3.6ORGANIZATIONAL ARRANGEMENTS

3.6.1Obligations and Action


The "Measures Plan" covering the measures to be taken to minimize negative impacts that may be caused by the activities to be carried out in planning/design, construction and operation stage of this project is given in Part 3.2, and the "Monitoring Plan" made to control the implementation conditions of the principles and procedures stated in the "Measures Plan" is given in Part 3.3. These plans also cover the organizations and institutions responsible for said items.
In the construction stage, MESKI will inspect the performance of contractors in complying provisions stated in the Environmental Management Plan. Monthly reports will be required periodically from the contractors about these matters and inspections will be made at site if necessary.
These reports to be taken from the contractors will be examined by MESKI Project Management Unit and findings of the report will be compared with own observations of this unit. As the result of this examination, suggestions of this unit will be submitted to Planning and Investments Office of MESKI and this office will take action to make necessary measures taken in accordance with the suggestions.
If a report is given about the project as required by the agreements made with the World Bank, Environmental Management Plan will also be mentioned in this report. During operation, MESKİ will publish semiannual reports about Environmental Management Plan’s performance.

3.6.2Organizational Qualifications

3.6.2.1Contractor Firm


All conditions necessary for qualification of the contractor firm are specified in detail in the technical and administrative specifications. Organizational capacities needed to implement improvement and monitoring plans defined in the Environmental Management Plan Report will be stated in the specifications. Following approval of the Environmental Management Plan, the Project and Tender Consultant will add the requirements about measures specified in the EMP to the specifications. In the tendering process, these requirements will be among the priority criteria in selecting the Contractor Firm.

3.6.2.2MESKİ


While primarily coordinating the progress of construction process, MESKİ, as the project owner, will perform management of Water Supply Structures in both administrative and technical ways in the operation stage. MESKİ is an investment and operation institution which has proven its organizational qualification with expertise and successes gained since the date of establishment. In response to enlargement of its responsibility area in parallel with the rapid change of population it serves, it made planning and implementation of new infrastructure investments without delay and continuously met increasing demands of public. As a result of the examinations made, it is seen that MESKİ, with its former investment and operation experience and existing technical capacity, is an organization qualified enough to take measures necessary for this project.
Under MESKİ, there are 4 Technical Offices and 3 Administrative Offices. Technical Offices consist of Water Sewerage and Treatment, Planning Investment and Construction, Electricity Machinery and Material Supply, Marina and Fisherman Shelter Offices. Administrative Offices consist of Subscriber Works, Staff and Training, Administrative and Financial Works Offices. With this structure, MESKİ is a dynamic public institution with an administrative and financial volume developing continuously. Considering its administrative and organizational experiences, it is seen that MESKİ has the integrity and capacity needed for implementation of the Environmental Management Plan.
MESKİ continuously inspects these qualifications with an effective public relations system. Feedbacks from the public are moved to agenda of administrations via the public relations system and necessary arrangements are made. Results of all actions are announced to public through the Press Release of MESKİ published periodically.

3.7INFORMING PEOPLE TO BE EFFECTED BY THE PROJECT


There is information with following headings about the Public Awareness Meeting held in April 30, 2007, about the project to be implemented. This information as well as some documents about the meeting are given below.

  • Announcement Information for Public Awareness Meeting (Location, date and background information)

Invitation Letter for the Public Awareness Meeting is sent to previously determined civil organizations, professional chambers, neighborhood headmen and various associations. Schedule and place information of meeting is specified in invitation letter. A copy of letter is attached in Appendix of Environmental Management Plan. (Appendix 1)

  • Date of meeting

Meeting was organized at 30.04.2007 , 14:00.

  • Place of meeting

The meeting was held in the Meeting room of the Technical Service Unit (Filter Building) where Planning and Investments Office of MESKI is also situated. This building is in the address of: Portakal Mah. Akbelen Cad. Mezarlık Karşısı – Mersin.

  • Those invited

In selection of public organizations invited to the meeting, representation of massive sections of public and conformity of the project subject with the fields of interest. Furthermore, neighborhood headmen were also invited. Associations invited to the meeting are listed in Table 3 .13, Professional Chambers in Table 3 .14, Trade-unions in Table 3 .15 and Neighborhood Headmen in Table 3 .16. Invited associations are also known as nongovernmental organizations. Affected groups are represented by associations, trade associations and headmen.

Table 3.13 Associations Invited to the Meeting



NO

ASSOCIATIONS

ADMINISTRATOR

TELEPHONE

1

Akdeniz Sanayici İş Adamları

Ali Haydar Ark

2381755

2

Anamur ve Yöresi

Orhan Doğan

3372020

3

Anıtlar Derneği

Ahmet Hocaoğlu

2317429

4

Çavuşlu Mahallesi Kül. Der.

Ahmet Güllü

3243325

5

Çevre Koruma Vakfı

Nuray Taş

3570820

6

Hayvan Dostları Derneği

Nilgün Derviş

4627453

7

Kızılay Mersin Şubesi

Bektaş Sacihan

2385123

8

Tarihi Yapıları Koruma Derneği

Mustafa Erim

3367226

9

Mersin Genç İş Adamları Der.

Abbas Taşdemir

3310004

10

Mersin Gönüllüler Platformu

Ömer Erdoğdu

3591271

11

Mersin İTÜ Mezunları Derneği

Mehmet Göre

3271870

12

Mersin Kültür ve Yardımlaşma

Ali Hallaç

2381714

13

Mersin Muhtarlar Derneği

Ali Gülgen

3372714

14

Mersinliler Derneği

Mustafa Er

2389410

15

Mesiad

Mustafa Güler

3295071

16

Mimar-Mühendis Tek. Derneği

Fehmi Tosun

3281792

17

Mülkiyeliler Derneği

Celalettin Çıplak

3270044

18

Nakliyeciler Derneği

Şemsi Sor

2351919

19

Sevkiyatçılar Derneği

Selami Dalgıç

2350341

20

Sokak Çocukları Derneği

Sabahat Aslan

2323600

21

Sokak Çocukları Kor. Derneği

İclal Tan

-

22

Tema Vakfı

Niyazi Cin

2387121

23

Tüketici Hakları Derneği

Mustafa Yavuz

3285843

24

Tüm Muhtarlar Derneği

Ahmet Sunay

3364911


Table 3.14 Professional Chambers Invited to the Meeting

NO

PROFESSIONAL CHAMBERS

ADMINISTRATOR

TelePHONE

1

Çevre Mühendisleri

Zehra Korkmaz

3289740

2

Emlakcılar

Y. Selim Madenli

3366523

3

Esnaf odaları

Talat Dinçer

2389400

4

Harita Mühendisleri

Cafer Kayadoğan

3368818

5

İnşaat Mühendisleri

Hasan Hazar

3257788

6

Jeofizik Mühendisleri

Ali Karan

3255043

7

Jeoloji Mühendisleri

Zühal Özananar

3283960

8

Makine Mühendisleri

Serdar Erkan

3273800

9

Mimarlar

Sabri Konak

3279933

10

Minibüscüler

Abdülaziz Biricik

2333296

11

Orman Mühendisleri

İbrahim Eraslan

3256393

12

Peyzaj Mimarları

Şeniz İşcan Ateş

2386288

13

Sıhhi Su Tesisatcıları

Mehmet Kabadayı

3362838

14

Şehir Plancıları

İsmet Güllü

3273300

15

Şöförler

Veysel Sarı

3373366

16

Taksiciler Esnaf

Salman Yuca

3373370

17

Umum Servis Araçları

Nesil Aydın

2371621

Table 3.15 Trade-unions Invited to the Meeting

NO

TRADE UNIONS

ADMINISTOR

TelePHONE

1

Ses

Abbas Koluaçık

3289740

2

Tümbelsen

Recep Kara

3366523

3

Yapıyol Sen

Ramazan Remzi Uslan

2389400

4

Birleşik Taşımacılık

Şeref Şahinbay

3368818

5

Belediye İş

Ali Sönmez

3257788

6

Genel İş

Hüseyin Cömert

3255043

7

Yol İş

Saim Evren

3283960


Table 3.16 Neighborhood Headmen Invited to the Meeting

NO

MUNICIPALITY

NEIGHBOORHOOD

HEADMEN

TelePHONE

1

Toroslar

Güneykent

Mustafa Ertong

3231208

2

Toroslar

Çağdaşkent

Hasan Hüseyin Yılmaz

2240077

3

Toroslar

Toroslar

Halil Polat

3211674

4

Toroslar

Mithat Toroğlu

Arif Azman

3225800

5

Toroslar

Yusuf Kılıç

Şeref Bolat

3226188

6

Toroslar

Portakal

Nazmi Kunt

3214028

7

Yenişehir

Fuat Morel

Ali Fideli

4732403

8

Yenişehir

50. Yıl

Hasan Balbay

3258332

9

Toroslar

Çukurova

Muzaffer Filiz

3241352

10

Toroslar

Çavuşlu

Halil İbrahim Soysal

3243232




  • Participants of the Meeting.

Information on participants of meeting are given in Table 3 .17, and the original participant list with signatures are given in Appendix 2.

Table 3.17 Meeting Participant List



NO

NAME AND SURNAME

ORGANIZATION

1

Fatih YILDIRIM

MESKİ

2

Mesut GÜNAY

MESKİ

3

A. Didem GÜNAY

MESKİ

4

Süleyman BÖLÜKBAŞI

MESKİ

5

Selahattin KAYA

MESKİ

6

Leman AKKAŞ

MESKİ

7

Şeref BOLAT

Y. Kılıç Mah. Muhtarı

8

Halis POLAT

Toroslar Mah. Muhtarı

9

Hasan KARATAŞ

MESKİ

10

E. Habib ÖZCAN

MESKİ

11

K. Cengiz İMERTAN

MESKİ

12

Fatma ERYÜREK

MESKİ

13

Erdinç KÖKSAL

SRP - Temelsu

14

Niyazi DONDURMACIOĞULLARI

Esnaf Odaları Birliği

15

Ahmet Tuncer MUTLU

Makine Müh. Odası

16

Hüseyin UĞUR

MESİAD

17

Sibel YALÇIN

MESKİ

18

Kamil ÜLGEN

MESKİ




  • Meeting program

Presentation was made by Environmental Management Plan Individual Consultant Assoc. Prof. Erdem Görgün. Meeting Program is listed below. A copy of presentation is given in Appendix 4

  • Project Background

  • Project Content and Stages

  • Project Benefits

  • Environmental and Social Impacts

  • Risks That May Arise in Construction

  • Improvement and Prevention Plan

  • Monitoring and Inspection of Measures

  • Questions and Comments

  • Summary minutes of meeting (comments, questions, answers of presenters)

Following presentation of Environmental Management Plan Individual Consultant Assoc. Prof. Erdem Görgün within the frame of the above presentation plan, questions and comments of participants were received. Stating that the water price is high in Mersin and Tarsus, Mr. Niyazi Dondurmacıoğulları, representative of Tradesman Chambers Union, asked what the cost of this project would be to water supply prices and to the public. Mr. Erdem Görgün who made the presentation told that there was a cost, considering the back payment of the credit received for the project, but losses would decrease by 30% with this investment and unit water cost would be reduced, so the project would pay itself in this respect. About the subject, Mr. Kamil Ülgen, Assistant General Director of MESKİ and Planning and Investments Office Head, told that water prices would not be increased in 2007 with the decision taken in General Board of MESKİ. Additionally, he reminded that wastewater investments made by MESKİ were also financed with the water incomes. Then, Mr. Erdinç Köksal, participating the meeting for the Project and Tender Consultant Temelsu-SRP firm, gave information on flows in the present condition.

Mr. Niyazi Dondurmacıoğulları, stating that he directly experienced the network construction previously in Tarsus, explained that the dust and noise caused by the construction adversely effected local people. He particularly emphasized that the mud in rainy weather was limited their life areas. He added that the unfavorable ness experienced promoted creation of doubts in the society about the construction structure. Starting from this example, he draw attention on the importance of minimizing the unfavorable ness with the measures to be taken and of ensuring acceptance of the project by society with a proper announcement. He stated that he, as the Chairman of Tradesman Chambers Union, was convinced by this meeting about necessity of the project and that he would feel responsible to inform people about this project. He told that introductory information would be given about the project in issues of the tradesman chambers. Telling that cross streets were narrow in Mersin and there was a traffic problem, Dondurmacıoğulları emphasized that loss of the tradesmen, who were in economical difficulties, should be ensured during construction of this project. Thanking Mr. Dondurmacıoğulları for his sensitivity, Mr. Kamil Ülgen told that the construction will be carried out in stages at each street and location, and the excavations would be covered immediately after laying of pipes.

Mr. Ahmet Tuncer, participating the meeting for the Chamber of Mechanical Engineers, asked the possibility of the pipeline, which would be laid with the project, to be executed in parallel with the natural gas network line to be constructed in Mersin in near future. Mr. Kamil Ülgen told that natural gas investment and this project are not in conformity in timing, and that more time was needed for implementation of the natural gas investment.




Figure 3.4 Presentation for EMP Public Awareness Meeting


Figure 3.5 Participants of EMP Public Awareness Meeting

  • Results of Public Awareness Meeting

Direct invitation method was used to provide an effective contribution, not to be limited with announcements for EMP Public Awareness Meeting, and invitation letters were sent to people and organizations given in the guest list. (Appendix 1) A brief information was given about the project in these letters, and it is stated that the meeting was held to examine the impact of the project on the environment and life of people.


Previously listed 24 associations (NGO’s), 17 professional chambers, 7 trade unions and 10 headmen are invited to the meeting. Invitation letter is sent to these stakeholders. Each individual is also invited directly by phone call. Moreover, visual and auditory announcements are made for attendance of stakeholders who are not invited.
Participation level of meeting was below expectation relatively with the number of invited people and organizations, but it is seen that participants were very concerned and sensitive to the subject. Necessary arrangements were made in the Final Environmental Management Plan in accordance with the suggestions of participants.
Furthermore, news about the project and EMP meeting are published on MESKİ Journal, Metropolitan Municipality Journal and Trade Corporation Journal. News are also published on newspapers and local TV channels. Consequently, community is informed about the project and EMP. Senstivities of community are inquired as well to adjust the EMP and application of the project and reach a community of opinions.
Information about the meeting was given in the press release of MESKİ and announced to public. Moreover, upon demand of Mr. Niyazi Dondurmacıoğulları, Executive of Tradesman Chambers Union, information on project and Environmental Management Plan was given to him. Mr. Dondurmacıoğulları told that they would publish an article and give information in the periodical of Chamber of Tradesman.

3.8PREPARATION OF ENVIRONMENTAL MANAGEMENT PLAN / WORK PROGRAMME


The work programme prepared in accordance with the 'Job Definitions and Services Scope' specified by MESKİ under the frame of Municipal Services Project is given below.

Table 3.18 EMP Management Plan

No

Stages

Duration

Date

1.

Commencement of Contract




05.03.2007

2.

Data Collection, Study and Pre-Evaluation

15 days

20.03.2007

3.

Preparation and Submission of Draft EMP

15 days

06.04.2007

4.

Public Awareness Meeting

21 days

27.04.2007

5.

Defining Necessary Measures and Costs for Completion of Organizational Qualifications

15 days

12.05.2007

6.

Creation and Submission of Final EMP

15 days

27.05.2007

4CONCLUSION

With this Environmental Management Plan, necessary measures and monitoring plans to be taken not to negatively effect environment, public health and safety in planning, construction and operation stages of this project were specified.


In order to realize these measures, necessary inputs will be provided to the tender documents being prepared by the Project and Tender Consultant. In the tender process when the contractor firm will be selected, capacity and experience to realize the measures emphasized in the Environmental Management Plan will be an important selection criterion.
Reflection of improvement and prevention plans, which are developed against relevant risks in the construction stage, on practices of the contractor firm at highest level will be ensured. Necessary attempts and inspections will be made for adopting of the legislation, on which those measures are based, by the executives of the contractor firm.
This project aims providing the society with water, as the basic requirement of life, in more efficient and healthy way. Methods to be applied in construction and operation of the project must also proceed in accordance with this target, and public health must be protected. Once the measures defined in the Environmental Management Plan are applied, target and method of the project will be integrated.

5RESOURCES USED IN PREPARATION OF THE ENVIRONMENTAL MANAGEMENT PLAN

5.1Official Documents


  • Consultancy Services Contract and Appendices

  • "Environmental Framework for Municipal Services Project"

  • The World Bank OP 4.0.1 (1999), Environmental Assessment Document from the Operational Policies of the World Bank (OP 4.0.1)



5.2Technical Documents About the Project


  • Mavi Müh, (2005), Feasibility Report and project documents prepared by Mavi Mühendislik in 2005

  • Temelsu, (2007), The investigation report prepared in March 2007 by the Project and Tender Consultant Temelsu Firm

5.3Legislation to be Taken Into Consideration in Environmental Management Plan


  • Regulation for Control of Excavation Soil, Construction and Demolition Waste no RG 25406 dated 18.03.2004

  • Law of Protection of Cultural and Natural Assets no 2863

  • Regulation for Control of Air Pollution Caused by Industrial Plants no. RG 26236 dated 22.07.2006

  • Regulation for Assessment and Management of Environmental Noise no. RG 25862 dated 01.07.2005

  • Regulation for Control of Exhaust Gas Emissions Caused by Motor Vehicles in the Traffic no. RG 25869 dated 08.07.2005

  • Regulation for Infrastructure Coordination Centers of Greater Municipalities

  • Regulation for Health and Safety in Construction Works no. RG 25325 dated 23.12.2003

  • Regulation for Environmental Inspection no. RG 24631 dated 05.01.2001

  • Disaster Regulation for Infrastructures no. RG 26435 dated 15.02.2007

  • Regulation about Water for Human Use no. RG 25730 dated 17.02.2005

  • Regulation About Health and Safety Measures for Works With Asbestos no. RG 25328 dated 26.12.2003

  • Hazardous Waste Control Regulation no. RG 25755 dated 14.03.2005

  • Occupational Safety And Health Regulation no. RG 25311 dated 09.12.2003

  • Road Traffic Regulation no. RG 23053 dated 18.07.1997


Yüklə 469,42 Kb.

Dostları ilə paylaş:
1   2   3   4   5   6   7




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin