Minutes of the S2 meeting #14 4th to 8th of September 2000 Bristol, uk



Yüklə 2,33 Mb.
səhifə61/63
tarix03.01.2022
ölçüsü2,33 Mb.
#35593
1   ...   55   56   57   58   59   60   61   62   63

8.2Tdocs not to be handled


S2-001363 from Vodafone: Withdrawn (on 23.060, CR 171, cat ?, ?)

Conclusion: Revised to S2-001523
S2-001364 from Vodafone: Withdrawn (on 23.060, CR 172, cat ?, ?)

Conclusion: Revised to S2-001524
S2-001369 from Korea Telecom: Withdrawn
S2-001395 from Alcatel: Local service (on 23.228, R00)

Conclusion: Withdrawn
S2-001403 from Alcatel: Use of Firewall CSCFs (role of I-CSCF) (on 23.228, R00)

Conclusion: Handled by drafting.
S2-001421 from N4-000549: LS on Architectural Impact of Combined MAP Signaling for Mobility Management

Identical to S2-001386.



Conclusion: Withdrawn.
S2-001477 from Alcatel: Correction to Data Retrieve protocol stacks endpoints (on 23.121, CR 059, R99)

Conclusion: Replaced by 1512
S2-001478 from Alcatel: Correction to Data Retrieve protocol stacks endpoints (on 23.121, CR 060, R00)

Conclusion: Replaced by 1513
S2-001506 from Siemens: Withdrawn
S2-001507 from Motorola: Withdrawn, replaced by 1541

9Executive summaryies




9.1Executive summary (tdocs sorted by the order they appear in these minutes)





Ag. Item

Tdoc #

Source

Title

Spec

CR #

cat

Rel

Conclusion

1

S2-001350

Chairman

Agenda













Approved.

1

S2-001351

MCC

Minutes of S2’s drafting meeting in Vancouver













Noted (already approved by e-mail).

3

S2-001381

S1-000616

LS on Response to comments on TR22.976 (v1.4.0)













Noted.

3

S2-001382

S1-000609

LS Cc S2 on “Priority of ME resources for WAP and SIM toolkit applications”













Noted.

3

S2-001384

N4-000520

Response LS on Terminology of TrFO/TFO and possible interworking scenarios













Proposed answer in S2-001662.




S2-001662

Ericsson

Proposed answer to S2-001384













For e-mail approval.

3

S2-001385

N4-000507

LS on appointment of people to maintain liaison with IGC













Noted.

3

S2-001387

N4-000515

LS (Cc S2) on request for response to N4 LS (N4-000340)













S2’s chairman has to contact N1’s chairman to check if S2 is still requested to perform some actions.

3

S2-001388

N2-000344

LS on IPT Basic Call Handling













Proposed answer in S2-001515.

3

S2-001515

BT
















For e-mail approval.

3

S2-001390

R3-001998

LS response on support of AMR via Iu-ps in GERAN













An answer will be provided in S2-001516.

3

S2-001516

T-Mobil (Oscar)
















For e-mail approval.

3

S2-001391

R2-001533

LS response (R3-001581) on SRNS Relocation of RT RABs and interaction with PDCP













Noted.

3

S2-001412

R3-001581

LS to R2 and S2 on Relocation interaction with PDCP













Noted.

3

S2-001392

R1- 000765

LS on ‘Proposed changes to 3GPP Release 2000 work plan’













To be included in the next version of the Work Plan by IGC convenor or by MCC.

3

S2-001393

N2-000194

LS on Proposed updates to Work Plan Version 1.0 relating to CAMEL Phase 4 work item













To be included in the next version of the Work Plan by IGC convenor or by MCC.

3

S2-001405

N1-000639

LS to R3 (Cc S2) on including the SAI into the Gs-i/f BSSAP+-LOCATION-UPDATE-REQUEST message as requested in N1-000543













Noted.

3

S2-001406

N1-000758

LS on Removal of Service Accept













Obsolete: the CR 184 in S2-001638 is already the compromise solution found at last N1 meeting.




S2-001638

N1-000973

LS on UMTS Service Request procedure

23.060

184

F

R99

For e-mail approval.

3

S2-001420

T2M000090

LS on Terminal Capability Negotiation













Noted.

3

S2-001407

N1-000712

LS on Terminal capability negotiation including codecs (reply)













Noted.

3

S2-001423

S1-000658

LS (Cc S2) on Guidance on future work for T2 SWG5, Multi-mode terminals













Noted.

3

S2-001413

R3001649

LS Response on hexadecimal IMEI format













Noted: S1 accepts these changes in S2-001408.

3

S2-001408

N1-000713

LS response on hexadecimal IMEI format













Noted.

3

S2-001409

N1-000793

LS to S2 on 23.060 CR “Change of the Cell update procedure”

23.060

147r1

F

R99

Approved (after checking that it is possible to include it as such in v.3.4).

3

S2-001411

R3-001578

LS on Progress of Real-Time PS Domain SRNS Relocation













Proposed answer in S2-001519.

3

S2-001519

Nokia (Marc)
















For e-mail approval.

3

S2-001414

SMG9-00262

LS on Priority of ME resources for WAP and SIM toolkit applications













Noted.

3

S2-001415

S5-000320

LS on Protocol Choice for Layer I of MAP Security













Noted.

3

S2-001416

S5-000322

LS on Service Management – New R00 work item proposal under SA5’s responsibility













Not approved.

3

S2-001418

S3-000478

LS to S2 on use of IP for security key distribution













Noted. To be kept in mind when further progressing the work.

3

S2-001419

T2M000089

LS on VHE/OSA presentation













Too late.

3

S2-001422

S1-000651

LS on Re-establish Capability for Emergency call













Proposed answer in S2-001520.

3

S2-001520

Vodafone (Chris)
















For e-mail approval.

3

S2-001424

R2-001859

LS on Corrections to relocation procedures in 23.060

23.060




F

R99

Revised CR in S2-001521.

Proposed LS back in S2-001522.



3

S2-001521

Nokia




23.060

183

F

R99

For e-mail approval.

3

S2-001522

Nokia
















For e-mail approval.

3

S2-001425

R2-001817

LS response to R3-002198 on Directed signalling connection re-establishment at RRC













Proposed answer in S2-001527.




S2-001527




Response to LS in S2-001425.













For e-mail approval.

3

S2-001426

R2-001865

LS response to S2-001053 on “Two phase resource reservation”













Noted.

3

S2-001434

N1-000997

LS on Answer to Proposal of exchange of the terms “in GSM“ and “in UMTS“













Accepted. A proposed answer is provided in S2-001528.




S2-001528

Lucent
















For e-mail approval.

3

S2-001427

R2-001868

LS (Cc S2) on Answer to Proposal of exchange of the terms “in GSM” and “in UMTS”













Noted.

3

S2-001428

R2-001870

LS on Failure during SRNS Relocation













Proposed answer in S2-001529.




S2-001529

Nokia
















For e-mail approval.

3

S2-001430

T3-000470

LS on Clarification of UMTS-AKA for GSM R’99 Mobiles













Noted.

3

S2-001435

N1-001023

LS on the introduction of GEA2.













Approved. The editor should check that this decision does not impact 03.60 and 23.060.




S2-001658

N4-000713

LS on SRNS relocation based on global title













Proposed answer in S2-001658. Linked with S2-001469. Proposed answer in S2-001661




S2-001661

Ericsson
















For e-mail approval.

3

S2-001431

Tiphon

Presentation of Tiphon













Noted.

3

S2-001432

Tip 19TD129

LS on TIPHON architecture document













Noted.

3

S2-001433

Tiphon

Document DTS-02003v0.10.10













Noted.

4

S2-001353

Alcatel/CN2

Detailed on Camel interworking with SGSN (SGSN CAMEL procedures)

23.060

169

F

R99

Editorially revised to S2-001530.




S2-001530

Alcatel

Detailed on Camel interworking with SGSN (SGSN CAMEL procedures)













Approved.

4

S2-001362

Vodafone

DTM: simultaneous LAU and RAU procedures on an SDCCH

23.060

170

F

R99

Approved.

4

S2-001439

Siemens

Compatibility GTPv0/GTPv1 in case of SGSN change

23.060

177

F

R99

Editorially revised to S2-001531.




S2-001531

Siemens

Compatibility GTPv0/GTPv1 in case of SGSN change

23.060

177r1

F

R99

Approved.

4

S2-001491

Motorola

IP v6 address stateless autoconfiguration

23.060

180

F

R99

Not approved. Later revised to S2-001543.




S2-001543

Motorola

IP v6 address stateless autoconfiguration

23.060

180r1

F

R99

Not handled.

3

S2-001525

GERAN

LS on 23.060 Change Requests for Dual Transfer Mode













See conclusion on the CRs themselves in the two following tdocs.

4

S2-001523

Vodafone

DTM: reuse of the GPRS Suspension procedure in cells with no DTM capabilities

23.060

171r1

F

R99

Approved.

4

S2-001524

Vodafone

DTM: download of the IMSI from the SGSN to the BSC

23.060

172r1

F

R99

Approved.

4

S2-001371

Ericsson

CS Paging procedure in UMTS

23.060

173

F

R99

Approved.

4

S2-001372

Ericsson

Clarification on P-TMSI and P-TMSI signature at Detach

23.060

174

F

R99

Approved.

4

S2-001373

Ericsson

Serving RNS Relocation Procedure

23.060

175

F

R99

Editorially revised to S2-001532.

4

S2-001532

Ericsson

Serving RNS Relocation Procedure

23.060

175r1

F

R99

Approved.

4

S2-001374

Ericsson

DRX and MS network capabilities within UMTS

23.060

176

F

R99

Editorially revised to S2-001533

4

S2-001533

Ericsson

DRX and MS network capabilities within UMTS

23.060

176r1

F

R99

Approved.

4

S2-001514

Motorola

Suspend at UMTS to GSM inter-system change during a CS connection

23.060

181

F

R99

Not approved. Revised to S2-001534.

4

S2-001534

Motorola

Suspend at UMTS to GSM inter-system change during a CS connection

23.060

181r1

F

R99

For e-mail approval.

4

S2-001517

Motorola

Removal of PDP type OSP:IHOSS in R99

23.060

182

F

R99

To be revised to S2-001536.

The corresponding CR on 03.60 is in S2-001535.



4

S2-001536

Motorola

Removal of PDP type OSP:IHOSS in R99

23.060

182r1

F

R99

For e-mail approval.

4

S2-001535

Motorola

Removal of PDP type OSP:IHOSS in R99

03.60

A188

F

R98

For e-mail approval.

4

S2-001512

Alcatel

Correction to Data Retrieve protocol stacks endpoints

23.121

059r1




R99

Revised to S2-001537.

4

S2-001537

Alcatel

Correction to Data Retrieve protocol stacks endpoints

23.121

059r1r1




R99

For e-mail approval.

5.3

S2-001513

Alcatel

Correction to Data Retrieve protocol stacks endpoints

23.121

060r1




R00

Revised to S2-001538.

5.3

S2-001538

Alcatel

Correction to Data Retrieve protocol stacks endpoints

23.121

060r2




R00

For e-mail approval.

4

S2-001458

NTT Commware

Correction on Iu Release Procedure

23.060

178

F

R99

Revised to S2-001607.

4

S2-001607

NTT

Correction on Iu Release Procedure

23.060

178r1

F

R99

Approved, revised to S2-001654 because of an editorial error.




S2-001654

NTT

Correction on Iu Release Procedure

23.060

178r1

F

R99

Approved.

5

S2-001459

NTT Commware

Introduction of Integrated Serving Node

23.002

021

B

R00

Not approved: information for CN is expected before.

5

S2-001608

NTT
















For e-mail approval.

3

S2-001386

N4-000549

LS on Architectural Impact of Combined MAP Signaling for Mobility Management













An answer is generated based on these inputs in S2-001608.

5.3

S2-001457

NTT Commware

Draft TR on Feasibility study on architecture for network requested PDP contextactivation with User-ID

23.8xx










For e-mail approval. Revised later on during this meeting.

3

S2-001609

G00-0374

LS on inter-BSC hard handover in GERAN for the packet switched domain













See conclusions of S2-001397.

5

S2-001397

Alcatel

Use of Iur and Iu-ps interfaces – Handovers










R00

Proposed answer to S2-001609 in S2-001613. To be decided later on, based on its content, whether it has to be sent or not.

For the other questions of S2-001609, a drafting group is established.



5

S2-001613

Alcatel

Draft LS to GERAN (Cc R2, R3) on inter-BSC hard handover in GERAN for the packet switched domain













Editorially revised to S2-001637.




S2-001637

SA2

LS to GERAN and R3 (Cc R2) on inter-BSC hard handover in GERAN for the packet switched domain













Approved.

5

S2-001398

Alcatel

Handover and RAN Relocation for the GERAN (companion of S2-001397)

23.121

058




R00

Withdrawn, due to the lack of agreement on S2-001397.

5

S2-001485

AT&T

PS domain multiple RABs Real time HO requirements













An LS is generated in S2-001614.

5

S2-001614

AT&T
















For e-mail approval.

5

S2-001612

Vodafone

Initial thoughts on GERAN impacts on overall system architecture













LS generated on this basis in S2-001615.

5

S2-001615

Vodafone
















For e-mail approval.

5.1







REGISTRATION
















2

S2-001375

Vice Chairman

Status of S2 E-mail approval between S2#13 and S2#14













Alcatel sent some comments on CSCF discovery, but too late (after the deadline).

S2-001252, 1259 and 1261 were supposed to be approved by e-mail, but they are asked to be approved now: to be approved by Wednesday if no objection is made.



5.1

S2-001482

AT&T

Multiple I-CSCF













Revised to S2-001540, with these changes.

5.1

S2-001540

AT&T

Multiple I-CSCF













Approved.

5.1

S2-001400

Alcatel

P-CSCF discovery

23.228







R00

Not approved: the conclusion is still to use DHCP, as agreed in Vancouver.

5.1

S2-001438

Siemens

CSCF Availability at Session Setup













Not approved as such.

5.1

S2-001442

BT

Revised proposal for registration flows













A general conclusion will be made on all the contributions dealing with registration flow.

5.1

S2-001452

Lucent

Serving CSCF Assignment













Handled by the drafting group on Registration.

5.1

S2-001462

Ericsson

Triggering the CSCF Selection Function. Home Network Control case.













Handled by the drafting group on Registration.

5.1

S2-001453

Lucent

Registration/Deregistration Information Flows













Handled by the drafting group on Registration.

5.1

S2-001460

Ericsson

Serving CSCF Selection Function













Handled by the drafting group on Registration.

5.3

S2-001469

Ericsson

HSS Role as VLS













Not approved. Some written contributions are needed on this subject.

5.1

S2-001463

Ericsson

Triggering the CSCF Selection Function. Visited Network Control case.













Also not approved.

5.1

S2-001465

Ericsson

Registration procedures













Handled by the drafting group on Registration.




S2-001641

Nokia

Many to many relationship on Iu interface

23.121

061

B

R00




5.1

S2-001476

Lucent

Registration Models













Not approved.

5.1

S2-001541

Motorola Inc, Nortel Networks, Siemens, Alcatel, T-Mobil

Serving CSCF Selection













Not approved. Handled by the drafting group on Registration.

5.1

S2-001508

Motorola

Serving CSCF Selection Registration Flows













Handled by the drafting group on Registration.

5.1

S2-001542

AT&T

Registration functionality













Handled by the drafting group on Registration.

5.1

S2-001547

Drafting group

Output of the drafting on registration













Noted. The result is proposed to be incorporated in 23.228 as shown in S2-001616.

5.1

S2-001616

AT&T

Text for 23.228 from drafting session on S-CSCF Selection













Editorially revised to S2-001635.




S2-001635

SA2

Text for 23.228 from drafting session on S-CSCF Selection













Approved.

5.1

S2-001606

Ericsson, Motorola, Lucent, AT&T

Registration procedures













Revised to S2-001610.

5.1

S2-001610

Ericsson

Registration procedures













Editorially revised to S2-001618. The text has to be moved in the main body of 23.228 in S2-001618.

5.1

S2-001618

Ericsson

Registration procedures













Approved.

5.1

S2-001453

Lucent

Registration/Deregistration Information Flows













Not Approved. More contributions are needed on de-registration before a conclusion can be taken. Contributions are invited on this topic at next meeting.

5.1

S2-001464

Ericsson, Nokia, Vodafone

Clarification of HSS Role in SIP Registration procedure













Not approved. The flows need to be elaborated first: the text leads to endless discussions.

5.2

S2-001484

AT&T

Template for call flows













Approved. Used to be decided on a case by case basis.

5.2

S2-001316

Lucent

Revised Information Flow Template













Encompassed by the previous document.

5.2

S2-001436

Telia

Ungraceful session termination in the IM domain













The requirements are expressed in S2-001602, and a LS to N1 is proposed in S2-001603.

5.2

S2-001602

Telia

Requirement for handling ungraceful session termination in the IM domain













Approved.

5.2

S2-001603

Telia
















For e-mail approval.

5.2

S2-001509

Motorola

Roles of CSCF and SIP versions













No version number of SIP should be defined by S2.

Concerning the roles, it was said that the flows have to be provided first, and then the exact wording can be found. But the OK with the rough lines.



To be revised to S2-001604.

5.2

S2-001312

Ericsson

Introduction of functional elements from 23.821 into 23.002

23.002

020

B

R00

For e-mail approval.

5.2

S2-001604

Motorola
















For e-mail approval.










The drafting session on Call flows will be in parallel with the plenary, and it will focus on the first Invite flow
















5.2

S2-001456

Siemens

Mobile Terminated Call Routing between IMS and CS













See conclusion on S2-001396, presenting another solution to the same problem.

5.2

S2-001396

Alcatel

Routing (CS/PS) of incoming calls

23.228







R00

None of these 2 contributions are approved. More discussions are needed.

5.2

S2-001490

Nokia

A definition on signalling PDP context

23.060

179

B

R00

Not approved.

5.2

S2-001394

Alcatel

External IP Call Termination Points

23.228







R00

For Call flow drafting group.

5.2

S2-001443

BT
















For Call flow drafting group.

5.2

S2-001444

BT
















For Call flow drafting group.

5.2

S2-001448

Marconi

Mobile Originated SIP based Call Flows













For Call flow drafting group.

5.2

S2-001454

Lucent

Mobile Origination Information Flows













For Call flow drafting group.

5.2

S2-001455

Lucent

Mobile Termination Information Flows













For Call flow drafting group.

5.2

S2-001466

Ericsson

- not provided -













For Call flow drafting group.

5.2

S2-001468

Ericsson

- not provided -













For Call flow drafting group.

5.2

S2-001504

Nortel

- not provided -













For Call flow drafting group.

5.2

S2-001510

Motorola

- not provided -













For Call flow drafting group.




S2-001546

3Com

Registration call flows













Handled by Call Flow drafting group.

5.2

S2-001449

AT&T

Call Flow Definitions













For Call flow drafting group.

5.2

S2-001621

AT&T

Call Flows
















5.2

S2-001481

AT&T

Annex X1 of 23.228 (Editorial update)













For Call flow drafting group.

5.2

S2-001620

AT&T

Annex B.1 update



















S2-001636

Drafting group on Call Flows

Result of the drafting on call flows.













For e-mail approval. 15th of September


5

S2-001437

Siemens

CSCF Availability during the SIP Session













Revised to S2-001632 to keep only the requirements.




S2-001632

Siemens

CSCF Availability during the SIP Session













For e-mail approval.

5.2

S2-001474

Nokia

Role of the proxy CSCF after the registration procedure













Editorially revised to S2-001633




S2-001633

Nokia

Role of the proxy CSCF after the registration procedure













Approved.




S2-001611

Siemens, Mannesmann

Multimedia messaging architecture













Proposed LS to T2 in S2-001631.




S2-001631

Mannesmann
















For e-mail approval.

5.2

S2-001467

Ericsson

ENUM and TRIP protocols in 3GPP R’00













Not approved. Ericsson can come back with a contribution on how to bring these protocols in the architecture.

5.3

S2-001601

Nokia

Release 2000 Specific Ipv4/Ipv6 Transition Scenarios













See conclusion in next tdoc.

5.3

S2-001493

Motorola

Ipv4/Ipv6 Interworking Scenarios













Not approved and S2-001601 neither. More time is allowed for Nokia and Motorola to try to align their views.

5.3

S2-001494

Motorola

IP Address Management













Revised to S2-001643.

5.3

S2-001643

Motorola

IP Address Management













For e-mail approval.

5

S2-001356

Hughes network systems

Proposal for V.44 Data Compression in SNDCP













Not approved.

5

S2-001357

Hughes network systems

Proposal for V.44 Data Compression in PDCP













Not approved.

6 OSA

S2-001358

VHE/OSA ad-hoc

Group


Minutes of the VHE/OSA Drafting Meeting of Montreal (August)













Approved. It asks for approval of the three following LSs (S2-001359, 1360 and 1361).

6 OSA

S2-001359

VHE/OSA ad-hoc

Group


Proposed LS to S1 and N5 on terminology in OSA specifications













Editorially revised to S2-001639

6

S2-001639

SA2

LS to S1 (Cc N5) on terminology in OSA specifications













Approved.

6 OSA

S2-001360

VHE/OSA ad-hoc

Group


Proposed LS to S1 and N5 on work split between SA 1, SA 2 and CN 5













Approved.

6 OSA

S2-001361

VHE/OSA ad-hoc

Group


Reply LS to S1 ( Cc T2-1, N2, WAP WAG Sync, T3, S3) on Support of VHE User Profiles













Approved.

6 OSA

S2-001623

OSA

Minutes of the OSA drafting group of Bristol

23.127










Approved. This report asks for approval of the following tdocs: S2-001548, S2-001619, S2-001605, S2-001634, S2-001624, S2-001625, S2-001626, S2-001627, S2-001628, S2-001629, S2-001630

6 OSA

S2-001548

OSA drafting

Support of services for roaming users













Approved.

6 OSA

S2-001605

OSA drafting

Service Control Interface Protocols













Approved.

6

S2-001619

OSA drafting

Support of services for roaming users (2)













Approved.

6 OSA

S2-001634

Ericsson

Change of TS 23.127 title for version 4.0 and up

23.127

011r1

D

R00

Approved.

6 OSA

S2-001624

Siemens

CR on Parlay-OSA alignment: basic service interface

23.127

012

F

R99

Approved.

6 OSA

S2-001625

Siemens

CR on Parlay-OSA alignment: initial contact interfaces

23.127

013

F

R99

Approved.

6 OSA

S2-001626

Siemens

CR on Parlay-OSA alignment : access SCF

23.127

014

F

R99

Approved.

6 OSA

S2-001627

Siemens

CR on Parlay-OSA alignment: load manager SCF

23.127

015

F

R99

Approved.

6 OSA

S2-001628

Siemens

CR on Parlay-OSA alignment: fault manager SCF

23.127

016

F

R99

Approved.

6 OSA

S2-001629

Siemens

CR on Parlay-OSA alignment: service factory SCF

23.127

017

F

R99

Approved.

6 OSA

S2-001630

Siemens

CR on Parlay-OSA alignment: authentication interface

23.127

018

F

R99

Approved.

6 OSA

S2-001622

OSA

Discovery of local services in Visited Network

23.127










Revised to S2-001549.

6 OSA

S2-001549

Alcatel

Discovery of local services in Visited Network













Not approved. Postponed to the next OSA drafting.

6OSA

S2-001301

Lucent

Service control architecture













Handled by OSA drafting group.

6OSA

S2-001302

Lucent

Service flow list













Handled by OSA drafting group.

3

S2-001380

S1-000567

LS to VHE/OSA on Support of VHE User Profiles













Handled by OSA drafting group.

3

S2-001429

T3-000435

LS to S2 VHE/OSA on Support of Bookmarks / VHE User Profiles













Handled by OSA drafting group.

6OSA

S2-001479

Ericsson

Change of TS 23.127 title for version 4.0 and up

23.127

011

D

R01

Handled by OSA drafting group.

6OSA

S2-001480

Ericsson

OSA stage 1 requirements to be addressed by S2













Handled by OSA drafting group.

6OSA

S2-001492

Motorola

- not provided -













Handled by OSA drafting group.

5.3

S2-001366

Ericsson

23.226 Global Text telephony, Stage 2

23.226










Noted.

5.3

S2-001367

Ericsson

Global Text Telephony status and planning

23.226










23.226 cannot be raised to v.1.0. Companies are invited to contribute on the issue.

5.3

S2-001368

Ericsson

22.226 Global Text telephony Stage 1

22.226










Noted.




S2-001653

Ericsson

LS on Cellular Text telephone Modem approval from T1P1.3













Not handled.

5.3

S2-001495

Motorola

Push Service

23.874













5.3

S2-001496

Motorola

Push Service Considerations

23.874
















S2-001647

NTT

Current status and work plan for the feasibility study of an architecture for push service













Approved in principle, but the version of the TR will depend of the content of the TR itself.




S2-001649

NTT

23.874 v.0.0.3 on Push services

23.874










Raised in v.1 in S2-001659.




S2-001659

NTT

23.874 v.1.0.0 on Push services

23.874










Approved. To be presented to SA#9.




S2-001648

NTT

Proposed change to WI: A feasibility study of an architecture for network requested PDP context activation with User-ID













Revised to S2-001660.




S2-001660

NTT

Proposed change to WI: A feasibility study of an architecture for network requested PDP context activation with User-ID













Approved. To be presented to SA#9.




S2-001565

QoS Convenor

Minutes of the drafting meeting on QoS













Noted. See individual conclusions bellow.




S2-001565

QoS convenor

Minutes of QoS drafting
















6QoS 3

S2-001379

S1-000503

LS on Service Modification without Pre-Notification













For QoS drafting group: handled together with next document.

3

S2-001410

N3-000278

LS on Service Modification without pre-notification













Proposed answer in S2-001518.

3

S2-001518

Nokia

LS response to S1, N3 on Service Modification without pre-notification”













Approved.

3

S2-001389

R3-001963

LS on RAB Assignment QoS Negotiation













Handled together with next LS. Handled by QoS drafting group.

3

S2-001383

S1-000611

LS on Applications on external devices (response to Tdoc SP-00353)













Handled with S2-001505. T2 has answered (we’re missing they reply). The original SA LS has also to be found out.

3

S2-001503

Nortel

Related to LS in 1383













Not handled.

3

S2-001505

Nortel

Related to LS in 1389













Proposed answer to S2-001389 and 1383 (taking into account this tdoc) in S2-001551. Handled by QoS drafting group.




S2-001551

QoS related
















Editorially revised to S2-001651.




S2-001651

SA2

LS













For e-mail approval.

3

S2-001417

S5-000353

LS on 2G/3G QoS profiles













Proposed answer in S2-001566. Handled by QoS drafting group.




S2-001566

SA2

LS answer to S2-001566













Approved.




S2-001550

Ericsson

QoS End-to-End Functional Architecture

23.107







R00

Revised to S2-001560. For QoS drafting.




S2-001560

Ericsson

QoS End-to-End Functional Architecture

23.107







R00

Revised to S2-001561.




S2-001561

QoS drafting

QoS End-to-End Functional Architecture

23.107

023r1

B

R00

Not approved: no need yet to raise 23.107 to v.4.




S2-001561

Ericsson

QoS End-to-End Functional Architecture

23.107

023r1




R00

S2 approved the CR from a technical point of view (excluding the technical notes). However, it cannot be approved officially because it is adding too many editorial notes: once a document is in version 3 or above, it cannot contain so many unstable sections as proposed here.

Companies are asked to contribute on the basis of this CR: the S2 intention is to solve all the editorial notes as soon as possible so that the CR can be officially approved.


All the CRs on R00 are not approved, because there is no need to create a Release 2000 version right now because CR023r1 was not approved.

6QoS

S2-001497

Motorola

Attribute and parameter terminology

23.107

026




R99

Revised to S2-001553. Handled by QoS drafting group.: revised to S2-001553.

6qos

S2-001553

Motorola

Attribute and parameter

23.107

026r1




R99

Revised to S2-001562 (CR for R99) and S2-001554 (CR for R00). For QoS drafting group

6qos

S2-001562

Motorola

Attribute and parameter

23.107

026r2




R99

Approved.

6qos

S2-001554

Motorola

Attribute and parameter

23.107

032




R00

Not approved: no need yet to raise 23.107 to v.4.

6QoS

S2-001498

Motorola

Informational content on clause 6.2

23.107

027




R99

Handled by QoS drafting group.

6qos

S2-001555

Motorola

Informational content in clause 6.2

23.107

027r1




R99

Approved.

6qos

S2-001556

Motorola

Informational content in clause 6.2

23.107

031




R00

Not approved: no need yet to raise 23.107 to v.4.

6QoS

S2-001499

Motorola

Requirements clarifications

23.107

028




R99

Revised to S2-001557. Handled by QoS drafting group.

6qos

S2-001557

Motorola

Requirements clarifications













For e-mail approval.

6QoS

S2-001500

Motorola

Traffic class editorial corrections

23.107

029




R99

Revised to S2-001559. Handled by QoS drafting group.

6qos

S2-001559

Motorola

Traffic class editorial corrections

23.107

029r1




R99

Revised to S2-001563 (R99)and S2-001564 (R00)

6qos

S2-001563

Motorola

Traffic class editorial corrections

23.107

029r2




R99

Approved.

6qos

S2-001564

Motorola

Traffic class editorial corrections

23.107

030




R00

Not approved: no need yet to raise 23.107 to v.4.




S2-001303

Lucent

SIP with QoS













Noted by QoS drafting.

6QoS

S2-001365

Nokia

End-to-End QoS Notifications between UE and GGSN

23.107

025

B

R00

Not approved. Handled by QoS drafting group.

6QoS

S2-001370

Fujitsu

Introduction of packet delay variation













Not Approved. Handled by QoS drafting group.

6QoS

S2-001446

Ericsson

Resource manager













Not approved. Handled by QoS drafting group.

6QoS

S2-001447

Ericsson

QoS End-to-End Functional Architecture (that is an update of CR23 to 23.107)













Handled by QoS drafting group.

6QoS

S2-001511

Motorola

Streaming delay













Noted. Handled by QoS drafting group.

6qos

S2-001539

AT&T

QoS optionality













Not approved. Handled by QoS drafting group.




S2-001552

QoS related






















S2-001558

QoS related






















S2-001567

- 1567 to 1599: not allocated -



















3

S2-001441

S1-000679 (not yet approved)

LS to RAN2 (Cc S2) regarding Open Interfaces within the UTRAN for LCS Support













Handled by LCS drafting group.

3

S2-001470

S1-000680 (not agreed yet)

LS to TSG-GERAN regarding Open Interfaces within the GERAN for LCS Support













Handled by LCS drafting group.




S2-001645

LCS convenor

Meeting report of the S2 LCS drafting session 7.9.2000













Noted. See individual conclusions on the tdocs handled by this drafting.




S2-001646

LCS

LS to R2 (Cc S1, R3) regarding an open interface between the SMLC and the SRNC within the UTRAN for LCS Support













For e-mail approval.

To be approved by e-mail by 18th September because some companies had already left the meeting when the LS was presented!

This process is accepted as an exceptional case.





S2-001644

Nokia

Communication between the core and access networks

23.171

?







Editorially revised to S2-001656.




S2-001656

Nokia

Communication between the core and access networks

23.171

004

D

R99

Approved.




S2-001657

Editor




23.271










For e-mail approval. To be presented to SA in version 1. To be sent by e-mail on 11th, deadline for comment 15th.

6 LCS

S2-001354

Siemens

Alignment of Geographic Shape Description with ITU-T and ANSI

03.32

A007

F

R98

Handled by LCS drafting group.

6 LCS

S2-001355

Siemens

Alignment of Geographic Shape Description with ITU-T and ANSI

23.032

002

F

R99

Handled by LCS drafting group.

6LCS

S2-001376

Editor (Nokia)

Functional stage 2 description of LCS

23.271 v. 0.1.0










Handled by LCS drafting group.

6LCS

S2-001440

Qualcomm

The support of an open interface to the SMLC within the 3GPP UTRAN LCS

Specifications















Handled by LCS drafting group.

6QoS

S2-001445

Ericsson

IP Specific Elements in PDP Context Activation/Modification













Handled by QoS drafting group.

6LCS

S2-001471

Nokia

Editorial changes to 23.271













Handled by LCS drafting group.

6LCS

S2-001472

Nokia

On changes in PS LCS













Handled by LCS drafting group.

6LCS

S2-001473

Nokia

Moving Iu description from 23.171 to 25.305

23.171

003




R99

Handled by LCS drafting group.

6LCS

S2-001486

Fujitsu

- not provided -













Handled by LCS drafting group.

6LCS

S2-001487

Fujitsu

- not provided -













Handled by LCS drafting group.

6LCS

S2-001488

Fujitsu

- not provided -













Handled by LCS drafting group.

6LCS

S2-001489

Fujitsu

- not provided -













Handled by LCS drafting group.

6LCS

S2-001501

NTT DoCoMo

Proposed Work schedule for Location Service













Handled by LCS drafting group. Taken into account in the revised version of the work plan.

6LCS

S2-001617

Nokia

LCS agenda













Handled by LCS drafting group.

6split

S2-001377

WI rapporteur (Ericsson)

Minutes of Split Architecture Drafting in Stockholm

23.873










For SGSN split drafting group.




S2-001640

Drafting on Split GSN

Minutes of the drafting group













Revised to S2-001655.

Previous version of 23.873 is in S2-001378.



The next ad-hoc meeting is proposed to take place in Vancouver, hosted by Motorola, 17th to 19th of October.




S2-001655

Split archi convenor
















Approved (to be sent by e-mail).

6split

S2-001378

WI rapporteur (Ericsson)

TR 23.873 v0.1.0

23.873 v0.1.0










Approved.




S2-001652

Editor

23.873 v.0.2.0













To be sent by e-mail before 12th and approved by 15th.

7

S2-001352

MCC

Work Plan v. Aug. 25



















S2-001650

NTT

Invitation for S2#15













Noted.

5.3

S2-001450

Lucent

Term to describe RAN+SGSN+GGSN













For e-mail approval.




S2-001642

MCC

Other term to refer to RAN+SGSN+GGSN













For e-mail approval.

5.3

S2-001399

Alcatel

Removal of unnecessary features of Cx interface

23.228







R00

For e-mail approval.

WI

S2-001401

Alcatel

Impacts of SGSN split










R0x




5.3

S2-001402

Alcatel




23.228







R00




5

S2-001404

Alcatel

Iu user plane in the CS core network













For e-mail approval.

5

S2-001451

Lucent

TS 23.228 V0.1.0 IM Subsystem Stage 2
















5.1

S2-001461

Ericsson

Architectural Principles for Release 2000

23.121




B

R00




5.3

S2-001475

Nokia

Introducing flexibility to the Iu interface













For e-mail approval.

5.3

S2-001483

AT&T

Proxy CSCF reassignement













For e-mail approval.

7

S2-001502

Lucent

Title of 23.121

23.121










For e-mail approval.




S2-001544

3Com

Removing Proxy CSCF from signalling path













For e-mail approval.




S2-001545

3Com

CSCF definitions













For e-mail approval.

5.2

S2-001600

Ericsson

Single MS ISDN
















4

S2-001363

Vodafone

Withdrawn

23.060

171

?

?

Revised to S2-001523

4

S2-001364

Vodafone

Withdrawn

23.060

172

?

?

Revised to S2-001524




S2-001369

Korea Telecom

Withdrawn
















5.3

S2-001395

Alcatel

Local service

23.228







R00

Withdrawn

5.3

S2-001403

Alcatel

Use of Firewall CSCFs (role of I-CSCF)

23.228







R00

Handled by drafting.

3

S2-001421

N4-000549

LS on Architectural Impact of Combined MAP Signaling for Mobility Management













Withdrawn.

4

S2-001477

Alcatel

Correction to Data Retrieve protocol stacks endpoints

23.121

059




R99

Replaced by 1512

5.3

S2-001478

Alcatel

Correction to Data Retrieve protocol stacks endpoints

23.121

060




R00

Replaced by 1513




S2-001506

Siemens

Withdrawn
















5.1

S2-001507

Motorola

Withdrawn, replaced by 1541
















Yüklə 2,33 Mb.

Dostları ilə paylaş:
1   ...   55   56   57   58   59   60   61   62   63




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©muhaz.org 2024
rəhbərliyinə müraciət

gir | qeydiyyatdan keç
    Ana səhifə


yükləyin