Ag. Item
|
Tdoc #
|
Source
|
Title
|
Spec
|
CR #
|
cat
|
Rel
|
Conclusion
|
6OSA
|
S2-001301
|
Lucent
|
Service control architecture
|
|
|
|
|
Handled by OSA drafting group.
|
6OSA
|
S2-001302
|
Lucent
|
Service flow list
|
|
|
|
|
Handled by OSA drafting group.
|
|
S2-001303
|
Lucent
|
SIP with QoS
|
|
|
|
|
Noted by QoS drafting.
|
5.2
|
S2-001312
|
Ericsson
|
Introduction of functional elements from 23.821 into 23.002
|
23.002
|
020
|
B
|
R00
|
For e-mail approval.
|
5.2
|
S2-001316
|
Lucent
|
Revised Information Flow Template
|
|
|
|
|
Encompassed by the previous document.
|
1
|
S2-001350
|
Chairman
|
Agenda
|
|
|
|
|
Approved.
|
1
|
S2-001351
|
MCC
|
Minutes of S2’s drafting meeting in Vancouver
|
|
|
|
|
Noted (already approved by e-mail).
|
7
|
S2-001352
|
MCC
|
Work Plan v. Aug. 25
|
|
|
|
|
Noted.
|
4
|
S2-001353
|
Alcatel/CN2
|
Detailed on Camel interworking with SGSN (SGSN CAMEL procedures)
|
23.060
|
169
|
F
|
R99
|
Editorially revised to S2-001530.
|
6 LCS
|
S2-001354
|
Siemens
|
Alignment of Geographic Shape Description with ITU-T and ANSI
|
03.32
|
A007
|
F
|
R98
|
Handled by LCS drafting group.
|
6 LCS
|
S2-001355
|
Siemens
|
Alignment of Geographic Shape Description with ITU-T and ANSI
|
23.032
|
002
|
F
|
R99
|
Handled by LCS drafting group.
|
5
|
S2-001356
|
Hughes network systems
|
Proposal for V.44 Data Compression in SNDCP
|
|
|
|
|
Not approved.
|
5
|
S2-001357
|
Hughes network systems
|
Proposal for V.44 Data Compression in PDCP
|
|
|
|
|
Not approved.
|
6 OSA
|
S2-001358
|
VHE/OSA ad-hoc
Group
|
Minutes of the VHE/OSA Drafting Meeting of Montreal (August)
|
|
|
|
|
Approved. It asks for approval of the three following LSs (S2-001359, 1360 and 1361).
|
6 OSA
|
S2-001359
|
VHE/OSA ad-hoc
Group
|
Proposed LS to S1 and N5 on terminology in OSA specifications
|
|
|
|
|
Editorially revised to S2-001639
|
6 OSA
|
S2-001360
|
VHE/OSA ad-hoc
Group
|
Proposed LS to S1 and N5 on work split between SA 1, SA 2 and CN 5
|
|
|
|
|
Approved.
|
6 OSA
|
S2-001361
|
VHE/OSA ad-hoc
Group
|
Reply LS to S1 ( Cc T2-1, N2, WAP WAG Sync, T3, S3) on Support of VHE User Profiles
|
|
|
|
|
Approved.
|
4
|
S2-001362
|
Vodafone
|
DTM: simultaneous LAU and RAU procedures on an SDCCH
|
23.060
|
170
|
F
|
R99
|
Approved.
|
4
|
S2-001363
|
Vodafone
|
Withdrawn
|
23.060
|
171
|
?
|
?
|
Revised to S2-001523
|
4
|
S2-001364
|
Vodafone
|
Withdrawn
|
23.060
|
172
|
?
|
?
|
Revised to S2-001524
|
6QoS
|
S2-001365
|
Nokia
|
End-to-End QoS Notifications between UE and GGSN
|
23.107
|
025
|
B
|
R00
|
Not approved. Handled by QoS drafting group.
|
5.3
|
S2-001366
|
Ericsson
|
23.226 Global Text telephony, Stage 2
|
23.226
|
|
|
|
Noted.
|
5.3
|
S2-001367
|
Ericsson
|
Global Text Telephony status and planning
|
23.226
|
|
|
|
23.226 cannot be raised to v.1.0. Companies are invited to contribute on the issue.
|
5.3
|
S2-001368
|
Ericsson
|
22.226 Global Text telephony Stage 1
|
22.226
|
|
|
|
Noted.
|
|
S2-001369
|
Korea Telecom
|
Withdrawn
|
|
|
|
|
|
6QoS
|
S2-001370
|
Fujitsu
|
Introduction of packet delay variation
|
|
|
|
|
Not Approved. Handled by QoS drafting group.
|
4
|
S2-001371
|
Ericsson
|
CS Paging procedure in UMTS
|
23.060
|
173
|
F
|
R99
|
Approved.
|
4
|
S2-001372
|
Ericsson
|
Clarification on P-TMSI and P-TMSI signature at Detach
|
23.060
|
174
|
F
|
R99
|
Approved.
|
4
|
S2-001373
|
Ericsson
|
Serving RNS Relocation Procedure
|
23.060
|
175
|
F
|
R99
|
Editorially revised to S2-001532.
|
4
|
S2-001374
|
Ericsson
|
DRX and MS network capabilities within UMTS
|
23.060
|
176
|
F
|
R99
|
Editorially revised to S2-001533
|
2
|
S2-001375
|
Vice Chairman
|
Status of S2 E-mail approval between S2#13 and S2#14
|
|
|
|
|
Alcatel sent some comments on CSCF discovery, but too late (after the deadline).
S2-001252, 1259 and 1261 were supposed to be approved by e-mail, but they are asked to be approved now: to be approved by Wednesday if no objection is made.
|
6LCS
|
S2-001376
|
Editor (Nokia)
|
Functional stage 2 description of LCS
|
23.271 v. 0.1.0
|
|
|
|
Handled by LCS drafting group.
|
6split
|
S2-001377
|
WI rapporteur (Ericsson)
|
Minutes of Split Architecture Drafting in Stockholm
|
23.873
|
|
|
|
For SGSN split drafting group.
|
6split
|
S2-001378
|
WI rapporteur (Ericsson)
|
TR 23.873 v0.1.0
|
23.873 v0.1.0
|
|
|
|
Approved.
|
6QoS 3
|
S2-001379
|
S1-000503
|
LS on Service Modification without Pre-Notification
|
|
|
|
|
For QoS drafting group: handled together with next document.
|
3
|
S2-001380
|
S1-000567
|
LS to VHE/OSA on Support of VHE User Profiles
|
|
|
|
|
Handled by OSA drafting group.
|
3
|
S2-001381
|
S1-000616
|
LS on Response to comments on TR22.976 (v1.4.0)
|
|
|
|
|
Noted.
|
3
|
S2-001382
|
S1-000609
|
LS Cc S2 on “Priority of ME resources for WAP and SIM toolkit applications”
|
|
|
|
|
Noted.
|
3
|
S2-001383
|
S1-000611
|
LS on Applications on external devices (response to Tdoc SP-00353)
|
|
|
|
|
Handled with S2-001505. T2 has answered (we’re missing they reply). The original SA LS has also to be found out.
|
3
|
S2-001384
|
N4-000520
|
Response LS on Terminology of TrFO/TFO and possible interworking scenarios
|
|
|
|
|
Proposed answer in S2-001662.
|
3
|
S2-001385
|
N4-000507
|
LS on appointment of people to maintain liaison with IGC
|
|
|
|
|
Noted.
|
3
|
S2-001386
|
N4-000549
|
LS on Architectural Impact of Combined MAP Signaling for Mobility Management
|
|
|
|
|
An answer is generated based on these inputs in S2-001608.
|
3
|
S2-001387
|
N4-000515
|
LS (Cc S2) on request for response to N4 LS (N4-000340)
|
|
|
|
|
S2’s chairman has to contact N1’s chairman to check if S2 is still requested to perform some actions.
|
3
|
S2-001388
|
N2-000344
|
LS on IPT Basic Call Handling
|
|
|
|
|
Proposed answer in S2-001515.
|
3
|
S2-001389
|
R3-001963
|
LS on RAB Assignment QoS Negotiation
|
|
|
|
|
Handled together with next LS. Handled by QoS drafting group.
|
3
|
S2-001390
|
R3-001998
|
LS response on support of AMR via Iu-ps in GERAN
|
|
|
|
|
An answer will be provided in S2-001516.
|
3
|
S2-001391
|
R2-001533
|
LS response (R3-001581) on SRNS Relocation of RT RABs and interaction with PDCP
|
|
|
|
|
Noted.
|
3
|
S2-001392
|
R1- 000765
|
LS on ‘Proposed changes to 3GPP Release 2000 work plan’
|
|
|
|
|
To be included in the next version of the Work Plan by IGC convenor or by MCC.
|
3
|
S2-001393
|
N2-000194
|
LS on Proposed updates to Work Plan Version 1.0 relating to CAMEL Phase 4 work item
|
|
|
|
|
To be included in the next version of the Work Plan by IGC convenor or by MCC.
|
5.2
|
S2-001394
|
Alcatel
|
External IP Call Termination Points
|
23.228
|
|
|
R00
|
For Call flow drafting group.
|
5.3
|
S2-001395
|
Alcatel
|
Local service
|
23.228
|
|
|
R00
|
Withdrawn
|
5.2
|
S2-001396
|
Alcatel
|
Routing (CS/PS) of incoming calls
|
23.228
|
|
|
R00
|
None of these 2 contributions are approved. More discussions are needed.
|
5
|
S2-001397
|
Alcatel
|
Use of Iur and Iu-ps interfaces – Handovers
|
|
|
|
R00
|
Proposed answer to S2-001609 in S2-001613. To be decided later on, based on its content, whether it has to be sent or not.
For the other questions of S2-001609, a drafting group is established.
|
5
|
S2-001398
|
Alcatel
|
Handover and RAN Relocation for the GERAN (companion of S2-001397)
|
23.121
|
058
|
|
R00
|
Withdrawn, due to the lack of agreement on S2-001397.
|
5.3
|
S2-001399
|
Alcatel
|
Removal of unnecessary features of Cx interface
|
23.228
|
|
|
R00
|
For e-mail approval.
|
5.1
|
S2-001400
|
Alcatel
|
P-CSCF discovery
|
23.228
|
|
|
R00
|
Not approved: the conclusion is still to use DHCP, as agreed in Vancouver.
|
WI
|
S2-001401
|
Alcatel
|
Impacts of SGSN split
|
|
|
|
R0x
|
|
5.3
|
S2-001402
|
Alcatel
|
|
23.228
|
|
|
R00
|
|
5.3
|
S2-001403
|
Alcatel
|
Use of Firewall CSCFs (role of I-CSCF)
|
23.228
|
|
|
R00
|
Handled by drafting.
|
5
|
S2-001404
|
Alcatel
|
Iu user plane in the CS core network
|
|
|
|
|
For e-mail approval.
|
3
|
S2-001405
|
N1-000639
|
LS to R3 (Cc S2) on including the SAI into the Gs-i/f BSSAP+-LOCATION-UPDATE-REQUEST message as requested in N1-000543
|
|
|
|
|
Noted.
|
3
|
S2-001406
|
N1-000758
|
LS on Removal of Service Accept
|
|
|
|
|
Obsolete: the CR 184 in S2-001638 is already the compromise solution found at last N1 meeting.
|
3
|
S2-001407
|
N1-000712
|
LS on Terminal capability negotiation including codecs (reply)
|
|
|
|
|
Noted.
|
3
|
S2-001408
|
N1-000713
|
LS response on hexadecimal IMEI format
|
|
|
|
|
Noted.
|
3
|
S2-001409
|
N1-000793
|
LS to S2 on 23.060 CR “Change of the Cell update procedure”
|
23.060
|
147r1
|
F
|
R99
|
Approved (after checking that it is possible to include it as such in v.3.4).
|
3
|
S2-001410
|
N3-000278
|
LS on Service Modification without pre-notification
|
|
|
|
|
Proposed answer in S2-001518.
|
3
|
S2-001411
|
R3-001578
|
LS on Progress of Real-Time PS Domain SRNS Relocation
|
|
|
|
|
Proposed answer in S2-001519.
|
3
|
S2-001412
|
R3-001581
|
LS to R2 and S2 on Relocation interaction with PDCP
|
|
|
|
|
Noted.
|
3
|
S2-001413
|
R3001649
|
LS Response on hexadecimal IMEI format
|
|
|
|
|
Noted: S1 accepts these changes in S2-001408.
|
3
|
S2-001414
|
SMG9-00262
|
LS on Priority of ME resources for WAP and SIM toolkit applications
|
|
|
|
|
Noted.
|
3
|
S2-001415
|
S5-000320
|
LS on Protocol Choice for Layer I of MAP Security
|
|
|
|
|
Noted.
|
3
|
S2-001416
|
S5-000322
|
LS on Service Management – New R00 work item proposal under SA5’s responsibility
|
|
|
|
|
Not approved.
|
3
|
S2-001417
|
S5-000353
|
LS on 2G/3G QoS profiles
|
|
|
|
|
Proposed answer in S2-001566. Handled by QoS drafting group.
|
3
|
S2-001418
|
S3-000478
|
LS to S2 on use of IP for security key distribution
|
|
|
|
|
Noted. To be kept in mind when further progressing the work.
|
3
|
S2-001419
|
T2M000089
|
LS on VHE/OSA presentation
|
|
|
|
|
Too late.
|
3
|
S2-001420
|
T2M000090
|
LS on Terminal Capability Negotiation
|
|
|
|
|
Noted.
|
3
|
S2-001421
|
N4-000549
|
LS on Architectural Impact of Combined MAP Signaling for Mobility Management
|
|
|
|
|
Withdrawn.
|
3
|
S2-001422
|
S1-000651
|
LS on Re-establish Capability for Emergency call
|
|
|
|
|
Proposed answer in S2-001520.
|
3
|
S2-001423
|
S1-000658
|
LS (Cc S2) on Guidance on future work for T2 SWG5, Multi-mode terminals
|
|
|
|
|
Noted.
|
3
|
S2-001424
|
R2-001859
|
LS on Corrections to relocation procedures in 23.060
|
23.060
|
|
F
|
R99
|
Revised CR in S2-001521.
Proposed LS back in S2-001522.
|
3
|
S2-001425
|
R2-001817
|
LS response to R3-002198 on Directed signalling connection re-establishment at RRC
|
|
|
|
|
Proposed answer in S2-001527.
|
3
|
S2-001426
|
R2-001865
|
LS response to S2-001053 on “Two phase resource reservation”
|
|
|
|
|
Noted.
|
3
|
S2-001427
|
R2-001868
|
LS (Cc S2) on Answer to Proposal of exchange of the terms “in GSM” and “in UMTS”
|
|
|
|
|
Noted.
|
3
|
S2-001428
|
R2-001870
|
LS on Failure during SRNS Relocation
|
|
|
|
|
Proposed answer in S2-001529.
|
3
|
S2-001429
|
T3-000435
|
LS to S2 VHE/OSA on Support of Bookmarks / VHE User Profiles
|
|
|
|
|
Handled by OSA drafting group.
|
3
|
S2-001430
|
T3-000470
|
LS on Clarification of UMTS-AKA for GSM R’99 Mobiles
|
|
|
|
|
Noted.
|
3
|
S2-001431
|
Tiphon
|
Presentation of Tiphon
|
|
|
|
|
Noted.
|
3
|
S2-001432
|
Tip 19TD129
|
LS on TIPHON architecture document
|
|
|
|
|
Noted.
|
3
|
S2-001433
|
Tiphon
|
Document DTS-02003v0.10.10
|
|
|
|
|
Noted.
|
3
|
S2-001434
|
N1-000997
|
LS on Answer to Proposal of exchange of the terms “in GSM“ and “in UMTS“
|
|
|
|
|
Accepted. A proposed answer is provided in S2-001528.
|
3
|
S2-001435
|
N1-001023
|
LS on the introduction of GEA2.
|
|
|
|
|
Approved. The editor should check that this decision does not impact 03.60 and 23.060.
|
5.2
|
S2-001436
|
Telia
|
Ungraceful session termination in the IM domain
|
|
|
|
|
The requirements are expressed in S2-001602, and a LS to N1 is proposed in S2-001603.
|
5
|
S2-001437
|
Siemens
|
CSCF Availability during the SIP Session
|
|
|
|
|
Revised to S2-001632 to keep only the requirements.
|
5.1
|
S2-001438
|
Siemens
|
CSCF Availability at Session Setup
|
|
|
|
|
Not approved as such.
|
4
|
S2-001439
|
Siemens
|
Compatibility GTPv0/GTPv1 in case of SGSN change
|
23.060
|
177
|
F
|
R99
|
Editorially revised to S2-001531.
|
6LCS
|
S2-001440
|
Qualcomm
|
The support of an open interface to the SMLC within the 3GPP UTRAN LCS
Specifications
|
|
|
|
|
Handled by LCS drafting group.
|
3
|
S2-001441
|
S1-000679 (not yet approved)
|
LS to RAN2 (Cc S2) regarding Open Interfaces within the UTRAN for LCS Support
|
|
|
|
|
Handled by LCS drafting group.
|
5.1
|
S2-001442
|
BT
|
Revised proposal for registration flows
|
|
|
|
|
A general conclusion will be made on all the contributions dealing with registration flow.
|
5.2
|
S2-001443
|
BT
|
|
|
|
|
|
For Call flow drafting group.
|
5.2
|
S2-001444
|
BT
|
|
|
|
|
|
For Call flow drafting group.
|
6QoS
|
S2-001445
|
Ericsson
|
IP Specific Elements in PDP Context Activation/Modification
|
|
|
|
|
Handled by QoS drafting group.
|
6QoS
|
S2-001446
|
Ericsson
|
Resource manager
|
|
|
|
|
Not approved. Handled by QoS drafting group.
|
6QoS
|
S2-001447
|
Ericsson
|
QoS End-to-End Functional Architecture (that is an update of CR23 to 23.107)
|
|
|
|
|
Handled by QoS drafting group.
|
5.2
|
S2-001448
|
Marconi
|
Mobile Originated SIP based Call Flows
|
|
|
|
|
For Call flow drafting group.
|
5.2
|
S2-001449
|
AT&T
|
Call Flow Definitions
|
|
|
|
|
For Call flow drafting group.
|
5.3
|
S2-001450
|
Lucent
|
Term to describe RAN+SGSN+GGSN
|
|
|
|
|
For e-mail approval.
|
5
|
S2-001451
|
Lucent
|
TS 23.228 V0.1.0 IM Subsystem Stage 2
|
|
|
|
|
|
5.1
|
S2-001452
|
Lucent
|
Serving CSCF Assignment
|
|
|
|
|
Handled by the drafting group on Registration.
|
5.1
|
S2-001453
|
Lucent
|
Registration/Deregistration Information Flows
|
|
|
|
|
Not Approved. Handled by the drafting group on Registration.
|
5.1
|
S2-001453
|
Lucent
|
Registration/Deregistration Information Flows
|
|
|
|
|
Not Approved. More contributions are needed on de-registration before a conclusion can be taken. Contributions are invited on this topic at next meeting.
|
5.2
|
S2-001454
|
Lucent
|
Mobile Origination Information Flows
|
|
|
|
|
For Call flow drafting group.
|
5.2
|
S2-001455
|
Lucent
|
Mobile Termination Information Flows
|
|
|
|
|
For Call flow drafting group.
|
5.2
|
S2-001456
|
Siemens
|
Mobile Terminated Call Routing between IMS and CS
|
|
|
|
|
See conclusion on S2-001396, presenting another solution to the same problem.
|
5.3
|
S2-001457
|
NTT Commware
|
Draft TR on Feasibility study on architecture for network requested PDP contextactivation with User-ID
|
23.8xx
|
|
|
|
For e-mail approval. Revised later on during this meeting.
|
4
|
S2-001458
|
NTT Commware
|
Correction on Iu Release Procedure
|
23.060
|
178
|
F
|
R99
|
Revised to S2-001607.
|
5
|
S2-001459
|
NTT Commware
|
Introduction of Integrated Serving Node
|
23.002
|
021
|
B
|
R00
|
Not approved: information for CN is expected before.
|
5.1
|
S2-001460
|
Ericsson
|
Serving CSCF Selection Function
|
|
|
|
|
Handled by the drafting group on Registration.
|
5.1
|
S2-001461
|
Ericsson
|
Architectural Principles for Release 2000
|
23.121
|
|
B
|
R00
|
|
5.1
|
S2-001462
|
Ericsson
|
Triggering the CSCF Selection Function. Home Network Control case.
|
|
|
|
|
Handled by the drafting group on Registration.
|
5.1
|
S2-001463
|
Ericsson
|
Triggering the CSCF Selection Function. Visited Network Control case.
|
|
|
|
|
Also not approved.
|
5.1
|
S2-001464
|
Ericsson, Nokia, Vodafone
|
Clarification of HSS Role in SIP Registration procedure
|
|
|
|
|
Not approved. The flows need to be elaborated first: the text leads to endless discussions.
|
5.1
|
S2-001465
|
Ericsson
|
Registration procedures
|
|
|
|
|
Handled by the drafting group on Registration.
|
5.2
|
S2-001466
|
Ericsson
|
- not provided -
|
|
|
|
|
For Call flow drafting group.
|
5.2
|
S2-001467
|
Ericsson
|
ENUM and TRIP protocols in 3GPP R’00
|
|
|
|
|
Not approved. Ericsson can come back with a contribution on how to bring these protocols in the architecture.
|
5.2
|
S2-001468
|
Ericsson
|
- not provided -
|
|
|
|
|
For Call flow drafting group.
|
5.3
|
S2-001469
|
Ericsson
|
HSS Role as VLS
|
|
|
|
|
Not approved. Some written contributions are needed on this subject.
|
3
|
S2-001470
|
S1-000680 (not agreed yet)
|
LS to TSG-GERAN regarding Open Interfaces within the GERAN for LCS Support
|
|
|
|
|
Handled by LCS drafting group.
|
6LCS
|
S2-001471
|
Nokia
|
Editorial changes to 23.271
|
|
|
|
|
Handled by LCS drafting group.
|
6LCS
|
S2-001472
|
Nokia
|
On changes in PS LCS
|
|
|
|
|
Handled by LCS drafting group.
|
6LCS
|
S2-001473
|
Nokia
|
Moving Iu description from 23.171 to 25.305
|
23.171
|
003
|
|
R99
|
Handled by LCS drafting group.
|
5.2
|
S2-001474
|
Nokia
|
Role of the proxy CSCF after the registration procedure
|
|
|
|
|
Editorially revised to S2-001633
|
5.3
|
S2-001475
|
Nokia
|
Introducing flexibility to the Iu interface
|
|
|
|
|
For e-mail approval.
|
5.1
|
S2-001476
|
Lucent
|
Registration Models
|
|
|
|
|
Not approved.
|
4
|
S2-001477
|
Alcatel
|
Correction to Data Retrieve protocol stacks endpoints
|
23.121
|
059
|
|
R99
|
Replaced by 1512
|
5.3
|
S2-001478
|
Alcatel
|
Correction to Data Retrieve protocol stacks endpoints
|
23.121
|
060
|
|
R00
|
Replaced by 1513
|
6OSA
|
S2-001479
|
Ericsson
|
Change of TS 23.127 title for version 4.0 and up
|
23.127
|
011
|
D
|
R01
|
Handled by OSA drafting group.
|
6OSA
|
S2-001480
|
Ericsson
|
OSA stage 1 requirements to be addressed by S2
|
|
|
|
|
Handled by OSA drafting group.
|
5.2
|
S2-001481
|
AT&T
|
Annex X1 of 23.228 (Editorial update)
|
|
|
|
|
For Call flow drafting group.
|
5.1
|
S2-001482
|
AT&T
|
Multiple I-CSCF
|
|
|
|
|
Revised to S2-001540, with these changes.
|
5.3
|
S2-001483
|
AT&T
|
Proxy CSCF reassignement
|
|
|
|
|
For e-mail approval.
|
5.2
|
S2-001484
|
AT&T
|
Template for call flows
|
|
|
|
|
Approved. Used to be decided on a case by case basis.
|
5
|
S2-001485
|
AT&T
|
PS domain multiple RABs Real time HO requirements
|
|
|
|
|
An LS is generated in S2-001614.
|
6LCS
|
S2-001486
|
Fujitsu
|
- not provided -
|
|
|
|
|
Handled by LCS drafting group.
|
6LCS
|
S2-001487
|
Fujitsu
|
- not provided -
|
|
|
|
|
Handled by LCS drafting group.
|
6LCS
|
S2-001488
|
Fujitsu
|
- not provided -
|
|
|
|
|
Handled by LCS drafting group.
|
6LCS
|
S2-001489
|
Fujitsu
|
- not provided -
|
|
|
|
|
Handled by LCS drafting group.
|
5.2
|
S2-001490
|
Nokia
|
A definition on signalling PDP context
|
23.060
|
179
|
B
|
R00
|
Not approved.
|
4
|
S2-001491
|
Motorola
|
IP v6 address stateless autoconfiguration
|
23.060
|
180
|
F
|
R99
|
Not approved. Later revised to S2-001543.
|
6OSA
|
S2-001492
|
Motorola
|
- not provided -
|
|
|
|
|
Handled by OSA drafting group.
|
5.3
|
S2-001493
|
Motorola
|
Ipv4/Ipv6 Interworking Scenarios
|
|
|
|
|
Not approved and S2-001601 neither. More time is allowed for Nokia and Motorola to try to align their views.
|
5.3
|
S2-001494
|
Motorola
|
IP Address Management
|
|
|
|
|
Revised to S2-001643.
|
5.3
|
S2-001495
|
Motorola
|
Push Service
|
23.874
|
|
|
|
|
5.3
|
S2-001496
|
Motorola
|
Push Service Considerations
|
23.874
|
|
|
|
|
6QoS
|
S2-001497
|
Motorola
|
Attribute and parameter terminology
|
23.107
|
026
|
|
R99
|
Revised to S2-001553. Handled by QoS drafting group.: revised to S2-001553.
|
6QoS
|
S2-001498
|
Motorola
|
Informational content on clause 6.2
|
23.107
|
027
|
|
R99
|
Handled by QoS drafting group.
|
6QoS
|
S2-001499
|
Motorola
|
Requirements clarifications
|
23.107
|
028
|
|
R99
|
Revised to S2-001557. Handled by QoS drafting group.
|
6QoS
|
S2-001500
|
Motorola
|
Traffic class editorial corrections
|
23.107
|
029
|
|
R99
|
Revised to S2-001559. Handled by QoS drafting group.
|
6LCS
|
S2-001501
|
NTT DoCoMo
|
Proposed Work schedule for Location Service
|
|
|
|
|
Handled by LCS drafting group. Taken into account in the revised version of the work plan.
|
7
|
S2-001502
|
Lucent
|
Title of 23.121
|
23.121
|
|
|
|
For e-mail approval.
|
3
|
S2-001503
|
Nortel
|
Related to LS in 1383
|
|
|
|
|
Not handled.
|
5.2
|
S2-001504
|
Nortel
|
- not provided -
|
|
|
|
|
For Call flow drafting group.
|
3
|
S2-001505
|
Nortel
|
Related to LS in 1389
|
|
|
|
|
Proposed answer to S2-001389 and 1383 (taking into account this tdoc) in S2-001551. Handled by QoS drafting group.
|
|
S2-001506
|
Siemens
|
Withdrawn
|
|
|
|
|
|
5.1
|
S2-001507
|
Motorola
|
Withdrawn, replaced by 1541
|
|
|
|
|
|
5.1
|
S2-001508
|
Motorola
|
Serving CSCF Selection Registration Flows
|
|
|
|
|
Handled by the drafting group on Registration.
|
5.2
|
S2-001509
|
Motorola
|
Roles of CSCF and SIP versions
|
|
|
|
|
No version number of SIP should be defined by S2.
Concerning the roles, it was said that the flows have to be provided first, and then the exact wording can be found. But the OK with the rough lines.
To be revised to S2-001604.
|
5.2
|
S2-001510
|
Motorola
|
- not provided -
|
|
|
|
|
For Call flow drafting group.
|
6QoS
|
S2-001511
|
Motorola
|
Streaming delay
|
|
|
|
|
Noted. Handled by QoS drafting group.
|
4
|
S2-001512
|
Alcatel
|
Correction to Data Retrieve protocol stacks endpoints
|
23.121
|
059r1
|
|
R99
|
Revised to S2-001537.
|
5.3
|
S2-001513
|
Alcatel
|
Correction to Data Retrieve protocol stacks endpoints
|
23.121
|
060r1
|
|
R00
|
Revised to S2-001538.
|
4
|
S2-001514
|
Motorola
|
Suspend at UMTS to GSM inter-system change during a CS connection
|
23.060
|
181
|
F
|
R99
|
Not approved. Revised to S2-001534.
|
3
|
S2-001515
|
BT
|
|
|
|
|
|
For e-mail approval.
|
3
|
S2-001516
|
T-Mobil (Oscar)
|
|
|
|
|
|
For e-mail approval.
|
4
|
S2-001517
|
Motorola
|
Removal of PDP type OSP:IHOSS in R99
|
23.060
|
182
|
F
|
R99
|
To be revised to S2-001536.
The corresponding CR on 03.60 is in S2-001535.
|
3
|
S2-001518
|
Nokia
|
LS response to S1, N3 on Service Modification without pre-notification”
|
|
|
|
|
Approved.
|
3
|
S2-001519
|
Nokia (Marc)
|
|
|
|
|
|
For e-mail approval.
|
3
|
S2-001520
|
Vodafone (Chris)
|
|
|
|
|
|
For e-mail approval.
|
3
|
S2-001521
|
Nokia
|
|
23.060
|
183
|
F
|
R99
|
For e-mail approval.
|
3
|
S2-001522
|
Nokia
|
|
|
|
|
|
For e-mail approval.
|
4
|
S2-001523
|
Vodafone
|
DTM: reuse of the GPRS Suspension procedure in cells with no DTM capabilities
|
23.060
|
171r1
|
F
|
R99
|
Approved.
|
4
|
S2-001524
|
Vodafone
|
DTM: download of the IMSI from the SGSN to the BSC
|
23.060
|
172r1
|
F
|
R99
|
Approved.
|
3
|
S2-001525
|
GERAN
|
LS on 23.060 Change Requests for Dual Transfer Mode
|
|
|
|
|
See conclusion on the CRs themselves in the two following tdocs.
|
|
S2-001527
|
|
Response to LS in S2-001425.
|
|
|
|
|
For e-mail approval.
|
|
S2-001528
|
Lucent
|
|
|
|
|
|
For e-mail approval.
|
|
S2-001529
|
Nokia
|
|
|
|
|
|
For e-mail approval.
|
|
S2-001530
|
Alcatel
|
Detailed on Camel interworking with SGSN (SGSN CAMEL procedures)
|
|
|
|
|
Approved.
|
|
S2-001531
|
Siemens
|
Compatibility GTPv0/GTPv1 in case of SGSN change
|
23.060
|
177r1
|
F
|
R99
|
Approved.
|
4
|
S2-001532
|
Ericsson
|
Serving RNS Relocation Procedure
|
23.060
|
175r1
|
F
|
R99
|
Approved.
|
4
|
S2-001533
|
Ericsson
|
DRX and MS network capabilities within UMTS
|
23.060
|
176r1
|
F
|
R99
|
Approved.
|
4
|
S2-001534
|
Motorola
|
Suspend at UMTS to GSM inter-system change during a CS connection
|
23.060
|
181r1
|
F
|
R99
|
For e-mail approval.
|
4
|
S2-001535
|
Motorola
|
Removal of PDP type OSP:IHOSS in R99
|
03.60
|
A188
|
F
|
R98
|
For e-mail approval.
|
4
|
S2-001536
|
Motorola
|
Removal of PDP type OSP:IHOSS in R99
|
23.060
|
182r1
|
F
|
R99
|
For e-mail approval.
|
4
|
S2-001537
|
Alcatel
|
Correction to Data Retrieve protocol stacks endpoints
|
23.121
|
059r1r1
|
|
R99
|
For e-mail approval.
|
5.3
|
S2-001538
|
Alcatel
|
Correction to Data Retrieve protocol stacks endpoints
|
23.121
|
060r2
|
|
R00
|
For e-mail approval.
|
6qos
|
S2-001539
|
AT&T
|
QoS optionality
|
|
|
|
|
Not approved. Handled by QoS drafting group.
|
5.1
|
S2-001540
|
AT&T
|
Multiple I-CSCF
|
|
|
|
|
Approved.
|
5.1
|
S2-001541
|
Motorola Inc, Nortel Networks, Siemens, Alcatel, T-Mobil
|
Serving CSCF Selection
|
|
|
|
|
Not approved. Handled by the drafting group on Registration.
|
5.1
|
S2-001542
|
AT&T
|
Registration functionality
|
|
|
|
|
Handled by the drafting group on Registration.
|
|
S2-001543
|
Motorola
|
IP v6 address stateless autoconfiguration
|
23.060
|
180r1
|
F
|
R99
|
Not handled.
|
|
S2-001544
|
3Com
|
Removing Proxy CSCF from signalling path
|
|
|
|
|
For e-mail approval.
|
|
S2-001545
|
3Com
|
CSCF definitions
|
|
|
|
|
For e-mail approval.
|
|
S2-001546
|
3Com
|
Registration call flows
|
|
|
|
|
Handled by Call Flow drafting group.
|
5.1
|
S2-001547
|
Drafting group
|
Output of the drafting on registration
|
|
|
|
|
Noted. The result is proposed to be incorporated in 23.228 as shown in S2-001616.
|
6 OSA
|
S2-001548
|
OSA drafting
|
Support of services for roaming users
|
|
|
|
|
Approved.
|
6 OSA
|
S2-001549
|
Alcatel
|
Discovery of local services in Visited Network
|
|
|
|
|
Not approved. Postponed to the next OSA drafting.
|
|
S2-001550
|
Ericsson
|
QoS End-to-End Functional Architecture
|
23.107
|
|
|
R00
|
Revised to S2-001560. For QoS drafting.
|
|
S2-001551
|
QoS related
|
|
|
|
|
|
Editorially revised to S2-001651.
|
|
S2-001552
|
QoS related
|
|
|
|
|
|
|
6qos
|
S2-001553
|
Motorola
|
Attribute and parameter
|
23.107
|
026r1
|
|
R99
|
Revised to S2-001562 (CR for R99) and S2-001554 (CR for R00). For QoS drafting group
|
6qos
|
S2-001554
|
Motorola
|
Attribute and parameter
|
23.107
|
032
|
|
R00
|
Not approved: no need yet to raise 23.107 to v.4.
|
6qos
|
S2-001555
|
Motorola
|
Informational content in clause 6.2
|
23.107
|
027r1
|
|
R99
|
Approved.
|
6qos
|
S2-001556
|
Motorola
|
Informational content in clause 6.2
|
23.107
|
031
|
|
R00
|
Not approved: no need yet to raise 23.107 to v.4.
|
6qos
|
S2-001557
|
Motorola
|
Requirements clarifications
|
|
|
|
|
For e-mail approval.
|
|
S2-001558
|
QoS related
|
|
|
|
|
|
|
6qos
|
S2-001559
|
Motorola
|
Traffic class editorial corrections
|
23.107
|
029r1
|
|
R99
|
Revised to S2-001563 (R99)and S2-001564 (R00)
|
|
S2-001560
|
Ericsson
|
QoS End-to-End Functional Architecture
|
23.107
|
|
|
R00
|
Revised to S2-001561.
|
|
S2-001561
|
QoS drafting
|
QoS End-to-End Functional Architecture
|
23.107
|
023r1
|
B
|
R00
|
Not approved: no need yet to raise 23.107 to v.4.
|
|
S2-001561
|
Ericsson
|
QoS End-to-End Functional Architecture
|
23.107
|
023r1
|
|
R00
|
S2 approved the CR from a technical point of view (excluding the technical notes). However, it cannot be approved officially because it is adding too many editorial notes: once a document is in version 3 or above, it cannot contain so many unstable sections as proposed here.
Companies are asked to contribute on the basis of this CR: the S2 intention is to solve all the editorial notes as soon as possible so that the CR can be officially approved.
All the CRs on R00 are not approved, because there is no need to create a Release 2000 version right now because CR023r1 was not approved.
|
6qos
|
S2-001562
|
Motorola
|
Attribute and parameter
|
23.107
|
026r2
|
|
R99
|
Approved.
|
6qos
|
S2-001563
|
Motorola
|
Traffic class editorial corrections
|
23.107
|
029r2
|
|
R99
|
Approved.
|
6qos
|
S2-001564
|
Motorola
|
Traffic class editorial corrections
|
23.107
|
030
|
|
R00
|
Not approved: no need yet to raise 23.107 to v.4.
|
|
S2-001565
|
QoS Convenor
|
Minutes of the drafting meeting on QoS
|
|
|
|
|
Noted. See individual conclusions bellow.
|
|
S2-001565
|
QoS convenor
|
Minutes of QoS drafting
|
|
|
|
|
|
|
S2-001566
|
SA2
|
LS answer to S2-001566
|
|
|
|
|
Approved.
|
|
S2-001567
|
- 1567 to 1599: not allocated -
|
|
|
|
|
|
|
5.2
|
S2-001600
|
Ericsson
|
Single MS ISDN
|
|
|
|
|
|
5.3
|
S2-001601
|
Nokia
|
Release 2000 Specific Ipv4/Ipv6 Transition Scenarios
|
|
|
|
|
See conclusion in next tdoc.
|
5.2
|
S2-001602
|
Telia
|
Requirement for handling ungraceful session termination in the IM domain
|
|
|
|
|
Approved.
|
5.2
|
S2-001603
|
Telia
|
|
|
|
|
|
For e-mail approval.
|
5.2
|
S2-001604
|
Motorola
|
|
|
|
|
|
For e-mail approval.
|
6 OSA
|
S2-001605
|
OSA drafting
|
Service Control Interface Protocols
|
|
|
|
|
Approved.
|
5.1
|
S2-001606
|
Ericsson, Motorola, Lucent, AT&T
|
Registration procedures
|
|
|
|
|
Revised to S2-001610.
|
4
|
S2-001607
|
NTT
|
Correction on Iu Release Procedure
|
23.060
|
178r1
|
F
|
R99
|
Approved, revised to S2-001654 because of an editorial error.
|
5
|
S2-001608
|
NTT
|
|
|
|
|
|
For e-mail approval.
|
3
|
S2-001609
|
G00-0374
|
LS on inter-BSC hard handover in GERAN for the packet switched domain
|
|
|
|
|
See conclusions of S2-001397.
|
5.1
|
S2-001610
|
Ericsson
|
Registration procedures
|
|
|
|
|
Editorially revised to S2-001618. The text has to be moved in the main body of 23.228 in S2-001618.
|
|
S2-001611
|
Siemens, Mannesmann
|
Multimedia messaging architecture
|
|
|
|
|
Proposed LS to T2 in S2-001631.
|
5
|
S2-001612
|
Vodafone
|
Initial thoughts on GERAN impacts on overall system architecture
|
|
|
|
|
LS generated on this basis in S2-001615.
|
5
|
S2-001613
|
Alcatel
|
Draft LS to GERAN (Cc R2, R3) on inter-BSC hard handover in GERAN for the packet switched domain
|
|
|
|
|
Editorially revised to S2-001637.
|
5
|
S2-001614
|
AT&T
|
|
|
|
|
|
For e-mail approval.
|
5
|
S2-001615
|
Vodafone
|
|
|
|
|
|
For e-mail approval.
|
5.1
|
S2-001616
|
AT&T
|
Text for 23.228 from drafting session on S-CSCF Selection
|
|
|
|
|
Editorially revised to S2-001635.
|
6LCS
|
S2-001617
|
Nokia
|
LCS agenda
|
|
|
|
|
Handled by LCS drafting group.
|
5.1
|
S2-001618
|
Ericsson
|
Registration procedures
|
|
|
|
|
Approved.
|
6
|
S2-001619
|
OSA drafting
|
Support of services for roaming users (2)
|
|
|
|
|
Approved.
|
5.2
|
S2-001620
|
AT&T
|
Annex B.1 update
|
|
|
|
|
|
5.2
|
S2-001621
|
AT&T
|
Call Flows
|
|
|
|
|
|
6 OSA
|
S2-001622
|
OSA
|
Discovery of local services in Visited Network
|
23.127
|
|
|
|
Revised to S2-001549.
|
6 OSA
|
S2-001623
|
OSA
|
Minutes of the OSA drafting group of Bristol
|
23.127
|
|
|
|
Approved. This report asks for approval of the following tdocs: S2-001548, S2-001619, S2-001605, S2-001634, S2-001624, S2-001625, S2-001626, S2-001627, S2-001628, S2-001629, S2-001630
|
6 OSA
|
S2-001624
|
Siemens
|
CR on Parlay-OSA alignment: basic service interface
|
23.127
|
012
|
F
|
R99
|
Approved.
|
6 OSA
|
S2-001625
|
Siemens
|
CR on Parlay-OSA alignment: initial contact interfaces
|
23.127
|
013
|
F
|
R99
|
Approved.
|
6 OSA
|
S2-001626
|
Siemens
|
CR on Parlay-OSA alignment : access SCF
|
23.127
|
014
|
F
|
R99
|
Approved.
|
6 OSA
|
S2-001627
|
Siemens
|
CR on Parlay-OSA alignment: load manager SCF
|
23.127
|
015
|
F
|
R99
|
Approved.
|
6 OSA
|
S2-001628
|
Siemens
|
CR on Parlay-OSA alignment: fault manager SCF
|
23.127
|
016
|
F
|
R99
|
Approved.
|
6 OSA
|
S2-001629
|
Siemens
|
CR on Parlay-OSA alignment: service factory SCF
|
23.127
|
017
|
F
|
R99
|
Approved.
|
6 OSA
|
S2-001630
|
Siemens
|
CR on Parlay-OSA alignment: authentication interface
|
23.127
|
018
|
F
|
R99
|
Approved.
|
|
S2-001631
|
Mannesmann
|
|
|
|
|
|
For e-mail approval.
|
|
S2-001632
|
Siemens
|
CSCF Availability during the SIP Session
|
|
|
|
|
For e-mail approval.
|
|
S2-001633
|
Nokia
|
Role of the proxy CSCF after the registration procedure
|
|
|
|
|
Approved.
|
6 OSA
|
S2-001634
|
Ericsson
|
Change of TS 23.127 title for version 4.0 and up
|
23.127
|
011r1
|
D
|
R00
|
Approved.
|
|
S2-001635
|
SA2
|
Text for 23.228 from drafting session on S-CSCF Selection
|
|
|
|
|
Approved.
|
|
S2-001636
|
Drafting group on Call Flows
|
Result of the drafting on call flows.
|
|
|
|
|
For e-mail approval. 15th of September
|
|
S2-001637
|
SA2
|
LS to GERAN and R3 (Cc R2) on inter-BSC hard handover in GERAN for the packet switched domain
|
|
|
|
|
Approved.
|
|
S2-001638
|
N1-000973
|
LS on UMTS Service Request procedure
|
23.060
|
184
|
F
|
R99
|
For e-mail approval.
|
6
|
S2-001639
|
SA2
|
LS to S1 (Cc N5) on terminology in OSA specifications
|
|
|
|
|
Approved.
|
|
S2-001640
|
Drafting on Split GSN
|
Minutes of the drafting group
|
|
|
|
|
Revised to S2-001655.
Previous version of 23.873 is in S2-001378.
The next ad-hoc meeting is proposed to take place in Vancouver, hosted by Motorola, 17th to 19th of October.
|
|
S2-001641
|
Nokia
|
Many to many relationship on Iu interface
|
23.121
|
061
|
B
|
R00
|
|
|
S2-001642
|
MCC
|
Other term to refer to RAN+SGSN+GGSN
|
|
|
|
|
For e-mail approval.
|
5.3
|
S2-001643
|
Motorola
|
IP Address Management
|
|
|
|
|
For e-mail approval.
|
|
S2-001644
|
Nokia
|
Communication between the core and access networks
|
23.171
|
?
|
|
|
Editorially revised to S2-001656.
|
|
S2-001645
|
LCS convenor
|
Meeting report of the S2 LCS drafting session 7.9.2000
|
|
|
|
|
Noted. See individual conclusions on the tdocs handled by this drafting.
|
|
S2-001646
|
LCS
|
LS to R2 (Cc S1, R3) regarding an open interface between the SMLC and the SRNC within the UTRAN for LCS Support
|
|
|
|
|
For e-mail approval.
To be approved by e-mail by 18th September because some companies had already left the meeting when the LS was presented!
This process is accepted as an exceptional case.
|
|
S2-001647
|
NTT
|
Current status and work plan for the feasibility study of an architecture for push service
|
|
|
|
|
Approved in principle, but the version of the TR will depend of the content of the TR itself.
|
|
S2-001648
|
NTT
|
Proposed change to WI: A feasibility study of an architecture for network requested PDP context activation with User-ID
|
|
|
|
|
Revised to S2-001660.
|
|
S2-001649
|
NTT
|
23.874 v.0.0.3 on Push services
|
23.874
|
|
|
|
Raised in v.1 in S2-001659.
|
|
S2-001650
|
NTT
|
Invitation for S2#15
|
|
|
|
|
Noted.
|
|
S2-001651
|
SA2
|
LS
|
|
|
|
|
For e-mail approval.
|
|
S2-001652
|
Editor
|
23.873 v.0.2.0
|
|
|
|
|
To be sent by e-mail before 12th and approved by 15th.
|
|
S2-001653
|
Ericsson
|
LS on Cellular Text telephone Modem approval from T1P1.3
|
|
|
|
|
Not handled.
|
|
S2-001654
|
NTT
|
Correction on Iu Release Procedure
|
23.060
|
178r1
|
F
|
R99
|
Approved.
|
|
S2-001655
|
Split archi convenor
|
|
|
|
|
|
Approved (to be sent by e-mail).
|
|
S2-001656
|
Nokia
|
Communication between the core and access networks
|
23.171
|
004
|
D
|
R99
|
Approved.
|
|
S2-001657
|
Editor
|
|
23.271
|
|
|
|
For e-mail approval. To be presented to SA in version 1. To be sent by e-mail on 11th, deadline for comment 15th.
|
|
S2-001658
|
N4-000713
|
LS on SRNS relocation based on global title
|
|
|
|
|
Proposed answer in S2-001658. Linked with S2-001469. Proposed answer in S2-001661
|
|
S2-001659
|
NTT
|
23.874 v.1.0.0 on Push services
|
23.874
|
|
|
|
Approved. To be presented to SA#9.
|
|
S2-001660
|
NTT
|
Proposed change to WI: A feasibility study of an architecture for network requested PDP context activation with User-ID
|
|
|
|
|
Approved. To be presented to SA#9.
|
|
S2-001661
|
Ericsson
|
|
|
|
|
|
For e-mail approval.
|
|
S2-001662
|
Ericsson
|
Proposed answer to S2-001384
|
|
|
|
|
For e-mail approval.
|
|
S2-001663
|
Nortel
|
|
|
|
|
|
|
This table encompass the conclusions of the tdocs handled by e-mail, as provided by Mr. Yukio Hiramatsu in tdoc S2-001715.