For further sources of information on disposal facilities the Ministry of for the Environment and Land Use Planning could be contacted.
In 1996, 68 dump sites were identified as needing to be closed at the cost of some 55 million US$. A plan to close and rehabilitate these dump sites was drawn up.
The execution studies for the establishment of 29 controlled landfills in the targeted townships have been completed;
A centre of hazardous wastes treatment (with a capacity of 85000 metric tonnes) will be ready by 2002; and