2.3PROJECT BENEFITS





  • By preventing permeability of the water supply lines, preventing mixing from outside and construct a healthier network

  • Replacement of pipes having risky material like asbestos (Precautions for replacement of asbestos containing equipment are explained in further sections)

  • Preventing loss of high amounts of treated water

  • Meeting water demand of growing service population in a sustainable manner

  • Reducing excavation and repair works caused by network failures

  • Providing water service with equal rates to people by resolving operation problems in the network

  • Reducing water cost due to the increase in water quantity reaching to consumers



3ENVIRONMENTAL MANAGEMENT PLAN

3.1ENVIRONMENTAL RISK FACTORS

3.1.1Excavation Quantity


Assumed excavation quantity during construction is given in Table 3 .5.

Table 3.5 Assumed Excavation Quantity*



EXCAVATIONS

QUANTITY (m3)

DY2

12.393

DY2A

9.450

DY6

3.367

DY8

5.690

TMY1

9.400

TMY4

9.400

TMY2

1.620

TMY5

920

TMY1 - DY2

13.680

TMY4 - DY2A

11.890

TMY2 - DY6

2.720

TMY5 - DY8

1.811

TMY1 SITE SETTING

2.500

DY2 SITE SETTING

17.500

DY2A SITE SETTING

4.000

DY6 SITE SETTING

5.000

DY8 SITE SETTING

1.350

TOTAL

112.691

* Structures and the site piping excavations within the reservoir area are not included.
Equipment that should be provided by the bidder who won the bidding is defined in the Tender Information Form of Part 3 of the Technical Specifications prepared by the Project and Tender Consultant. This machinery and equipment are shown in Table 3 .6.
Table 3.6 List of Machinery and Equipment Given in Specifications*

TYPE

AMOUNT

Excavator with 0.15 m3 bucket capacity

minimum 2 nos.

Excavator with 0.65 m3 bucket capacity

minimum 3 nos.

Loader with 2.5 m3 capacity

minimum 2 nos.

Dump truck with 8-10 carrying capacity

minimum 10 nos.

Excavator and loader (JCB or alike)

minimum 2 nos.

Mobile crane with 16 ton capacity

minimum 2 nos.

Bulldozer (D6 or alike)

minimum 2 nos.

Concrete plant with 1-30 m3/hour capacity

minimum 1 nos.

Transmixer with 5 m3 capacity

minimum 5 nos.

Vibrating cylinder (static 10 ton)

minimum 2 nos.

ACPhalt saw

minimum 4 nos.

Vibrating cylinder for narrow excavations

minimum 3 nos.

Pipe pressure test device

minimum 3 nos.

Hand compactor

minimum 3 nos.

Water tanker with 5 m3 capacity

minimum 2 nos.

Considering the working times and locations of the machinery and equipment listed above, it is assumed that the noise and vibration limits will not be exceed with measures to be taken.



3.2IMPROVEMENT PLAN


In this section of the report, in order to ensure conformity of activities, which will be carried out in planning/design, construction and operation stages of the proposed project, with principles and procedures stated in the national environmental legislations, said stages were established and submitted in the following "Improvement Plan".
Table 3.7 Improvement and Prevention Plan in the Construction Stage

Stage

Subject

Measures to be Taken

Responsible Organization

Stakeholders

Relevant Legislation

Construction




Excavation waste

Excavation waste from the excavation work will be used as filling material for road works and as an upper coat material for landfills.

Contractor

Neighborhood Population,

NGO's


Regulation for Control of Excavation Soil, Construction and Demolition Waste

Used pipe waste

Old pipes from replacement of the network will be disposed in Mersin - Çavuşlu landfill.


Contractor

Neighborhood Population,

NGO's


Regulation for Control of Excavation Soil, Construction and Demolition Waste (date 18.03.2004, no. RG 25406)

Historic, cultural and archeological assets

If any asset of historic, cultural or archeological value is found in excavations, Directorate of Provincial Culture and Tourism will be informed and works will stop. No work will continue until agreement and permission to do so is granted by this Directorate. Precautions will be taken for preventing the removal of artifacts by workers.

Contractor

Neighborhood Population,

NGO's,


Directorate of Provincial Culture


Law of Protection of Cultural and Natural Assets no 2863

Dust/air pollution

Vehicles carrying material will be covered on the top.

Working site will be wetted especially in warm, dry and windy weather.



Contractor

Neighborhood Population,

NGO's


Regulation for Control of Air Pollution Caused by Industrial Plants

Noise pollution

Noise levels of excavation and working machines operation at construction cannot exceed the level stated in the "Regulation for Assessment and Management of Environmental Noise". (Impact noise Lcmax cannot exceed 100 dBC.) Construction activities will be performed between 07.00-19.00 hours. Since the construction will be executed in three separate stages, generation of collective noise will be relatively avoided. In case when the construction activities must continue at night, local population that will be affected will be informed at least one week before the activity date.

Contractor

Neighborhood Population,

NGO's


Regulation for Assessment and Management of Environmental Noise / Vibration Regulation

Table 3.8 Improvement and Prevention Plan in the Construction Stage (cont'd)

Stage

Subject

Measures to be Taken

Responsible Organization

Stakeholders

Relevant Legislation

Construction

Exhaust fumes

During construction, each vehicle related with the construction will be checked and inspected with "Motor Vehicle Exhaust Emission Measurement License" to see whether the Exhaust Measurements are made in accordance with the criteria specified by the Ministry of Environment and Forestry

Contractor

Neighborhood Population,

NGO's


Regulation for Control of Exhaust Gas Emissions of Vehicles in the Traffic

Excavation

In order not to damage other infrastructural works, relevant organizations and institutions (water, natural gas, sewerage, communication, transportation) will be informed in written before the start of excavation. Necessary institutional permits will be obtained.

Contractor

Neighborhood Population,

NGO's


Municipalities

Police Directorate



Regulation for Infrastructure Coordination Centers of Greater Municipalities

Public safety

In order that the project will not create any danger for public safety (particularly to children), entry of people to the construction site should be prevented by placing plastic bands, barriers, phosphorous and illuminated warning signs. Additionally, necessary measures will be taken with relevant institutions to ensure the safe traffic flow.

Contractor

Neighborhood Population,

NGO's


Municipalities

Police Directorate



Regulation for Health and Safety in Construction Works

Worker dwellings

Worker dwellings will be constructed in a safe distance from the construction site. All equipments for workers’ dailly rations will be provided.

Contractor

Workers, Neighborhood Population, Municipalities, NGO’s

Regulation for Health and Safety in Construction Works

Access Roads

Road and traffic arrangements for construction equipments and trucks will be planned and applied.

Contractor

Neighborhood Population, NGO’s, Municipalities, Police Directorate

Regulation for Highway Traffic

Asbestos Cement Pipes (ACP)

Workers will use masks during the carriage, replacement, temporary and final landfilling works. The necessary isolation barriers will be provided around the body of waste.

Contractor

Workers, Neighborhood Population, Municipalities, NGO’s

Regulation for Health and Safety in Construction Works

Construction site restoration

At the end of construction, the site will be rehabilitated and the construction site will be reinstated.

Contractor

Neighborhood Population,

NGO's


Municipalities

Regulation for Environmental Inspection

Table 3.9 Improvement and Prevention Plan in the Operation Stage


Operation

Disasters and accidents

Immediate response plans will be established for damage, stealing, etc. events that may happen in valve rooms and pipes and reservoirs.

MESKİ

Neighborhood Population,

NGO's


Municipalities

Disaster Regulation for Infrastructures

Safety of water structures

Necessary monitoring and inspection measures will be taken against possibility of a sabotage to public health at points of reservoirs, rising centers and valve rooms.

MESKİ

Neighborhood Population,

NGO's


Municipalities

Disaster Regulation for Infrastructures

Measuring of Water Quality

Flow and analysis parameters of water quality will be measured periodically. Necessary intervention equipment will be provided.

MESKİ

Neighborhood Population,

NGO's


Municipalities

Regulation for Water of Human Consumption Purpose

Safety of Disinfectant Tanks

Disinfectant tanks will be appropriate for chemical storage. Detection, ventilation and discharge mechanisms will be provided to prevent leakages and gas accumulations. Tanks will be assembled special rooms. Special clothes for emergency actions will be provided.

MESKİ

Workers, Neighborhood Population, NGO’s, Municipalities

MESKİ

Consequently, environmental impacts of activities to be performed under the project are assumed not to reach a significant degree by specifying the measures to be taken under the project to minimize the environmental impacts caused by the project.




Yüklə 469,42 Kb.

Dostları ilə paylaş:
1   2   3   4   5   6   7




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin