Place 5/8” Washer on each of the eight 5/8” Hex Head Bolts
Place 5/8” Washer on each of the eight 5/8” Hex Head Bolts
Insert the Bolts thru the Traffic Side of the Rail Panel and the Cable Anchor Bracket (on the backside of the Rail Panel) & Secure with Hex HGR Nuts
Slide one end of Cable into Cable Anchor Bracket - Place 1” washer and Hex Nut on End of the Cable extending thru the Bracket
Slide the other end of Cable between upper & lower sections of the HBA Post 1
Slide the other end of Cable between upper & lower sections of the HBA Post 1
On Post No. 1, bolt the 4"x5¾" x ¼” Cable Web Plate to the web (front) of the post with a 3/8" x 1½” bolt, with a washer under the 3/8”nut. The Cable Web Plate should be pushing down on the top of the Shank of the Cable Anchor.
Place the Cable Bearing Plate with the open side of the V-Notch pointing upward and the Plate Washer on the end of the Cable.
Place the Cable Bearing Plate with the open side of the V-Notch pointing upward and the Plate Washer on the end of the Cable.
The bearing plate should rest on the top of the flange of the HBA bottom post.
Install Post 2 so that the LARGER hole is placed DOWNSTREAM
Install Post 2 so that the LARGER hole is placed DOWNSTREAM
Guardrail is NOT attached (bolted) at Post 2 – Just the Flange Protector or Backup Plate is connected at Post 2
The Cable Anchor goes ABOVE the Strut NOT THROUGH the Strut
Web Plate Post 1 on Front
Bearing Plate @ Post 1 “V” goes up
Install Post 2 so that the LARGER hole is placed___________ from the end of the guardrail end treatment???
Install Post 2 so that the LARGER hole is placed___________ from the end of the guardrail end treatment???