation plan

EC funding for the DiNAMITe NoE will be held centrally in the project coordinator’s account. Detailed rules for budget allocation and decisions will be fixed in the consortium agreement.

 The provisional management Board has agreed the first 18-month budget plan. The management board will discuss and decide on updates of the budget plan subsequently and set up detailed 18-month budget plans annually.

  

The budgets will be assigned to the following DiNAMITe work package categories:

 

Integration of Research

 

- Researcher mobility and access to equipment/services at partners’ location:



  • Travel and subsistence covered for visiting researcher.

  • Equipment and/or labour cost covered for the host partner.

(The researcher shall provide a report and material for training/dissemination (if applicable) after completion of each project)
-Cluster meetings and researchers’ participation in ‘cross-cluster meetings’:

  • Travel and subsistence cost covered for active partners.

  • Room hire, catering and host organisation administrative expenses.

  • Cluster coordination including basic reporting

  • Labour and travel & subsistence cost for coordination activities

 

Joint Research Activities

 

- Additional small research of DiNAMIT project teams needed to ‘fill gaps’ in order to reach excellence (in addition to research that is already integrated under ‘A’)



  • Labour cost, travel and subsistence cost, equipment cost, other cost related to additional research activities.

(The researcher shall provide a report and material for training/dissemination (if applicable) after completion of each project).

 

- Joint preparation work needed (e.g.: small assessment study, feasibility study) to help to obtain additional funding from other sources in areas to be integrated into DiNAMITe programme at a later stage.



  • Labour cost, travel & subsistence cost, equipment cost, other cost related to additional research activities.

(The researcher shall provide a report and material for training/dissemination (if applicable) after completion of each project).

 

Spreading of Excellence

 

- Training activities including conception, preparation, documentation, etc.


  • Travel& subsistence, labour, subcontracting, and other cost.

- Dissemination and networking activities including conception, preparation, documentation, etc.

  • Travel & subsistence, labour, subcontracting, and other cost.

- Integration and networking activities towards a self-sustainable network

  • Travel & subsistence, labour, subcontracting, and other cost.

- Coordination of training, dissemination, and networking

  • Travel & subsistence, labour, and other cost.


Management (budget fixed to a maximum of 7% of total EC funds)

 

Any management activities at the consortium level as defined in EC regulations.



  • Labour, travel & subsistence, subcontracting, and other cost.


Rules for reimbursement of travel expenses and meeting cost

 

Rules for reimbursement or labour cost will be set up by the Management Board in accordance with



EC-approved guidelines

  • Travel expenses will only be reimbursed for active participants

  • Travel cost: Economy airfare, 2nd class train fare, or mileage (0.4 Euro/km).

  • Subsistence (149.63 Euro) for each night – includes hotel, taxi, meals, and all other cost.

  • Additional expenses will be covered for room hire, catering, and host organisation expenses.



B.8 Joint Programme of Activities – first 18 months
Introduction
The programme for the first 18 months is aimed at beginning the integration of the DiNAMITe members through activities both within clusters and between clusters. Within cluster activities will be centred around the initiation of joint pieces of research that address key issues and promote co-operation. Activities across clusters will also involve joint work but mainly help to catalyse the formation of the new inter-disciplinary DiNAMITe community. Both the integration activities and the joint research will contribute to the target of spreading excellence via training, dissemination and integration towards a sustainable consortium. Linkages are indicated in the Figure below, and the work plan for the first 18 months appears on the next page. Plans for the first 18 months are contained in the following forms.

Activities

For spreading

Excellence, WP5


Training and Education

WP5.1
Dissemination and Networking

WP5.2
Integration towards Sustainability

WP5.3


Theory Research WP4.1

Growth Research WP1.1

Devices Research WP3.1

Characterisation Research WP2.1


Work plan (first 18 months)

WP1


M00 M03 M06 M09 M12 M15 M18

|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|



D1.1 D1.3 D1.5 D1.7 D1.10 D1.12
WP1(a)

|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|

D1.2 D1.4 D1.6 D1.8 D1.9 D1.11 D1.13-

D1.15

WP2


M00 M03 M06 M09 M12 M15 M18

|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|



D2.1 D2.2 D2.3 D2.4 D2.7 D2.9 D2.11
WP2(a)

|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|

D2.5 D2.6 D2.8 D2.10 D2.12-

D2.14
WP3

M00 M03 M06 M09 M12 M15 M18

|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|



D3.2 D3.3 D3.4 D3.5 D3.7 D3.8
WP3(a)

|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|

D3.1 D3.6 D3.9-

D3.11 WP4

M00 M03 M06 M09 M12 M15 M18

|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|

D4.1 D4.3 D4.4 D4.6 D4.9

WP4(a)

|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|

D4.2 D4.5 D4.7 D4.10-

D4.8 D4.12

WP5

M00 M03 M06 M09 M12 M15 M18

|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|

D5.26

WP5.1

|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|

D5.1 D5.4 D5.5 D5.7- D5.15 D5.20

D5.6 D5.11 D5.16
WP5.2

|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|

D5.2 D5.12- D5.18 D5.23-

D5.3 D5.14 D5.19 D5.25
WP5.3

|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|___|

D5.17 D5.21- D5.22


Workpackage list (18months)

Work-


package

No1

Workpackage title

Lead


contractor

No2

Start


month3

End


month4

Deliv-


erable

No5

WP1


Integration of research:

Growth and Materials Development



10

M00

M18

D1.1–D1.12

WP1(a)

Joint Research:

Growth and Materials Development



10

M00

M18

D1.2-D1.15

WP2

Integration of research:

Materials and physical characterisation



13

M00

M18

D2.1-D2.11

WP2(a)

Joint Research:

Materials and physical characterisation



13

M00

M18

D2.5-D2.14

WP3

Integration of research:

Devices and Device Integration



39

M00

M18

D3.2-D3.8

WP3(a)

Joint Research:

Devices and Device Integration



39

M00

M18

D3.1-D3.11

WP4

Integration of research:

Theory and Modelling



1

M00

M18

D4.1-D4.9

WP4(a)

Joint Research:

Theory and Modelling



1

M00

M18

D4.2-D4.12

WP5

Spreading of Excellence

15

M00

M18

D5.26

WP5.1

Training and Education

15

M00

M18

D5.1-D5.20

WP5.2

Dissemination and Networking

15

M00

M18

D5.2-D5.25

WP5.3

Integration towards Sustainability

15

M00

M18

D5.17-D5.22

Yüklə 1,53 Mb.

Dostları ilə paylaş:
1   ...   10   11   12   13   14   15   16   17   18




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin