Minutes of the S2 meeting #14 4th to 8th of September 2000 Bristol, uk



Yüklə 2,33 Mb.
səhifə36/63
tarix03.01.2022
ölçüsü2,33 Mb.
#35593
1   ...   32   33   34   35   36   37   38   39   ...   63

4.2Call Flows

4.2.1Template to be used


S2-001484 from AT&T: Template for call flows

AT&T proposes a template for drawing the flow diagrams which allows to clearly show the alternatives when optional elements (e.g. firewalls) are used or not.



Discussion: Lucent stressed that the flows are stage 3 and then have to be handled by N1.

It was stressed that the tool is valid as long as the alternatives are not too different in term of flows, but in some cases it might be preferable to have two different figures.



Conclusion: Approved. The usage of the figures (one or many) to be decided on a case by case basis.
S2-001316 from Lucent: Revised Information Flow Template

Together with the previous document, this tdoc proposes a way to draw the call flows.



Conclusion: Encompassed by the previous document. Approved.


Yüklə 2,33 Mb.

Dostları ilə paylaş:
1   ...   32   33   34   35   36   37   38   39   ...   63




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin