Ipa II cross-Border Programme Greece Albania


Common and programme specific indicators



Yüklə 0,52 Mb.
səhifə7/14
tarix08.01.2019
ölçüsü0,52 Mb.
#91915
1   2   3   4   5   6   7   8   9   10   ...   14

2.1.1.5 Common and programme specific indicators


(Reference: point (b)(ii) and (b)(iv) of Article 8(2) of Regulation (EU) No 1299/2013 and Article 2(2) of Regulation (EU) No 231/2014)

2.1.1.5.1 Priority axis 1 result indicators


Table 3: Programme specific result indicators

ID

Indicator

Measurement unit

Baseline value

Baseline year

Target value (2023)21

Source of data

Frequency of reporting

Specific Objective 1.1




Volume of urban effluents under secondary treatment

million m3

30

2014

41,31

Greek Min.of Environ./Albanian Ministry of European Integration

Bi-annually




Percentage of solid waste managed sustainably


%

75

2014

79

Solid Waste Management Bodies

Bi-annually




% of cross-border vertical axes to Egnatia motorway either constructed or with sufficient maturity to be constructed.


%

80,41

2014

100

Egnatia Odos S.A.

Annually

Specific Objective 1.2




Level of preservation of the protected natural CB areas


%

72,08

2015

79,29

survey

Bi-annually

Specific Objective 1.3




Energy Efficiency Awareness Barometer


number

5,94 (on a 1-10 scale)

2015

7 (on a 1-10 scale)

survey

Bi-annually

Specific Objective 1.4




Area damaged by forest fires (5-yr rolling annual average)

hectares

15010,89

2014

13450

European Forest Fire Information System

Annually

2.1.1.5.2. Priority axis 1 output indicators


Table 4: Common and programme specific output indicators


ID

Indicator (name of indicator)

Measurement unit

Target value (2023)

Source of data

Frequency of reporting

Thematic priority (c)

CO20

Additional population served by improved water supply

inhabitants

50000

Programme Management Information System (MIS)

Annual

CO21

Additional population served by improved wastewater treatment

inhabitants

24000

Programme Management Information System (MIS)

Annual




Additional solid waste management capacity created

Tonnes/yr

4000

Programme Management Information System (MIS)

Annual




Kilometers of CB road network studied

km

30

Programme Management Information System (MIS)

Annual




Number of square meters of border crossing buildings studied or constructed

m3

200

Programme Management Information System (MIS)

Annual

Thematic priority (b)

CO25

Surface area of habitats supported in order to attain a better conservation status

hectares

80000

Programme Management Information System (MIS)

Annual

CO34

Decrease of annual primary energy consumption of public buildings

Kwh/year

130000

Programme Management Information System (MIS)

Annual




People participating in awareness actions

participants

4300

Programme Management Information System (MIS)

Annual

CO23

Population benefiting from forest fire protection measures

inhabitants

11500

Programme Management Information System (MIS)

Annual



Yüklə 0,52 Mb.

Dostları ilə paylaş:
1   2   3   4   5   6   7   8   9   10   ...   14




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin