Kendriya vidyalaya



Yüklə 131,81 Kb.
səhifə5/12
tarix10.01.2022
ölçüsü131,81 Kb.
#99952
1   2   3   4   5   6   7   8   9   ...   12
Class

Aggregate %

Failures (Subject Wise)




Below 33 %

80% % above




XII A


NIL

02

Physics – 11

Chemistry – 06

Maths – 03

English – Nil

Hindi – NIL


On Roll - 30

Pass % - 60

XII B

11

(06)


Maths - 07

Chemistry – 0 5

Physics – 05

Biology – 02

C.S. – 02

English - 01



On Roll – 43

Pass % - 76

XIIC


03

01

Economics – 06

B.St. – 03

English - 02


On Roll – 43

Pass % - 83

XII D


25

Nil

Hindi -08

English – 03

Geography – 14

History – 15

Economics - 23


On Roll – 25

Pass % - Nil

The Chairman suggested to arrange Career counselling sessions for the students by Professional Counsellors to aware them about emerging career fields in every stream.

Principal apprised that KVS Delhi Region has linked professor Cousellor.

1. Study material for Class X and XII under printing in Delhi Region.

2. PSA test by KVS for VI - VIII.

3. OTBA in SA II for VI to IX & XI material under printing.

4. Information & letter shall be given to students & parents for PSA. 10% weightage of PSA in FA4 marks.

5.1st round of Note book checking completed.

6. Informing the academic report to the parent periodically.

7. Report Card for April to July already sent. PTM for UT1 shall be held on 22.08.2015. Monitoring of each student shall be done.

-The Chairman suggested that the meritorious students in Academics & Curricular Activities be honoured at school level also.

-also suggested that topper prizes to be given separately for all the streams Science, Commerce & Arts.

Principal informed that Honour board for Humanities is being prepared.

4 students selected for next stage examination.

Ms. Ankita Pandey and Miss Kanchan Tyagi XII Science selected for Final Main at IIT Gowahati.


Principal assured necessary action.

Principal assured necessary action.


4. Administration

Shortage of Staff

TGT S.St. 02 TGT Eng. 02

PRT 02 Nurse 01

Lab Attendant 01


Shortage of Nurse was conveyed to the VMC Member CMO & She ensured the needful in this regard.



5. Projects in Pipeline

A). M& R Work

a)Side path tiling.

b)cement patch work at cracks.

c)Iron cage for water tanks.

d)White wash of outer building wall.

e)Paint of inside half wall of primary and white wash of 03 rooms in primary

f)Renovation and repair of primary toilets.

g)Bitumen layer on roof top at some places.

h)Iron strip covering of ruffled joints of building.

i)furniture repair

j)Almirah repair - Library glass shelves - Iron Almirah

k)Fans repair.

l) Repair of water tanks connection broken by monkeys.

m)Poles for games

n) New doors(iron) for class room and cupboards required to replace termite eaten doors.

o)New display boards required for corridors.

p)Visitor chair near Principal office 02 seater steel chair required.

q)Shed of water point near primary required.

r)Sand pit repair


Yüklə 131,81 Kb.

Dostları ilə paylaş:
1   2   3   4   5   6   7   8   9   ...   12




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin