The primary goals of the meeting were to review the work that was performed in the interim period since the seventh JCT-VC meeting in producing the 5th HEVC Test Model (HM) software and text and editing the 5th HEVC specification Working Draft (WD5), review the results from interim Core Experiments (CEs), review technical input documents, establish the 6th draft of the HEVC specification (to be issued as an ISO/IEC Committee Draft – CD) and the sixth version of the HEVC Test Model (HM6), and plan a new set of Core Experiments (CEs) for further investigation of proposed technology.