GENERAL DIRECTORATE OF MESKI
MUNICIPALITY SERVICES PROJECT

WATER SUPPLY NETWORK REHABILITATION

RESERVOIRS, INTERRESERVOIR CONNECTION LINES

SUBPROJECT
ENVIRONMENTAL MANAGEMENT PLAN

FINAL REPORT
Assoc. Prof. Erdem Görgün io Environmental Solutions

Research & Development Co. Individual Consultant

Env. Eng. Murat Cem Ertürk io Environmental Solutions

Research & Development Co. Project Assistant

JUNE 2007


TABLE OF CONTENTS



1 INTRODUCTION 4

1.1 AIM 4

1.2 METHOD AND SCOPE 5

2 DESCRIPTIONS OF THE REHABILITATION PROJECT 7

2.1 BACKGROUND OF THE PROJECT 7

2.2 PROJECT CONTENT 7

2.3 PROJECT BENEFITS 15

3 ENVIRONMENTAL MANAGEMENT PLAN 16

3.1 ENVIRONMENTAL RISK FACTORS 16

3.2 IMPROVEMENT PLAN 17

3.3 MONITORING PLAN 21

3.4 RISKS AND SUGGESTIONS 24

3.5 IMPLEMENTATION PROGRAM 28

3.6 ORGANIZATIONAL ARRANGEMENTS 29

3.7 INFORMING PEOPLE TO BE EFFECTED BY THE PROJECT 31

3.8 PREPARATION OF ENVIRONMENTAL MANAGEMENT PLAN / WORK PROGRAMME 39

4 CONCLUSION 40

5 RESOURCES USED IN PREPARATION OF THE ENVIRONMENTAL MANAGEMENT PLAN 41

5.1 Official Documents 41

5.2 Technical Documents About the Project 41

5.3 Legislation to be Taken Into Consideration in Environmental Management Plan 41



INDEX OF TABLES


Table 2.1 Existing Water Supply Network Lines and Suggestions (Mavi Müh. 2005) 9

Table 2.2 Proposed Additional Reservoirs (Temelsu 2007) 10

Table 2.3 Proposed Additional Rising Centers (Temelsu 2007) 11

Table 2.4 Proposed Additional Connections Between Reservoirs (Temelsu 2007) 11

Table 3.5 Assumed Excavation Quantity* 16

Table 3.6 List of Machinery and Equipment Given in Specifications* 17

Table 3.7 Improvement and Prevention Plan in the Construction Stage 18

Table 3.8 Improvement and Prevention Plan in the Construction Stage (cont'd) 19

Table 3.9 Improvement and Prevention Plan in the Operation Stage 20

Table 3.10 Monitoring Plan During Construction 22

Table 3.11 Monitoring Plan During Operation 23

Table 3.12 EMP Implementation Program 28

Table 3.13 Associations Invited to the Meeting 32

Table 3.14 Professional Chambers Invited to the Meeting 33

Table 3.15 Trade-unions Invited to the Meeting 34

Table 3.16 Neighborhood Headmen Invited to the Meeting 34

Table 3.17 Meeting Participant List 35

Table 3.18 EMP Management Plan 39





INDEX OF FIGURES


Figure 2.1 Proposed Water Distribution System (Temelsu 2007) 13

Figure 2.2 Existing P1 Pumping Station and TMY1 Rising Center Location 14

Figure 2.3 DY3 Reservoir Location (Through D3 Reservoir) 14

Figure 3.4 Presentation for EMP Public Awareness Meeting 37

Figure 3.5 Participants of EMP Public Awareness Meeting 37


INDEX OF APPENDICES

Appendix 1 Sample Invitation Letter for Public Awareness Meeting

Appendix 2 Participant List and Signatures for Public Awareness Meeting



Appendix 3 Correspondence and Report for Directorate of Provincial Culture

Appendix 4 Presentation for the Public Awareness Meeting

1INTRODUCTION

1.1AIM


In parallel with the population growth caused by immigration, infrastructural demands have also been increased in the Mersin Province. In order to meet these requirements, General Directorate of Water and Sewerage Administration (MESKİ), Mersin Greater Municipality, has started implementation of a series of projects, which progress in coordination, for renewal of infrastructure and extension of services. Under these projects, water network system extension works were started to meet water demand of 19 Town Municipalities within the Greater Municipality boundaries. In parallel, the network renewal and repair project have been executed with the funding support of World Bank for Municipality Services Projects to reduce the loss and unaccounted for water rate to reasonable levels in the network. These projects, directed to network extension and renewal, are aimed to be completed in 2009.
Municipal Services Project aims financing investments from the World Bank funds for use in water, wastewater and solid waste projects of municipalities with coordination of the Bank of Provinces. Purpose of this project is to support municipal development in a sustainable manner.
Activities carried out under the project must be in conformity with effective Turkish Environment Regulations and Procedures and other Protection and Operation Policies, in particular the Environmental Assessment described in the Operation Policy 4.01 of the World Bank (The World Bank OP 4.0.1, 1999). Environmental Monitoring Criteria were established, meeting both Turkish and World Bank standards to monitor this conformity. These projects are evaluated in four categories according to these criteria. MESKİ’s project for rehabilitation of water supply network and connected units is under category B with the Monitoring Criteria. Category B defines projects that are not listed in Appendix I and Appendix II of the EIA Regulation under Turkish legislation, but that are site specific projects having impact on environmentally important areas in accordance with the World Bank Monitoring Criteria. An Environmental Impact Assessment (EIA) has not been done in this project for the reason that this project is not in the scope of Turkish legislation.
Preparation of an Environmental Management Plan covering construction and operation stage of the project in accordance with requirements of this category is the purpose of this study.

Yüklə 469,42 Kb.

Dostları ilə paylaş:
  1   2   3   4   5   6   7




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin